Chalbury up and over

📍
Chalbury, Hinton Martell, Dorset, England, BH21 7EY, United Kingdom
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Chalbury up and over...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Chalbury up and over.

45 m60 m80 m95 m1.4% from 0 m to 7 m0.0% from 7 m to 14 m0.0% from 14 m to 21 m0.0% from 21 m to 29 m0.0% from 29 m to 36 m1.4% from 36 m to 43 m0.0% from 43 m to 50 m0.0% from 50 m to 57 m0.0% from 57 m to 64 m0.0% from 64 m to 72 m0.0% from 72 m to 80 m0.0% from 80 m to 87 m0.0% from 87 m to 95 m0.0% from 95 m to 101 m0.0% from 101 m to 108 m0.0% from 108 m to 114 m0.0% from 114 m to 120 m0.0% from 120 m to 126 m1.8% from 126 m to 131 m0.0% from 131 m to 137 m0.0% from 137 m to 141 m0.0% from 141 m to 146 m0.0% from 146 m to 149 m1.6% from 149 m to 156 m0.0% from 156 m to 162 m0.0% from 162 m to 168 m1.5% from 168 m to 175 m1.5% from 175 m to 181 m1.1% from 181 m to 190 m2.4% from 190 m to 198 m1.4% from 198 m to 205 m2.9% from 205 m to 212 m2.3% from 212 m to 216 m2.1% from 216 m to 221 m2.3% from 221 m to 225 m3.4% from 225 m to 231 m3.2% from 231 m to 237 m2.0% from 237 m to 247 m3.4% from 247 m to 256 m1.3% from 256 m to 264 m4.3% from 264 m to 269 m2.3% from 269 m to 273 m1.9% from 273 m to 278 m2.2% from 278 m to 283 m3.9% from 283 m to 288 m2.6% from 288 m to 292 m2.7% from 292 m to 295 m2.7% from 295 m to 303 m3.3% from 303 m to 309 m9.4% from 309 m to 314 m7.0% from 314 m to 320 m5.9% from 320 m to 325 m5.4% from 325 m to 330 m9.6% from 330 m to 336 m8.2% from 336 m to 341 m8.8% from 341 m to 346 m5.8% from 346 m to 351 m6.2% from 351 m to 355 m5.1% from 355 m to 359 m5.4% from 359 m to 362 m4.8% from 362 m to 366 m2.9% from 366 m to 370 m5.1% from 370 m to 374 m5.1% from 374 m to 378 m2.6% from 378 m to 382 m2.6% from 382 m to 385 m5.1% from 385 m to 389 m1.8% from 389 m to 395 m3.4% from 395 m to 401 m1.5% from 401 m to 407 m3.1% from 407 m to 414 m1.6% from 414 m to 420 m1.8% from 420 m to 426 m1.7% from 426 m to 432 m1.4% from 432 m to 438 m0.0% from 438 m to 445 m0.0% from 445 m to 452 m1.4% from 452 m to 459 m1.4% from 459 m to 467 m1.3% from 467 m to 474 m1.3% from 474 m to 482 m1.4% from 482 m to 489 m1.4% from 489 m to 496 m1.7% from 496 m to 502 m1.4% from 502 m to 509 m0.0% from 509 m to 515 m1.9% from 515 m to 521 m1.6% from 521 m to 527 m1.5% from 527 m to 534 m0.0% from 534 m to 541 m1.4% from 541 m to 548 m1.6% from 548 m to 554 m1.4% from 554 m to 562 m2.4% from 562 m to 570 m1.6% from 570 m to 582 m4.6% from 582 m to 593 m9.4% from 593 m to 604 m11.8% from 604 m to 610 m10.9% from 610 m to 617 m9.2% from 617 m to 623 m8.8% from 623 m to 629 m13.9% from 629 m to 633 m9.4% from 633 m to 636 m12.9% from 636 m to 639 m11.7% from 639 m to 645 m13.5% from 645 m to 649 m11.4% from 649 m to 652 m11.4% from 652 m to 656 m11.8% from 656 m to 659 m12.5% from 659 m to 663 m12.8% from 663 m to 667 m13.9% from 667 m to 671 m9.1% from 671 m to 674 m8.3% from 674 m to 677 m9.1% from 677 m to 681 m10.3% from 681 m to 685 m9.4% from 685 m to 688 m13.0% from 688 m to 692 m13.9% from 692 m to 696 m12.1% from 696 m to 699 m8.6% from 699 m to 703 m10.3% from 703 m to 707 m13.5% from 707 m to 710 m14.3% from 710 m to 715 m15.6% from 715 m to 719 m16.4% from 719 m to 725 m13.9% from 725 m to 729 m14.6% from 729 m to 733 m14.0% from 733 m to 738 m17.0% from 738 m to 743 m16.1% from 743 m to 746 m15.4% from 746 m to 750 m22.2% from 750 m to 754 m13.2% from 754 m to 774 m12.3% from 774 m to 781 m8.6% from 781 m to 784 m8.6% from 784 m to 788 m7.8% from 788 m to 793 m11.8% from 793 m to 798 m10.8% from 798 m to 805 m10.0% from 805 m to 810 m7.5% from 810 m to 817 m7.1% from 817 m to 821 m9.8% from 821 m to 825 m10.3% from 825 m to 829 m10.0% from 829 m to 834 m11.4% from 834 m to 838 m12.7% from 838 m to 845 m8.1% from 845 m to 849 m8.8% from 849 m to 854 m12.1% from 854 m to 860 m10.0% from 860 m to 865 m11.5% from 865 m to 870 m7.9% from 870 m to 874 m4.4% from 874 m to 879 m5.8% from 879 m to 884 m5.0% from 884 m to 890 m2.6% from 890 m to 897 m2.8% from 897 m to 905 m1.4% from 905 m to 912 m0.0% from 912 m to 922 m0.0% from 922 m to 931 m-1.1% from 931 m to 940 m0.0% from 940 m to 950 m-1.0% from 950 m to 959 m-2.0% from 959 m to 969 m-0.8% from 969 m to 983 m-1.6% from 983 m to 995 m-1.9% from 995 m to 1.0 km-1.9% from 1.0 km to 1.0 km-5.3% from 1.0 km to 1.0 km-9.3% from 1.0 km to 1.0 km-10.3% from 1.0 km to 1.0 km-5.9% from 1.0 km to 1.1 km-5.5% from 1.1 km to 1.1 km-5.9% from 1.1 km to 1.1 km-6.4% from 1.1 km to 1.1 km-1.6% from 1.1 km to 1.1 km0.8% from 1.1 km to 1.1 km0.8% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.0% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.2 km2.1% from 1.2 km to 1.2 km1.1% from 1.2 km to 1.2 km1.3% from 1.2 km to 1.2 km1.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-1.1% from 1.2 km to 1.2 km-1.1% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km10.4% from 1.2 km to 1.3 km1.7% from 1.3 km to 1.3 km0.8% from 1.3 km to 1.3 km-1.3% from 1.3 km to 1.3 km-2.9% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km-6.7% from 1.3 km to 1.3 km-10.6% from 1.3 km to 1.4 km-6.5% from 1.4 km to 1.4 km-7.5% from 1.4 km to 1.4 km-7.5% from 1.4 km to 1.4 km-5.3% from 1.4 km to 1.4 km-5.3% from 1.4 km to 1.4 km-4.7% from 1.4 km to 1.4 km-4.5% from 1.4 km to 1.4 km-3.8% from 1.4 km to 1.5 km-3.1% from 1.5 km to 1.5 km-4.8% from 1.5 km to 1.5 km-3.2% from 1.5 km to 1.5 km-1.7% from 1.5 km to 1.5 km-2.6% from 1.5 km to 1.5 km-2.3% from 1.5 km to 1.5 km-2.4% from 1.5 km to 1.5 km-2.3% from 1.5 km to 1.6 km-2.3% from 1.6 km to 1.6 km-3.2% from 1.6 km to 1.6 km-4.2% from 1.6 km to 1.6 km-4.1% from 1.6 km to 1.6 km-3.9% from 1.6 km to 1.6 km-3.4% from 1.6 km to 1.6 km-3.3% from 1.6 km to 1.6 km-3.0% from 1.6 km to 1.7 km-3.8% from 1.7 km to 1.7 km-2.5% from 1.7 km to 1.7 km-4.2% from 1.7 km to 1.7 km-5.1% from 1.7 km to 1.7 km-6.1% from 1.7 km to 1.7 km-6.3% from 1.7 km to 1.7 km-5.0% from 1.7 km to 1.7 km-4.4% from 1.7 km to 1.8 km-4.0% from 1.8 km to 1.8 km-2.4% from 1.8 km to 1.8 km-3.2% from 1.8 km to 1.8 km-2.5% from 1.8 km to 1.8 km1%3%8%6%-2%-4%-4%0 m250 m500 m750 m1 km1.3 km1.5 km1.8 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.8 km / 1.12 miles
Elevation gain20.5 m / 67 ft
Average gradient1.1%
Maximum gradient17.6%
Elevation high93.9 m / 308 ft
Elevation low48 m / 157 ft
Climb difficulty score2,056.67

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Through Hinton Martell
Hinton Martell, Dorset
2.15 km0.6%13 m
Upp in t'on over
Hinton Martell, Dorset
1.07 km0.7%8 m
Hinton Martell rush.
Hinton Martell, Dorset
1.09 km2.8%34 m
The B-B-Bumps
Hinton Martell, Dorset
0.68 km1.8%12 m
Speedbumps
Hinton Martell, Dorset
0.6 km1.8%11 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,856,307th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 197,974th most difficult cycling climb of all 332,744 climbs in United Kingdom.

📉

Places 153,771st out of 268,497 cycling climbs in England.

Ranks 2,801st out of 4,290 cycling climbs in Dorset.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 11 climbs) in Hinton Martell.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb