Côte départ Ballages

📍
Les Ballages, Combronde, Riom, Puy-de-Dôme, Auvergne-Rhône-Alpes, Metropolitan France, 63460, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Côte départ Ballages...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Côte départ Ballages.

565 m585 m610 m630 m8.0% from 0 m to 3 m4.0% from 3 m to 5 m3.6% from 5 m to 8 m23.8% from 8 m to 10 m4.9% from 10 m to 14 m7.7% from 14 m to 17 m3.8% from 17 m to 19 m3.7% from 19 m to 22 m7.7% from 22 m to 25 m7.7% from 25 m to 27 m7.7% from 27 m to 30 m7.7% from 30 m to 32 m4.0% from 32 m to 35 m3.8% from 35 m to 37 m0.0% from 37 m to 40 m8.3% from 40 m to 42 m4.0% from 42 m to 45 m4.0% from 45 m to 47 m4.0% from 47 m to 50 m0.0% from 50 m to 52 m4.0% from 52 m to 55 m0.0% from 55 m to 57 m3.7% from 57 m to 60 m3.7% from 60 m to 63 m7.1% from 63 m to 66 m0.0% from 66 m to 69 m3.2% from 69 m to 72 m3.3% from 72 m to 75 m9.7% from 75 m to 78 m10.0% from 78 m to 81 m6.9% from 81 m to 84 m6.3% from 84 m to 87 m6.5% from 87 m to 90 m3.2% from 90 m to 93 m9.4% from 93 m to 96 m60.0% from 96 m to 97 m7.7% from 97 m to 99 m7.1% from 99 m to 102 m3.0% from 102 m to 105 m6.5% from 105 m to 109 m6.9% from 109 m to 111 m11.1% from 111 m to 114 m7.7% from 114 m to 117 m3.3% from 117 m to 120 m-3.2% from 120 m to 123 m6.7% from 123 m to 126 m14.3% from 126 m to 129 m3.7% from 129 m to 131 m0.0% from 131 m to 134 m6.1% from 134 m to 139 m8.0% from 139 m to 142 m8.0% from 142 m to 144 m8.0% from 144 m to 147 m12.0% from 147 m to 149 m2.1% from 149 m to 154 m8.3% from 154 m to 156 m8.3% from 156 m to 159 m4.0% from 159 m to 161 m7.4% from 161 m to 164 m2.9% from 164 m to 167 m3.7% from 167 m to 170 m7.7% from 170 m to 173 m8.0% from 173 m to 175 m7.7% from 175 m to 178 m17.4% from 178 m to 180 m14.8% from 180 m to 183 m14.8% from 183 m to 185 m11.1% from 185 m to 188 m10.0% from 188 m to 192 m4.2% from 192 m to 202 m10.0% from 202 m to 206 m19.2% from 206 m to 208 m22.2% from 208 m to 211 m23.1% from 211 m to 213 m19.2% from 213 m to 216 m15.4% from 216 m to 219 m17.9% from 219 m to 221 m14.3% from 221 m to 224 m21.4% from 224 m to 227 m76.9% from 227 m to 230 m15.4% from 230 m to 232 m16.0% from 232 m to 235 m48.1% from 235 m to 237 m18.5% from 237 m to 240 m10.3% from 240 m to 243 m9.1% from 243 m to 245 m7.4% from 245 m to 248 m10.3% from 248 m to 251 m18.5% from 251 m to 254 m17.9% from 254 m to 256 m22.7% from 256 m to 259 m14.8% from 259 m to 261 m14.3% from 261 m to 264 m17.9% from 264 m to 267 m10.0% from 267 m to 270 m22.2% from 270 m to 272 m14.3% from 272 m to 274 m7.4% from 274 m to 277 m6.9% from 277 m to 280 m7.1% from 280 m to 283 m14.3% from 283 m to 285 m10.7% from 285 m to 288 m14.3% from 288 m to 291 m10.3% from 291 m to 293 m18.5% from 293 m to 296 m21.1% from 296 m to 298 m15.4% from 298 m to 301 m19.2% from 301 m to 303 m16.0% from 303 m to 306 m15.4% from 306 m to 308 m14.3% from 308 m to 311 m11.1% from 311 m to 314 m7.4% from 314 m to 317 m11.5% from 317 m to 319 m15.4% from 319 m to 322 m13.0% from 322 m to 324 m14.8% from 324 m to 327 m14.3% from 327 m to 330 m18.5% from 330 m to 332 m17.9% from 332 m to 335 m20.8% from 335 m to 337 m22.2% from 337 m to 340 m19.2% from 340 m to 343 m19.2% from 343 m to 345 m18.5% from 345 m to 348 m14.8% from 348 m to 351 m14.8% from 351 m to 353 m10.7% from 353 m to 356 m14.8% from 356 m to 359 m14.8% from 359 m to 362 m23.8% from 362 m to 364 m14.8% from 364 m to 366 m17.2% from 366 m to 369 m17.2% from 369 m to 372 m18.5% from 372 m to 375 m27.8% from 375 m to 377 m14.3% from 377 m to 380 m14.8% from 380 m to 382 m18.5% from 382 m to 385 m15.4% from 385 m to 388 m23.8% from 388 m to 390 m18.5% from 390 m to 392 m15.4% from 392 m to 395 m10.7% from 395 m to 398 m7.7% from 398 m to 400 m15.8% from 400 m to 402 m6.9% from 402 m to 405 m11.1% from 405 m to 408 m7.1% from 408 m to 411 m10.7% from 411 m to 413 m21.4% from 413 m to 415 m16.0% from 415 m to 417 m14.8% from 417 m to 420 m14.3% from 420 m to 423 m11.1% from 423 m to 426 m14.3% from 426 m to 428 m11.5% from 428 m to 430 m7.4% from 430 m to 433 m7.4% from 433 m to 436 m7.7% from 436 m to 438 m4.2% from 438 m to 441 m7.4% from 441 m to 443 m7.1% from 443 m to 446 m6.9% from 446 m to 449 m7.1% from 449 m to 452 m12.5% from 452 m to 453 m3.8% from 453 m to 456 m3.8% from 456 m to 459 m3.7% from 459 m to 461 m3.6% from 461 m to 464 m4.8% from 464 m to 466 m3.6% from 466 m to 469 m0.0% from 469 m to 472 m0.0% from 472 m to 474 m3.4% from 474 m to 477 m-6.3% from 477 m to 479 m-3.4% from 479 m to 482 m-3.7% from 482 m to 485 m0.0% from 485 m to 487 m0.0% from 487 m to 490 m0.0% from 490 m to 492 m-8.0% from 492 m to 494 m-3.8% from 494 m to 497 m-12.5% from 497 m to 499 m-7.7% from 499 m to 502 m-13.0% from 502 m to 504 m-3.8% from 504 m to 507 m-7.1% from 507 m to 509 m-3.7% from 509 m to 512 m-2.5% from 512 m to 516 m0.0% from 516 m to 526 m0.0% from 526 m to 530 m0.0% from 530 m to 532 m0.0% from 532 m to 535 m-3.7% from 535 m to 538 m3.7% from 538 m to 540 m0.0% from 540 m to 543 m0.0% from 543 m to 545 m0.0% from 545 m to 547 m5.3% from 547 m to 549 m5.0% from 549 m to 551 m0.0% from 551 m to 553 m4.3% from 553 m to 556 m0.0% from 556 m to 558 m5.0% from 558 m to 560 m4.8% from 560 m to 562 m5.0% from 562 m to 564 m5.0% from 564 m to 566 m5.3% from 566 m to 568 m0.0% from 568 m to 570 m2.1% from 570 m to 575 m4.0% from 575 m to 577 m5.6% from 577 m to 579 m5.6% from 579 m to 581 m5.9% from 581 m to 583 m5.3% from 583 m to 584 m5.3% from 584 m to 586 m11.1% from 586 m to 588 m5.3% from 588 m to 590 m5.3% from 590 m to 592 m4.8% from 592 m to 594 m4.8% from 594 m to 596 m4.8% from 596 m to 598 m9.1% from 598 m to 600 m4.3% from 600 m to 603 m8.7% from 603 m to 605 m4.3% from 605 m to 607 m7.7% from 607 m to 610 m4.2% from 610 m to 612 m4.2% from 612 m to 615 m8.0% from 615 m to 617 m4.3% from 617 m to 620 m4.3% from 620 m to 622 m4.3% from 622 m to 624 m10.0% from 624 m to 626 m4.3% from 626 m to 628 m3.8% from 628 m to 631 m4.2% from 631 m to 633 m21.7% from 633 m to 636 m8.7% from 636 m to 638 m8.7% from 638 m to 640 m33.3% from 640 m to 642 m13.6% from 642 m to 645 m14.3% from 645 m to 647 m23.1% from 647 m to 648 m10.0% from 648 m to 650 m4.5% from 650 m to 652 m4.5% from 652 m to 654 m5.6% from 654 m to 658 m0.0% from 658 m to 665 m3.7% from 665 m to 668 m4.8% from 668 m to 670 m0.0% from 670 m to 672 m3.6% from 672 m to 675 m0.0% from 675 m to 678 m3.6% from 678 m to 681 m0.0% from 681 m to 684 m3.4% from 684 m to 686 m0.0% from 686 m to 689 m0.0% from 689 m to 692 m0.0% from 692 m to 695 m0.0% from 695 m to 698 m0.0% from 698 m to 701 m3.3% from 701 m to 704 m0.0% from 704 m to 707 m-3.6% from 707 m to 710 m0.0% from 710 m to 712 m0.0% from 712 m to 715 m0.0% from 715 m to 718 m-3.6% from 718 m to 720 m0.0% from 720 m to 723 m0.0% from 723 m to 726 m0.0% from 726 m to 729 m0.0% from 729 m to 732 m0.0% from 732 m to 734 m3.7% from 734 m to 737 m3.7% from 737 m to 740 m-3.6% from 740 m to 743 m0.0% from 743 m to 745 m0.0% from 745 m to 748 m0.0% from 748 m to 751 m0.0% from 751 m to 754 m0.0% from 754 m to 758 m0.0% from 758 m to 760 m0.0% from 760 m to 763 m0.0% from 763 m to 766 m0.0% from 766 m to 769 m0.0% from 769 m to 772 m3.4% from 772 m to 775 m0.0% from 775 m to 779 m0.0% from 779 m to 782 m-2.6% from 782 m to 786 m-2.5% from 786 m to 790 m-20.0% from 790 m to 791 m-4.1% from 791 m to 796 m-3.8% from 796 m to 801 m-7.4% from 801 m to 807 m-6.8% from 807 m to 812 m-50.0% from 812 m to 814 m-18.7% from 814 m to 816 m-18.8% from 816 m to 817 m9%11%3%-4%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.82 km / 0.51 miles
Elevation gain55.1 m / 181 ft
Average gradient6.7%
Maximum gradient46.8%
Elevation high626.9 m / 2,057 ft
Elevation low568.8 m / 1,866 ft
Climb difficulty score5,507.93

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
mur de banson
Combronde, Puy-de-Dôme
0.98 km6.2%60 m
Montée de l'étang de Chalusset
Combronde, Puy-de-Dôme
1.01 km3.6%36 m
Grimpette dans la forêt
Combronde, Puy-de-Dôme
0.43 km9.6%41 m
Banson Climb
Combronde, Puy-de-Dôme
1.61 km5.2%83 m
Jouffrets 1ère partie
Combronde, Puy-de-Dôme
1.75 km5.8%101 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,022,130th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 131,043rd most difficult cycling climb of all 342,105 climbs in France.

📉

Places 39,411th out of 68,974 cycling climbs in Auvergne-Rhône-Alpes.

Ranks 3,500th out of 6,423 cycling climbs in Puy-de-Dôme.

Ranking 11th out of 17 cycling climbs in Combronde.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb