River bridge to Railway bridge and a bit more

📍
Dovey Jubilee Bridge, Mathafarn, Glantwymyn, Cemmaes Road, Powys, Wales, SY20 8JY, United Kingdom

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)22.4 m
Distance (Kilometers)0.7 km
Average Gradient3.2%
Climb CategoryUncategorised

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)0.44 miles
Distance (Raw)703.8 m
Elevation High37.4 m
Elevation Low12 m
Maximum Gradient10.5%
Climb Difficulty Score2,238.08

Social Climbing

All the important climbing popularity information.

💪

There are 3,043 recorded attempts by 984 individual cyclists.

📈

That's an average of 3.09 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,786,300th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 187,825th most difficult cycling climb of all 332,744 climbs in United Kingdom.

📉

Places 19,349th out of 26,148 cycling climbs in Wales.

Ranks 2,347th out of 2,830 cycling climbs in Powys.

Ranking 11th out of 14 cycling climbs in Cemmaes Road.

The Latest Cycling News