Armsheugh woods climb

📍
Armsheuch Walk, Hurlford, East Ayrshire, Scotland, KA3 6HR, United Kingdom
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Armsheugh woods climb...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Armsheugh woods climb.

40 m50 m65 m75 m2.3% from 0 m to 4 m0.0% from 4 m to 9 m0.0% from 9 m to 13 m0.0% from 13 m to 17 m0.0% from 17 m to 21 m0.0% from 21 m to 26 m0.0% from 26 m to 29 m0.0% from 29 m to 33 m0.0% from 33 m to 36 m0.0% from 36 m to 42 m0.0% from 42 m to 45 m0.0% from 45 m to 49 m2.4% from 49 m to 53 m0.0% from 53 m to 57 m0.0% from 57 m to 60 m0.0% from 60 m to 63 m3.1% from 63 m to 67 m3.2% from 67 m to 73 m2.6% from 73 m to 77 m2.9% from 77 m to 80 m3.0% from 80 m to 83 m5.6% from 83 m to 87 m1.9% from 87 m to 92 m3.2% from 92 m to 95 m2.8% from 95 m to 99 m3.1% from 99 m to 102 m2.9% from 102 m to 106 m4.7% from 106 m to 110 m5.0% from 110 m to 114 m5.2% from 114 m to 120 m3.0% from 120 m to 123 m2.8% from 123 m to 127 m2.9% from 127 m to 130 m3.1% from 130 m to 133 m5.0% from 133 m to 137 m2.3% from 137 m to 142 m4.9% from 142 m to 146 m2.6% from 146 m to 150 m4.7% from 150 m to 154 m2.0% from 154 m to 159 m3.9% from 159 m to 164 m2.5% from 164 m to 168 m3.0% from 168 m to 171 m1.8% from 171 m to 177 m4.8% from 177 m to 183 m6.8% from 183 m to 187 m6.5% from 187 m to 192 m4.7% from 192 m to 196 m5.0% from 196 m to 200 m5.1% from 200 m to 204 m4.1% from 204 m to 209 m5.9% from 209 m to 212 m6.5% from 212 m to 217 m6.0% from 217 m to 222 m6.5% from 222 m to 227 m6.2% from 227 m to 231 m4.7% from 231 m to 236 m7.7% from 236 m to 240 m5.3% from 240 m to 243 m11.1% from 243 m to 247 m8.6% from 247 m to 251 m6.3% from 251 m to 254 m6.2% from 254 m to 257 m8.6% from 257 m to 260 m7.1% from 260 m to 265 m5.3% from 265 m to 268 m7.7% from 268 m to 272 m8.6% from 272 m to 276 m7.5% from 276 m to 281 m6.5% from 281 m to 284 m3.1% from 284 m to 287 m7.5% from 287 m to 291 m4.3% from 291 m to 296 m2.6% from 296 m to 300 m5.4% from 300 m to 304 m2.3% from 304 m to 308 m2.4% from 308 m to 312 m3.2% from 312 m to 315 m6.1% from 315 m to 319 m8.3% from 319 m to 322 m2.9% from 322 m to 326 m5.6% from 326 m to 329 m5.6% from 329 m to 333 m2.9% from 333 m to 336 m5.1% from 336 m to 340 m5.4% from 340 m to 344 m7.7% from 344 m to 348 m5.6% from 348 m to 353 m6.5% from 353 m to 356 m6.7% from 356 m to 359 m5.6% from 359 m to 363 m5.0% from 363 m to 367 m7.8% from 367 m to 372 m5.9% from 372 m to 377 m6.8% from 377 m to 381 m6.5% from 381 m to 385 m6.3% from 385 m to 388 m9.5% from 388 m to 392 m5.2% from 392 m to 398 m2.6% from 398 m to 402 m4.9% from 402 m to 406 m4.3% from 406 m to 410 m4.8% from 410 m to 415 m5.0% from 415 m to 419 m2.2% from 419 m to 423 m0.0% from 423 m to 427 m2.9% from 427 m to 431 m0.0% from 431 m to 434 m3.1% from 434 m to 437 m0.0% from 437 m to 442 m2.2% from 442 m to 447 m0.0% from 447 m to 452 m1.8% from 452 m to 458 m2.9% from 458 m to 461 m2.5% from 461 m to 465 m2.6% from 465 m to 469 m3.1% from 469 m to 472 m2.5% from 472 m to 476 m0.0% from 476 m to 480 m4.4% from 480 m to 484 m2.2% from 484 m to 489 m4.5% from 489 m to 493 m5.6% from 493 m to 497 m3.6% from 497 m to 503 m5.9% from 503 m to 506 m6.1% from 506 m to 509 m2.9% from 509 m to 513 m5.6% from 513 m to 516 m5.2% from 516 m to 522 m6.3% from 522 m to 525 m7.1% from 525 m to 531 m10.8% from 531 m to 535 m8.1% from 535 m to 538 m7.1% from 538 m to 544 m7.4% from 544 m to 549 m7.1% from 549 m to 555 m8.6% from 555 m to 561 m8.6% from 561 m to 564 m5.6% from 564 m to 568 m-3.3% from 568 m to 571 m3.3% from 571 m to 577 m0.0% from 577 m to 580 m0.0% from 580 m to 584 m2.9% from 584 m to 587 m-3.1% from 587 m to 590 m0.0% from 590 m to 594 m0.0% from 594 m to 597 m2.9% from 597 m to 601 m-3.2% from 601 m to 604 m3.0% from 604 m to 607 m5.4% from 607 m to 611 m2.9% from 611 m to 614 m-2.9% from 614 m to 618 m2.9% from 618 m to 621 m1.8% from 621 m to 627 m3.4% from 627 m to 633 m0.0% from 633 m to 636 m-2.7% from 636 m to 640 m0.0% from 640 m to 643 m0.0% from 643 m to 647 m0.0% from 647 m to 652 m-3.2% from 652 m to 655 m0.0% from 655 m to 659 m-2.0% from 659 m to 664 m-2.0% from 664 m to 669 m0.0% from 669 m to 674 m0.0% from 674 m to 679 m-2.7% from 679 m to 683 m0.0% from 683 m to 686 m0.0% from 686 m to 691 m0.0% from 691 m to 696 m0.0% from 696 m to 701 m0.0% from 701 m to 708 m0.0% from 708 m to 712 m2.2% from 712 m to 716 m-2.4% from 716 m to 721 m0.0% from 721 m to 724 m0.0% from 724 m to 729 m1.7% from 729 m to 735 m-2.8% from 735 m to 739 m3.0% from 739 m to 742 m-3.0% from 742 m to 745 m0.0% from 745 m to 748 m-3.2% from 748 m to 752 m1.8% from 752 m to 757 m0.0% from 757 m to 763 m0.0% from 763 m to 767 m0.0% from 767 m to 771 m2.3% from 771 m to 775 m0.0% from 775 m to 780 m0.0% from 780 m to 784 m0.0% from 784 m to 788 m1.8% from 788 m to 793 m0.0% from 793 m to 797 m0.0% from 797 m to 800 m0.0% from 800 m to 804 m-2.7% from 804 m to 808 m0.0% from 808 m to 811 m0.0% from 811 m to 815 m-2.6% from 815 m to 819 m-2.5% from 819 m to 823 m0.0% from 823 m to 827 m-2.4% from 827 m to 831 m0.0% from 831 m to 835 m-2.9% from 835 m to 838 m-2.9% from 838 m to 842 m0.0% from 842 m to 847 m0.0% from 847 m to 851 m3.1% from 851 m to 854 m3.2% from 854 m to 860 m2.9% from 860 m to 864 m2.9% from 864 m to 867 m3.3% from 867 m to 870 m1.9% from 870 m to 875 m2.9% from 875 m to 879 m0.0% from 879 m to 883 m2.9% from 883 m to 886 m3.0% from 886 m to 889 m0.0% from 889 m to 893 m0.0% from 893 m to 896 m2.6% from 896 m to 900 m0.0% from 900 m to 904 m3.0% from 904 m to 907 m1.6% from 907 m to 913 m3.0% from 913 m to 916 m0.0% from 916 m to 920 m2.5% from 920 m to 924 m2.7% from 924 m to 928 m3.0% from 928 m to 931 m1.0% from 931 m to 941 m2.1% from 941 m to 946 m0.0% from 946 m to 950 m3.1% from 950 m to 953 m0.0% from 953 m to 957 m1.8% from 957 m to 962 m1.8% from 962 m to 968 m0.0% from 968 m to 971 m2.0% from 971 m to 976 m1.6% from 976 m to 982 m2.6% from 982 m to 986 m5.6% from 986 m to 990 m3.1% from 990 m to 993 m2.9% from 993 m to 996 m5.6% from 996 m to 1000 m3.3% from 1000 m to 1.0 km3.1% from 1.0 km to 1.0 km3.0% from 1.0 km to 1.0 km3.0% from 1.0 km to 1.0 km3.3% from 1.0 km to 1.0 km2.7% from 1.0 km to 1.0 km2.6% from 1.0 km to 1.0 km2.7% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.5% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km2.4% from 1.0 km to 1.0 km2.5% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.1 km3.1% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km3%5%2%1%3%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.06 km / 0.66 miles
Elevation gain29.2 m / 96 ft
Average gradient2.8%
Maximum gradient8.2%
Elevation high73.8 m / 242 ft
Elevation low44.6 m / 146 ft
Climb difficulty score2,923.53

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Armsheugh wood full climb
Hurlford, East Ayrshire
1.2 km3.5%42 m
short and steep
Hurlford, East Ayrshire
0.59 km5.1%30 m
Hurlford X to Loch Lomond
Hurlford, East Ayrshire
0.64 km2.1%13 m
irvine river path
Hurlford, East Ayrshire
1.31 km0.9%11 m
Milton Road to Moscow
Hurlford, East Ayrshire
2.58 km1.9%54 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,556,057th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 156,820th most difficult cycling climb of all 332,744 climbs in United Kingdom.

📉

Places 16,413th out of 31,752 cycling climbs in Scotland.

Ranks 331st out of 600 cycling climbs in East Ayrshire.

🏵️

A local climb of note, this is the 6th most difficult cycling climb (out of 13 climbs) in Hurlford.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb