CHR Academy to R100 Top

📍
Carretera Senador Antonio J. "Tony" Fas Alzamora, Pedernales, Cabo Rojo, Puerto Rico, 00623, United States
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for CHR Academy to R100 Top...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of CHR Academy to R100 Top.

35 m60 m90 m115 m2.6% from 0 m to 8 m2.6% from 8 m to 16 m10.0% from 16 m to 23 m14.7% from 23 m to 30 m15.2% from 30 m to 38 m14.7% from 38 m to 45 m19.1% from 45 m to 52 m24.6% from 52 m to 59 m24.7% from 59 m to 66 m24.6% from 66 m to 73 m25.8% from 73 m to 80 m16.4% from 80 m to 86 m15.2% from 86 m to 93 m16.1% from 93 m to 99 m17.5% from 99 m to 105 m18.5% from 105 m to 112 m1.4% from 112 m to 119 m3.1% from 119 m to 125 m3.3% from 125 m to 131 m2.8% from 131 m to 138 m-1.5% from 138 m to 145 m-13.9% from 145 m to 152 m-14.5% from 152 m to 159 m-14.1% from 159 m to 166 m-14.3% from 166 m to 173 m-10.0% from 173 m to 180 m-9.1% from 180 m to 186 m-7.4% from 186 m to 193 m-8.7% from 193 m to 200 m-6.1% from 200 m to 207 m3.1% from 207 m to 213 m3.0% from 213 m to 220 m4.3% from 220 m to 227 m3.0% from 227 m to 233 m4.4% from 233 m to 240 m26.2% from 240 m to 247 m26.5% from 247 m to 253 m29.0% from 253 m to 260 m27.0% from 260 m to 266 m30.2% from 266 m to 272 m28.8% from 272 m to 279 m20.9% from 279 m to 286 m21.2% from 286 m to 292 m20.0% from 292 m to 299 m19.7% from 299 m to 306 m2.9% from 306 m to 313 m-1.5% from 313 m to 319 m1.4% from 319 m to 326 m5.7% from 326 m to 333 m8.7% from 333 m to 340 m1.5% from 340 m to 347 m-2.9% from 347 m to 353 m0.0% from 353 m to 361 m2.8% from 361 m to 368 m5.6% from 368 m to 375 m7.4% from 375 m to 382 m6.6% from 382 m to 389 m8.7% from 389 m to 396 m10.4% from 396 m to 403 m14.1% from 403 m to 410 m18.4% from 410 m to 418 m17.4% from 418 m to 425 m17.6% from 425 m to 432 m20.6% from 432 m to 438 m19.4% from 438 m to 445 m16.7% from 445 m to 453 m13.4% from 453 m to 459 m1.4% from 459 m to 467 m-2.7% from 467 m to 474 m-4.1% from 474 m to 481 m-9.7% from 481 m to 487 m-14.1% from 487 m to 494 m-13.8% from 494 m to 500 m-15.3% from 500 m to 506 m-13.8% from 506 m to 513 m-14.5% from 513 m to 520 m-8.3% from 520 m to 526 m-1.6% from 526 m to 532 m-1.8% from 532 m to 538 m1.8% from 538 m to 543 m5.0% from 543 m to 549 m3.8% from 549 m to 554 m13.2% from 554 m to 560 m16.7% from 560 m to 566 m16.7% from 566 m to 571 m16.4% from 571 m to 577 m17.9% from 577 m to 582 m12.5% from 582 m to 588 m8.9% from 588 m to 593 m12.1% from 593 m to 599 m10.2% from 599 m to 605 m16.1% from 605 m to 611 m18.3% from 611 m to 617 m18.0% from 617 m to 623 m15.8% from 623 m to 629 m15.3% from 629 m to 635 m15.5% from 635 m to 641 m14.5% from 641 m to 646 m13.6% from 646 m to 652 m1.6% from 652 m to 659 m-10.6% from 659 m to 665 m-13.0% from 665 m to 672 m-12.3% from 672 m to 678 m-14.3% from 678 m to 683 m-10.0% from 683 m to 689 m1.8% from 689 m to 695 m4.8% from 695 m to 701 m4.7% from 701 m to 708 m5.4% from 708 m to 713 m5.1% from 713 m to 719 m11.3% from 719 m to 725 m10.8% from 725 m to 732 m8.2% from 732 m to 738 m8.3% from 738 m to 744 m11.1% from 744 m to 749 m6.5% from 749 m to 756 m6.5% from 756 m to 762 m6.1% from 762 m to 768 m5.2% from 768 m to 774 m5.0% from 774 m to 780 m10.2% from 780 m to 786 m13.8% from 786 m to 792 m8.2% from 792 m to 797 m10.7% from 797 m to 802 m12.1% from 802 m to 808 m8.2% from 808 m to 814 m7.5% from 814 m to 820 m4.8% from 820 m to 826 m5.1% from 826 m to 832 m5.1% from 832 m to 838 m3.7% from 838 m to 843 m-9.3% from 843 m to 849 m-9.4% from 849 m to 855 m-9.1% from 855 m to 860 m-9.4% from 860 m to 867 m-9.4% from 867 m to 872 m-8.5% from 872 m to 878 m-10.0% from 878 m to 884 m-9.1% from 884 m to 890 m-9.1% from 890 m to 895 m-9.4% from 895 m to 901 m-3.6% from 901 m to 907 m0.0% from 907 m to 913 m1.7% from 913 m to 919 m1.7% from 919 m to 925 m1.7% from 925 m to 930 m0.0% from 930 m to 936 m12.3% from 936 m to 941 m11.9% from 941 m to 947 m12.5% from 947 m to 953 m12.0% from 953 m to 958 m12.1% from 958 m to 964 m11.5% from 964 m to 970 m7.3% from 970 m to 975 m7.1% from 975 m to 981 m10.3% from 981 m to 987 m11.1% from 987 m to 993 m12.3% from 993 m to 999 m11.1% from 999 m to 1.0 km8.1% from 1.0 km to 1.0 km9.2% from 1.0 km to 1.0 km7.9% from 1.0 km to 1.0 km1.6% from 1.0 km to 1.0 km-15.0% from 1.0 km to 1.0 km-16.7% from 1.0 km to 1.0 km-18.5% from 1.0 km to 1.0 km-20.3% from 1.0 km to 1.1 km-17.9% from 1.1 km to 1.1 km-12.1% from 1.1 km to 1.1 km-11.0% from 1.1 km to 1.1 km-6.1% from 1.1 km to 1.1 km-8.2% from 1.1 km to 1.1 km12.3% from 1.1 km to 1.1 km27.1% from 1.1 km to 1.1 km26.2% from 1.1 km to 1.1 km28.8% from 1.1 km to 1.1 km28.2% from 1.1 km to 1.1 km21.4% from 1.1 km to 1.1 km17.1% from 1.1 km to 1.1 km16.2% from 1.1 km to 1.1 km16.4% from 1.1 km to 1.2 km19.7% from 1.2 km to 1.2 km15.6% from 1.2 km to 1.2 km11.4% from 1.2 km to 1.2 km8.3% from 1.2 km to 1.2 km2.7% from 1.2 km to 1.2 km-1.4% from 1.2 km to 1.2 km-7.1% from 1.2 km to 1.2 km-10.7% from 1.2 km to 1.2 km-16.4% from 1.2 km to 1.2 km-18.4% from 1.2 km to 1.2 km-19.7% from 1.2 km to 1.2 km-20.5% from 1.2 km to 1.2 km-15.9% from 1.2 km to 1.2 km-12.7% from 1.2 km to 1.3 km-12.5% from 1.3 km to 1.3 km-13.9% from 1.3 km to 1.3 km-12.7% from 1.3 km to 1.3 km-10.1% from 1.3 km to 1.3 km-5.5% from 1.3 km to 1.3 km2.6% from 1.3 km to 1.3 km6.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.2% from 1.3 km to 1.3 km8.7% from 1.3 km to 1.3 km14.5% from 1.3 km to 1.3 km21.4% from 1.3 km to 1.3 km29.5% from 1.3 km to 1.4 km1.3% from 1.4 km to 1.4 km-5.3% from 1.4 km to 1.4 km2.6% from 1.4 km to 1.4 km10.4% from 1.4 km to 1.4 km18.8% from 1.4 km to 1.4 km16.2% from 1.4 km to 1.4 km13.9% from 1.4 km to 1.4 km10.4% from 1.4 km to 1.4 km18.6% from 1.4 km to 1.4 km25.9% from 1.4 km to 1.4 km4.8% from 1.4 km to 1.4 km12.2% from 1.4 km to 1.4 km2.2% from 1.4 km to 1.5 km-1.2% from 1.5 km to 1.5 km-5.7% from 1.5 km to 1.5 km6%10%5%3%1%5%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.47 km / 0.92 miles
Elevation gain121.3 m / 398 ft
Average gradient5.2%
Maximum gradient28.7%
Elevation high112.8 m / 370 ft
Elevation low35.6 m / 117 ft
Climb difficulty score7,663.24

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Puerto Rico 307 Climb
Cabo Rojo, Pedernales
2.62 km4.6%120 m
Repechito Recoleta By:Pancho
Cabo Rojo, Pedernales
0.91 km3.7%33 m
Camino del tunel alreves
Cabo Rojo, Pedernales
1.09 km1.1%12 m
Los Martinez Uphill CR-Boqueron
Cabo Rojo, Pedernales
0.4 km8.6%34 m
last climb 307
Cabo Rojo, Pedernales
0.26 km8%23 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 787,014th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 67,786th most difficult cycling climb of all 337,250 climbs in United States.

📉

Places 555th out of 1,684 cycling climbs in Puerto Rico.

🥈️

This is the second most difficult cycling climb in Pedernales.

🥈️

This is the second most difficult cycling climb in Cabo Rojo.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb