PM Commute 4- Belleville- Homestead- Bridge- Mary
📍 Belleville Way, Sunnyvale, Santa Clara County, California, 94087, United States
Useful Links
View this climb on other sites.
| Google Street View |
| Strava |
Climb Stats
The most common and useful climbing metrics.
| Climb (Meters) | 42.4 m |
| Distance (Kilometers) | 4.43 km |
| Average Gradient | 0.6% |
| Climb Category | Uncategorised |
Detailed Climb Stats
Stuff for climbing nerds.
| Distance (Miles) | 2.75 miles |
| Distance (Raw) | 4,429.6 m |
| Elevation High | 111.2 m |
| Elevation Low | 81.4 m |
| Maximum Gradient | 8.3% |
| Climb Difficulty Score | 2,657.76 |
Social Climbing
All the important climbing popularity information.
💪 There are 1,236 recorded attempts by 218 individual cyclists. |
📈 That's an average of 5.67 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 1,640,265th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 175,062nd most difficult cycling climb of all 337,250 climbs in United States. |
📉 Places 40,962nd out of 66,571 cycling climbs in California. |
⚖ Ranks 2,226th out of 4,071 cycling climbs in Santa Clara County. |
⚖ Ranking 32nd out of 126 cycling climbs in Sunnyvale. |
Site Update – October 2024
Why No Updates?
[35/24] This Week In Cycling
[32/24] This Week In Cycling