Box Hill to Love Lane

📍
Box Hill, Box, Wiltshire, England, SN13 8EZ, United Kingdom

Estimated Climb Time

Loading your rider settings for Box Hill to Love Lane...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Box Hill to Love Lane.

40 m75 m115 m150 m7.3% from 0 m to 6 m7.4% from 6 m to 11 m7.8% from 11 m to 16 m28.6% from 16 m to 20 m38.9% from 20 m to 24 m21.4% from 24 m to 27 m44.4% from 27 m to 29 m0.0% from 29 m to 32 m6.9% from 32 m to 35 m15.4% from 35 m to 37 m14.3% from 37 m to 40 m15.4% from 40 m to 43 m21.4% from 43 m to 46 m15.4% from 46 m to 48 m35.7% from 48 m to 51 m7.1% from 51 m to 54 m14.3% from 54 m to 57 m24.0% from 57 m to 59 m14.8% from 59 m to 62 m23.1% from 62 m to 64 m8.7% from 64 m to 67 m17.4% from 67 m to 69 m16.0% from 69 m to 72 m8.3% from 72 m to 74 m40.0% from 74 m to 76 m16.0% from 76 m to 79 m15.4% from 79 m to 82 m7.7% from 82 m to 84 m15.4% from 84 m to 87 m40.0% from 87 m to 89 m7.7% from 89 m to 92 m14.8% from 92 m to 95 m16.7% from 95 m to 97 m26.1% from 97 m to 99 m14.8% from 99 m to 102 m16.0% from 102 m to 104 m7.7% from 104 m to 107 m16.0% from 107 m to 110 m24.0% from 110 m to 112 m7.7% from 112 m to 115 m21.4% from 115 m to 117 m15.4% from 117 m to 120 m16.7% from 120 m to 122 m30.8% from 122 m to 125 m16.0% from 125 m to 128 m29.6% from 128 m to 130 m-8.0% from 130 m to 133 m23.1% from 133 m to 135 m0.0% from 135 m to 138 m15.4% from 138 m to 140 m24.0% from 140 m to 143 m7.7% from 143 m to 146 m20.0% from 146 m to 149 m-7.1% from 149 m to 151 m20.7% from 151 m to 154 m7.1% from 154 m to 157 m13.3% from 157 m to 160 m13.3% from 160 m to 163 m0.0% from 163 m to 166 m20.0% from 166 m to 169 m13.3% from 169 m to 172 m0.0% from 172 m to 175 m6.9% from 175 m to 178 m13.3% from 178 m to 181 m13.3% from 181 m to 184 m13.3% from 184 m to 187 m7.1% from 187 m to 190 m21.4% from 190 m to 193 m14.3% from 193 m to 195 m14.3% from 195 m to 198 m0.0% from 198 m to 201 m21.4% from 201 m to 204 m20.7% from 204 m to 207 m0.0% from 207 m to 210 m27.6% from 210 m to 212 m6.9% from 212 m to 215 m27.6% from 215 m to 218 m13.8% from 218 m to 221 m6.7% from 221 m to 224 m-6.5% from 224 m to 227 m6.2% from 227 m to 230 m5.9% from 230 m to 234 m0.0% from 234 m to 237 m5.9% from 237 m to 241 m0.0% from 241 m to 244 m11.4% from 244 m to 248 m0.0% from 248 m to 251 m5.9% from 251 m to 254 m6.1% from 254 m to 258 m5.9% from 258 m to 261 m0.0% from 261 m to 264 m6.1% from 264 m to 268 m6.1% from 268 m to 271 m12.9% from 271 m to 274 m6.3% from 274 m to 277 m20.0% from 277 m to 280 m-6.7% from 280 m to 283 m33.3% from 283 m to 286 m-6.7% from 286 m to 289 m27.6% from 289 m to 292 m6.9% from 292 m to 295 m14.3% from 295 m to 298 m16.0% from 298 m to 300 m14.3% from 300 m to 303 m30.8% from 303 m to 306 m14.8% from 306 m to 308 m14.8% from 308 m to 311 m16.0% from 311 m to 314 m15.4% from 314 m to 316 m7.7% from 316 m to 319 m32.0% from 319 m to 321 m16.7% from 321 m to 324 m8.3% from 324 m to 326 m8.3% from 326 m to 329 m16.0% from 329 m to 331 m8.3% from 331 m to 333 m15.4% from 333 m to 336 m8.7% from 336 m to 338 m24.0% from 338 m to 341 m8.3% from 341 m to 343 m32.0% from 343 m to 346 m-8.3% from 346 m to 348 m16.0% from 348 m to 351 m16.0% from 351 m to 353 m15.4% from 353 m to 356 m8.0% from 356 m to 358 m23.1% from 358 m to 361 m0.0% from 361 m to 363 m7.7% from 363 m to 366 m22.2% from 366 m to 369 m23.1% from 369 m to 371 m0.0% from 371 m to 374 m15.4% from 374 m to 377 m14.8% from 377 m to 379 m21.4% from 379 m to 382 m6.2% from 382 m to 385 m6.5% from 385 m to 388 m18.2% from 388 m to 392 m5.9% from 392 m to 395 m11.8% from 395 m to 399 m5.7% from 399 m to 402 m5.7% from 402 m to 406 m11.8% from 406 m to 409 m5.6% from 409 m to 413 m0.0% from 413 m to 416 m0.0% from 416 m to 420 m5.7% from 420 m to 423 m11.1% from 423 m to 427 m11.8% from 427 m to 430 m5.7% from 430 m to 434 m6.1% from 434 m to 437 m6.1% from 437 m to 440 m25.0% from 440 m to 443 m0.0% from 443 m to 447 m18.2% from 447 m to 450 m6.5% from 450 m to 453 m12.9% from 453 m to 456 m6.3% from 456 m to 459 m12.9% from 459 m to 462 m6.5% from 462 m to 465 m27.6% from 465 m to 468 m0.0% from 468 m to 471 m15.4% from 471 m to 474 m38.5% from 474 m to 476 m24.0% from 476 m to 479 m8.7% from 479 m to 481 m16.7% from 481 m to 484 m9.1% from 484 m to 486 m17.4% from 486 m to 488 m9.5% from 488 m to 490 m20.0% from 490 m to 492 m9.5% from 492 m to 494 m19.0% from 494 m to 496 m8.7% from 496 m to 499 m28.6% from 499 m to 501 m18.2% from 501 m to 503 m20.0% from 503 m to 505 m9.5% from 505 m to 507 m19.0% from 507 m to 509 m18.2% from 509 m to 511 m34.8% from 511 m to 514 m0.0% from 514 m to 516 m27.3% from 516 m to 518 m16.0% from 518 m to 521 m40.0% from 521 m to 523 m0.0% from 523 m to 526 m16.7% from 526 m to 528 m34.8% from 528 m to 530 m9.1% from 530 m to 533 m47.1% from 533 m to 534 m11.1% from 534 m to 536 m-28.6% from 536 m to 537 m13.3% from 537 m to 539 m-14.3% from 539 m to 540 m0.0% from 540 m to 542 m13.3% from 542 m to 543 m14.3% from 543 m to 545 m0.0% from 545 m to 546 m-100.0% from 546 m to 546 m28.6% from 546 m to 546 m100.0% from 546 m to 547 m-66.7% from 547 m to 547 m-10.0% from 547 m to 549 m-8.3% from 549 m to 551 m-7.4% from 551 m to 554 m0.0% from 554 m to 557 m0.0% from 557 m to 561 m0.0% from 561 m to 565 m10.0% from 565 m to 569 m15.4% from 569 m to 572 m0.0% from 572 m to 576 m10.0% from 576 m to 580 m15.4% from 580 m to 584 m25.6% from 584 m to 588 m10.0% from 588 m to 592 m15.4% from 592 m to 596 m5.3% from 596 m to 600 m15.4% from 600 m to 604 m10.3% from 604 m to 608 m5.1% from 608 m to 612 m5.7% from 612 m to 615 m12.5% from 615 m to 618 m12.5% from 618 m to 621 m6.7% from 621 m to 624 m-5.6% from 624 m to 628 m-9.8% from 628 m to 632 m-8.5% from 632 m to 637 m-8.5% from 637 m to 642 m4.1% from 642 m to 646 m8.9% from 646 m to 651 m9.5% from 651 m to 655 m20.5% from 655 m to 659 m21.6% from 659 m to 663 m16.7% from 663 m to 666 m5.7% from 666 m to 670 m22.9% from 670 m to 673 m11.8% from 673 m to 677 m20.7% from 677 m to 680 m12.9% from 680 m to 683 m20.7% from 683 m to 686 m0.0% from 686 m to 689 m20.0% from 689 m to 692 m13.8% from 692 m to 695 m20.0% from 695 m to 698 m0.0% from 698 m to 700 m37.0% from 700 m to 703 m16.0% from 703 m to 706 m29.6% from 706 m to 708 m23.1% from 708 m to 711 m17.4% from 711 m to 713 m34.8% from 713 m to 715 m-8.3% from 715 m to 718 m16.0% from 718 m to 720 m21.4% from 720 m to 723 m21.4% from 723 m to 726 m22.2% from 726 m to 729 m14.3% from 729 m to 731 m14.3% from 731 m to 734 m6.7% from 734 m to 737 m21.4% from 737 m to 740 m6.5% from 740 m to 743 m12.1% from 743 m to 746 m0.0% from 746 m to 750 m27.6% from 750 m to 753 m0.0% from 753 m to 755 m8.7% from 755 m to 757 m8.3% from 757 m to 760 m0.0% from 760 m to 763 m6.3% from 763 m to 766 m-5.7% from 766 m to 769 m16.7% from 769 m to 773 m-10.8% from 773 m to 777 m16.2% from 777 m to 780 m-5.4% from 780 m to 784 m0.0% from 784 m to 788 m0.0% from 788 m to 791 m11.4% from 791 m to 795 m16.7% from 795 m to 798 m5.9% from 798 m to 802 m11.4% from 802 m to 805 m17.6% from 805 m to 809 m11.8% from 809 m to 812 m11.4% from 812 m to 815 m5.9% from 815 m to 819 m6.2% from 819 m to 822 m18.2% from 822 m to 825 m5.9% from 825 m to 829 m12.5% from 829 m to 832 m25.0% from 832 m to 835 m6.2% from 835 m to 838 m19.4% from 838 m to 841 m6.5% from 841 m to 845 m27.6% from 845 m to 847 m20.7% from 847 m to 850 m13.8% from 850 m to 853 m0.0% from 853 m to 856 m19.4% from 856 m to 859 m6.2% from 859 m to 862 m18.2% from 862 m to 866 m0.0% from 866 m to 869 m12.1% from 869 m to 872 m0.0% from 872 m to 875 m12.5% from 875 m to 879 m12.5% from 879 m to 882 m6.5% from 882 m to 885 m0.0% from 885 m to 888 m6.1% from 888 m to 891 m0.0% from 891 m to 895 m5.7% from 895 m to 898 m0.0% from 898 m to 902 m5.7% from 902 m to 905 m14%12%11%9%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance0.91 km / 0.56 miles
Elevation gain108.4 m / 356 ft
Average gradient11.7%
Maximum gradient33.1%
Elevation high147.4 m / 484 ft
Elevation low41.8 m / 137 ft
Climb difficulty score10,593.18

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Quarry Hill Short
Box, Wiltshire
0.64 km11.1%71 m
Quarry Hill
Box, Wiltshire
1.1 km7.3%82 m
Climb to Box Hill (A4)
Box, Wiltshire
0.58 km11.1%64 m
Move on Up
Box, Wiltshire
0.5 km13.2%66 m
Roadhill top (100m elevation change)
Box, Wiltshire
1.43 km7%100 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 531,510th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 38,620th most difficult cycling climb of all 332,744 climbs in United Kingdom.

📉

Places 27,077th out of 268,497 cycling climbs in England.

Ranks 245th out of 5,656 cycling climbs in Wiltshire.

🏵️

A local climb of note, this is the 7th most difficult cycling climb (out of 54 climbs) in Box.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb