Climb from Imber

📍
Heytesbury, Imber, Wiltshire, England, BA12 0JA, United Kingdom
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Climb from Imber...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Climb from Imber.

125 m145 m165 m185 m3.3% from 0 m to 6 m8.2% from 6 m to 11 m4.8% from 11 m to 15 m3.4% from 15 m to 21 m6.8% from 21 m to 27 m3.9% from 27 m to 32 m3.3% from 32 m to 38 m6.2% from 38 m to 45 m4.3% from 45 m to 49 m7.1% from 49 m to 55 m3.0% from 55 m to 61 m8.5% from 61 m to 66 m4.8% from 66 m to 70 m9.3% from 70 m to 75 m3.7% from 75 m to 80 m7.8% from 80 m to 85 m4.5% from 85 m to 90 m11.4% from 90 m to 93 m5.1% from 93 m to 97 m3.5% from 97 m to 103 m8.2% from 103 m to 108 m3.4% from 108 m to 113 m4.2% from 113 m to 118 m3.4% from 118 m to 124 m7.8% from 124 m to 129 m3.5% from 129 m to 135 m3.6% from 135 m to 140 m3.9% from 140 m to 146 m4.5% from 146 m to 150 m3.3% from 150 m to 156 m4.3% from 156 m to 161 m6.6% from 161 m to 167 m4.4% from 167 m to 171 m3.3% from 171 m to 177 m3.8% from 177 m to 183 m3.4% from 183 m to 188 m4.0% from 188 m to 193 m3.5% from 193 m to 199 m3.7% from 199 m to 205 m3.6% from 205 m to 210 m3.3% from 210 m to 216 m4.2% from 216 m to 221 m3.4% from 221 m to 227 m4.3% from 227 m to 232 m6.9% from 232 m to 237 m4.2% from 237 m to 242 m3.4% from 242 m to 248 m8.5% from 248 m to 253 m3.6% from 253 m to 258 m6.7% from 258 m to 264 m3.8% from 264 m to 270 m3.8% from 270 m to 275 m8.9% from 275 m to 279 m7.1% from 279 m to 285 m4.0% from 285 m to 290 m7.0% from 290 m to 296 m3.1% from 296 m to 302 m8.2% from 302 m to 307 m7.0% from 307 m to 313 m3.2% from 313 m to 319 m8.0% from 319 m to 324 m7.0% from 324 m to 329 m8.2% from 329 m to 334 m7.0% from 334 m to 340 m8.2% from 340 m to 345 m6.7% from 345 m to 351 m4.3% from 351 m to 356 m6.9% from 356 m to 361 m8.3% from 361 m to 366 m9.5% from 366 m to 370 m8.0% from 370 m to 375 m8.7% from 375 m to 380 m9.5% from 380 m to 384 m12.1% from 384 m to 388 m8.2% from 388 m to 392 m8.7% from 392 m to 397 m9.3% from 397 m to 401 m9.5% from 401 m to 406 m9.3% from 406 m to 410 m10.0% from 410 m to 414 m9.1% from 414 m to 418 m4.7% from 418 m to 423 m9.3% from 423 m to 427 m13.3% from 427 m to 430 m11.4% from 430 m to 433 m4.9% from 433 m to 437 m4.7% from 437 m to 442 m9.5% from 442 m to 446 m8.0% from 446 m to 451 m4.3% from 451 m to 456 m9.3% from 456 m to 460 m9.5% from 460 m to 464 m4.7% from 464 m to 468 m9.5% from 468 m to 473 m9.3% from 473 m to 477 m7.8% from 477 m to 482 m5.6% from 482 m to 486 m10.0% from 486 m to 490 m9.5% from 490 m to 494 m4.7% from 494 m to 498 m9.5% from 498 m to 502 m4.7% from 502 m to 507 m6.8% from 507 m to 512 m8.7% from 512 m to 517 m4.7% from 517 m to 521 m6.1% from 521 m to 525 m7.8% from 525 m to 530 m3.9% from 530 m to 535 m4.3% from 535 m to 539 m4.7% from 539 m to 544 m4.8% from 544 m to 548 m7.0% from 548 m to 554 m4.3% from 554 m to 558 m4.7% from 558 m to 563 m0.0% from 563 m to 569 m4.1% from 569 m to 573 m4.8% from 573 m to 578 m3.6% from 578 m to 583 m4.0% from 583 m to 588 m3.4% from 588 m to 594 m4.3% from 594 m to 599 m4.5% from 599 m to 603 m3.4% from 603 m to 609 m0.0% from 609 m to 614 m3.4% from 614 m to 620 m3.7% from 620 m to 625 m4.3% from 625 m to 630 m3.6% from 630 m to 635 m0.0% from 635 m to 640 m3.6% from 640 m to 646 m3.6% from 646 m to 651 m3.7% from 651 m to 657 m3.3% from 657 m to 663 m4.1% from 663 m to 668 m3.4% from 668 m to 674 m4.2% from 674 m to 678 m3.4% from 678 m to 684 m8.3% from 684 m to 689 m3.4% from 689 m to 695 m4.3% from 695 m to 700 m3.7% from 700 m to 705 m7.8% from 705 m to 710 m3.4% from 710 m to 716 m7.3% from 716 m to 721 m4.3% from 721 m to 726 m3.6% from 726 m to 732 m8.0% from 732 m to 737 m3.6% from 737 m to 742 m8.0% from 742 m to 747 m9.3% from 747 m to 752 m3.6% from 752 m to 757 m4.1% from 757 m to 762 m7.8% from 762 m to 767 m5.4% from 767 m to 771 m7.3% from 771 m to 776 m4.1% from 776 m to 781 m4.8% from 781 m to 785 m4.7% from 785 m to 790 m9.5% from 790 m to 794 m3.4% from 794 m to 800 m4.3% from 800 m to 804 m4.0% from 804 m to 809 m4.3% from 809 m to 814 m4.8% from 814 m to 818 m3.6% from 818 m to 824 m3.9% from 824 m to 829 m3.6% from 829 m to 835 m4.0% from 835 m to 840 m3.5% from 840 m to 845 m0.0% from 845 m to 850 m3.5% from 850 m to 856 m4.1% from 856 m to 861 m3.4% from 861 m to 867 m4.2% from 867 m to 871 m3.8% from 871 m to 877 m0.0% from 877 m to 882 m3.2% from 882 m to 888 m4.3% from 888 m to 893 m3.3% from 893 m to 899 m3.2% from 899 m to 905 m0.0% from 905 m to 910 m3.4% from 910 m to 916 m3.1% from 916 m to 922 m3.2% from 922 m to 929 m0.0% from 929 m to 934 m3.6% from 934 m to 939 m3.1% from 939 m to 946 m3.4% from 946 m to 952 m3.0% from 952 m to 958 m3.1% from 958 m to 965 m3.1% from 965 m to 971 m0.0% from 971 m to 978 m4.2% from 978 m to 983 m3.5% from 983 m to 988 m3.1% from 988 m to 995 m3.1% from 995 m to 1.0 km0.0% from 1.0 km to 1.0 km3.4% from 1.0 km to 1.0 km2.8% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km3.0% from 1.0 km to 1.0 km3.7% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km3.1% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km3.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km4.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km11.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km33.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-4.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-4.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-4.2% from 1.1 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-3.0% from 1.2 km to 1.2 km5%7%5%4%1%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.18 km / 0.73 miles
Elevation gain51.6 m / 169 ft
Average gradient4.4%
Maximum gradient8.4%
Elevation high180.4 m / 592 ft
Elevation low128 m / 420 ft
Climb difficulty score5,154.83

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Imber Rd Climb
Imber, Wiltshire
1.74 km5.2%90 m
Imber to the top
Imber, Wiltshire
2.14 km2.7%57 m
Imber to top of Slack Hill
Imber, Wiltshire
4.15 km1.9%78 m
Imber to STL
Imber, Wiltshire
4.79 km0.5%22 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,074,942nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 97,624th most difficult cycling climb of all 332,744 climbs in United Kingdom.

📉

Places 72,296th out of 268,497 cycling climbs in England.

Ranks 1,399th out of 5,656 cycling climbs in Wiltshire.

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 5 climbs) in Imber.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb