75 to Linganore Climb

📍
7799, Green Valley Road, Woodspring, New London, Frederick County, Maryland, 21701, United States
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for 75 to Linganore Climb...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of 75 to Linganore Climb.

110 m130 m145 m165 m0.0% from 0 m to 5 m0.0% from 5 m to 10 m1.9% from 10 m to 15 m0.9% from 15 m to 26 m0.0% from 26 m to 33 m0.0% from 33 m to 38 m0.0% from 38 m to 42 m-1.9% from 42 m to 47 m0.0% from 47 m to 53 m0.0% from 53 m to 58 m-1.7% from 58 m to 64 m-3.7% from 64 m to 69 m-6.3% from 69 m to 74 m-3.5% from 74 m to 79 m2.0% from 79 m to 84 m2.0% from 84 m to 89 m2.2% from 89 m to 94 m4.5% from 94 m to 103 m8.3% from 103 m to 108 m8.8% from 108 m to 111 m9.3% from 111 m to 116 m3.8% from 116 m to 122 m2.0% from 122 m to 127 m3.9% from 127 m to 132 m2.5% from 132 m to 140 m2.5% from 140 m to 144 m0.0% from 144 m to 148 m3.3% from 148 m to 157 m2.0% from 157 m to 162 m3.8% from 162 m to 168 m4.3% from 168 m to 172 m4.1% from 172 m to 184 m10.4% from 184 m to 189 m9.3% from 189 m to 195 m2.4% from 195 m to 203 m8.1% from 203 m to 207 m8.5% from 207 m to 211 m5.3% from 211 m to 215 m2.2% from 215 m to 220 m-3.0% from 220 m to 223 m4.3% from 223 m to 228 m5.4% from 228 m to 231 m5.7% from 231 m to 237 m8.9% from 237 m to 241 m10.6% from 241 m to 246 m5.0% from 246 m to 250 m6.0% from 250 m to 255 m7.3% from 255 m to 263 m8.7% from 263 m to 268 m7.0% from 268 m to 272 m6.8% from 272 m to 281 m6.2% from 281 m to 289 m4.2% from 289 m to 294 m2.0% from 294 m to 299 m2.9% from 299 m to 309 m1.9% from 309 m to 320 m-3.9% from 320 m to 330 m-3.9% from 330 m to 335 m-4.0% from 335 m to 340 m-1.9% from 340 m to 350 m1.6% from 350 m to 357 m-2.0% from 357 m to 362 m-1.7% from 362 m to 368 m0.0% from 368 m to 373 m-2.6% from 373 m to 377 m6.8% from 377 m to 381 m0.0% from 381 m to 385 m4.8% from 385 m to 389 m2.8% from 389 m to 392 m4.8% from 392 m to 397 m3.2% from 397 m to 400 m2.4% from 400 m to 404 m2.5% from 404 m to 408 m4.8% from 408 m to 412 m3.7% from 412 m to 420 m2.5% from 420 m to 424 m2.7% from 424 m to 428 m0.0% from 428 m to 431 m2.9% from 431 m to 435 m2.9% from 435 m to 438 m0.0% from 438 m to 442 m3.0% from 442 m to 445 m3.2% from 445 m to 448 m2.9% from 448 m to 452 m3.0% from 452 m to 455 m2.9% from 455 m to 458 m3.3% from 458 m to 464 m3.1% from 464 m to 468 m2.0% from 468 m to 473 m1.8% from 473 m to 478 m3.2% from 478 m to 482 m3.0% from 482 m to 488 m3.1% from 488 m to 495 m3.0% from 495 m to 498 m6.3% from 498 m to 501 m3.6% from 501 m to 507 m4.8% from 507 m to 513 m6.5% from 513 m to 516 m9.4% from 516 m to 519 m6.0% from 519 m to 526 m15.2% from 526 m to 529 m17.5% from 529 m to 533 m9.9% from 533 m to 552 m5.4% from 552 m to 558 m3.0% from 558 m to 561 m2.9% from 561 m to 565 m3.1% from 565 m to 568 m1.8% from 568 m to 573 m3.0% from 573 m to 577 m0.0% from 577 m to 584 m0.0% from 584 m to 590 m0.0% from 590 m to 596 m0.0% from 596 m to 605 m1.8% from 605 m to 610 m4.8% from 610 m to 616 m6.9% from 616 m to 619 m5.7% from 619 m to 623 m9.5% from 623 m to 630 m10.8% from 630 m to 634 m10.8% from 634 m to 640 m8.8% from 640 m to 644 m4.8% from 644 m to 650 m3.1% from 650 m to 653 m3.0% from 653 m to 656 m2.4% from 656 m to 665 m3.4% from 665 m to 671 m2.9% from 671 m to 678 m2.8% from 678 m to 681 m2.6% from 681 m to 685 m1.4% from 685 m to 692 m2.6% from 692 m to 696 m1.4% from 696 m to 704 m2.6% from 704 m to 708 m5.1% from 708 m to 711 m2.7% from 711 m to 715 m2.8% from 715 m to 719 m5.1% from 719 m to 723 m2.3% from 723 m to 727 m5.0% from 727 m to 731 m5.3% from 731 m to 735 m5.0% from 735 m to 739 m7.0% from 739 m to 743 m9.8% from 743 m to 747 m10.7% from 747 m to 756 m11.1% from 756 m to 760 m9.8% from 760 m to 764 m5.1% from 764 m to 768 m4.8% from 768 m to 772 m0.0% from 772 m to 776 m0.0% from 776 m to 781 m0.0% from 781 m to 785 m0.0% from 785 m to 789 m0.0% from 789 m to 793 m0.0% from 793 m to 797 m-2.6% from 797 m to 801 m-1.3% from 801 m to 808 m-2.2% from 808 m to 813 m0.0% from 813 m to 817 m-1.9% from 817 m to 823 m0.0% from 823 m to 827 m-2.2% from 827 m to 832 m-2.3% from 832 m to 836 m-4.0% from 836 m to 841 m-2.0% from 841 m to 846 m2.1% from 846 m to 856 m-3.8% from 856 m to 861 m-9.8% from 861 m to 867 m-12.5% from 867 m to 873 m-17.9% from 873 m to 880 m-9.3% from 880 m to 885 m-10.6% from 885 m to 889 m-10.3% from 889 m to 896 m-6.1% from 896 m to 901 m0.0% from 901 m to 906 m1.5% from 906 m to 913 m-1.1% from 913 m to 922 m0.0% from 922 m to 927 m0.0% from 927 m to 937 m5.0% from 937 m to 943 m8.5% from 943 m to 947 m5.9% from 947 m to 953 m3.5% from 953 m to 958 m7.4% from 958 m to 964 m6.4% from 964 m to 968 m4.3% from 968 m to 973 m6.8% from 973 m to 977 m9.3% from 977 m to 983 m3.2% from 983 m to 989 m5.9% from 989 m to 999 m4.3% from 999 m to 1.0 km2.1% from 1.0 km to 1.0 km4.5% from 1.0 km to 1.0 km2.4% from 1.0 km to 1.0 km5.0% from 1.0 km to 1.0 km5.1% from 1.0 km to 1.0 km4.7% from 1.0 km to 1.0 km2.4% from 1.0 km to 1.0 km4.8% from 1.0 km to 1.0 km2.5% from 1.0 km to 1.0 km6.3% from 1.0 km to 1.0 km12.5% from 1.0 km to 1.1 km13.9% from 1.1 km to 1.1 km12.8% from 1.1 km to 1.1 km13.5% from 1.1 km to 1.1 km10.5% from 1.1 km to 1.1 km13.2% from 1.1 km to 1.1 km10.8% from 1.1 km to 1.1 km7.7% from 1.1 km to 1.1 km10.3% from 1.1 km to 1.1 km7.9% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km7.4% from 1.1 km to 1.1 km10.8% from 1.1 km to 1.1 km11.9% from 1.1 km to 1.1 km6.8% from 1.1 km to 1.1 km6.3% from 1.1 km to 1.1 km10.0% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.2 km6.3% from 1.2 km to 1.2 km6.2% from 1.2 km to 1.2 km3.0% from 1.2 km to 1.2 km6.2% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km3.0% from 1.2 km to 1.2 km5.9% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km4.2% from 1.2 km to 1.2 km5.2% from 1.2 km to 1.2 km2.8% from 1.2 km to 1.2 km10.3% from 1.2 km to 1.2 km6.9% from 1.2 km to 1.2 km12.1% from 1.2 km to 1.2 km12.7% from 1.2 km to 1.2 km18.2% from 1.2 km to 1.2 km14.7% from 1.2 km to 1.2 km12.8% from 1.2 km to 1.2 km13.2% from 1.2 km to 1.2 km11.4% from 1.2 km to 1.2 km8.8% from 1.2 km to 1.2 km9.1% from 1.2 km to 1.2 km11.1% from 1.2 km to 1.3 km5.9% from 1.3 km to 1.3 km5.9% from 1.3 km to 1.3 km6.1% from 1.3 km to 1.3 km5.9% from 1.3 km to 1.3 km6.0% from 1.3 km to 1.3 km6.8% from 1.3 km to 1.3 km3%2%5%0%8%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.28 km / 0.80 miles
Elevation gain46.8 m / 154 ft
Average gradient3.7%
Maximum gradient15.6%
Elevation high160.4 m / 526 ft
Elevation low112.9 m / 370 ft
Climb difficulty score4,685.17

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
New London Road Steep
New London, Frederick County
0.69 km7%47 m
Lime Plant to Crickenberger
New London, Frederick County
1.89 km1.5%28 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,152,380th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 109,500th most difficult cycling climb of all 337,250 climbs in United States.

📉

Places 1,976th out of 8,798 cycling climbs in Maryland.

Ranks 449th out of 967 cycling climbs in Frederick County.

🥈️

This is the second most difficult cycling climb in New London.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb