Berglistrasse full (upper part is gravel)

📍
Schulhaus Allmendli, 68a, Schulhausstrasse, Erlenbach (ZH), Bezirk Meilen, Zurich, 8703, Switzerland

Estimated Climb Time

Loading your rider settings for Berglistrasse full (upper part is gravel)...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Berglistrasse full (upper part is gravel).

455 m490 m520 m555 m4.5% from 0 m to 11 m8.4% from 11 m to 49 m3.4% from 49 m to 55 m9.1% from 55 m to 58 m9.7% from 58 m to 61 m11.4% from 61 m to 65 m9.5% from 65 m to 69 m10.3% from 69 m to 73 m9.5% from 73 m to 77 m10.2% from 77 m to 82 m8.5% from 82 m to 87 m10.0% from 87 m to 91 m7.1% from 91 m to 95 m3.1% from 95 m to 98 m-1.7% from 98 m to 104 m0.0% from 104 m to 107 m-1.7% from 107 m to 154 m8.3% from 154 m to 159 m7.7% from 159 m to 164 m6.3% from 164 m to 169 m8.8% from 169 m to 175 m8.8% from 175 m to 178 m9.4% from 178 m to 181 m13.0% from 181 m to 187 m14.8% from 187 m to 192 m19.4% from 192 m to 196 m16.7% from 196 m to 200 m12.8% from 200 m to 204 m9.5% from 204 m to 209 m12.8% from 209 m to 213 m11.1% from 213 m to 216 m10.5% from 216 m to 220 m11.4% from 220 m to 224 m10.8% from 224 m to 228 m8.8% from 228 m to 231 m4.7% from 231 m to 236 m12.5% from 236 m to 240 m17.4% from 240 m to 244 m20.0% from 244 m to 249 m20.5% from 249 m to 253 m16.2% from 253 m to 257 m18.8% from 257 m to 262 m19.0% from 262 m to 266 m22.6% from 266 m to 271 m19.0% from 271 m to 275 m22.5% from 275 m to 279 m19.4% from 279 m to 283 m24.4% from 283 m to 287 m27.0% from 287 m to 290 m22.9% from 290 m to 294 m27.5% from 294 m to 298 m29.0% from 298 m to 301 m26.7% from 301 m to 305 m27.5% from 305 m to 309 m22.7% from 309 m to 314 m22.0% from 314 m to 319 m24.1% from 319 m to 325 m23.3% from 325 m to 329 m22.6% from 329 m to 332 m24.4% from 332 m to 336 m23.3% from 336 m to 340 m24.3% from 340 m to 344 m22.9% from 344 m to 348 m21.9% from 348 m to 351 m23.7% from 351 m to 355 m25.6% from 355 m to 359 m22.2% from 359 m to 362 m23.7% from 362 m to 366 m23.7% from 366 m to 370 m22.9% from 370 m to 373 m22.2% from 373 m to 378 m22.4% from 378 m to 383 m20.6% from 383 m to 386 m21.3% from 386 m to 391 m18.2% from 391 m to 394 m19.2% from 394 m to 399 m20.4% from 399 m to 405 m20.9% from 405 m to 409 m19.5% from 409 m to 413 m22.6% from 413 m to 416 m20.6% from 416 m to 420 m21.3% from 420 m to 424 m20.0% from 424 m to 427 m22.6% from 427 m to 433 m20.0% from 433 m to 437 m9.7% from 437 m to 440 m6.5% from 440 m to 443 m9.8% from 443 m to 447 m14.0% from 447 m to 452 m12.5% from 452 m to 456 m11.1% from 456 m to 459 m12.8% from 459 m to 464 m9.7% from 464 m to 467 m12.9% from 467 m to 470 m14.0% from 470 m to 474 m10.5% from 474 m to 478 m11.8% from 478 m to 483 m10.5% from 483 m to 489 m11.4% from 489 m to 493 m11.6% from 493 m to 498 m13.0% from 498 m to 502 m11.8% from 502 m to 507 m6.8% from 507 m to 512 m4.3% from 512 m to 516 m3.8% from 516 m to 522 m4.0% from 522 m to 527 m2.4% from 527 m to 531 m6.5% from 531 m to 534 m2.5% from 534 m to 538 m2.9% from 538 m to 541 m4.8% from 541 m to 547 m3.6% from 547 m to 553 m3.4% from 553 m to 559 m3.2% from 559 m to 562 m3.0% from 562 m to 565 m3.1% from 565 m to 568 m4.7% from 568 m to 573 m4.9% from 573 m to 577 m3.2% from 577 m to 580 m5.6% from 580 m to 584 m5.4% from 584 m to 587 m5.3% from 587 m to 591 m6.3% from 591 m to 596 m6.4% from 596 m to 601 m2.6% from 601 m to 604 m6.7% from 604 m to 609 m5.6% from 609 m to 613 m4.7% from 613 m to 617 m5.7% from 617 m to 620 m8.3% from 620 m to 624 m8.3% from 624 m to 629 m8.5% from 629 m to 635 m10.7% from 635 m to 640 m9.7% from 640 m to 643 m8.1% from 643 m to 647 m10.5% from 647 m to 651 m10.0% from 651 m to 655 m10.0% from 655 m to 660 m10.0% from 660 m to 665 m10.0% from 665 m to 669 m11.8% from 669 m to 674 m7.8% from 674 m to 679 m9.4% from 679 m to 684 m9.8% from 684 m to 689 m9.5% from 689 m to 696 m13.5% from 696 m to 701 m4.8% from 701 m to 705 m0.0% from 705 m to 713 m-2.6% from 713 m to 716 m-2.5% from 716 m to 720 m0.0% from 720 m to 724 m0.0% from 724 m to 728 m2.2% from 728 m to 733 m2.2% from 733 m to 737 m2.9% from 737 m to 741 m0.0% from 741 m to 744 m0.0% from 744 m to 748 m-3.3% from 748 m to 751 m0.0% from 751 m to 756 m-2.4% from 756 m to 761 m-2.9% from 761 m to 764 m-5.4% from 764 m to 768 m-2.9% from 768 m to 771 m-2.7% from 771 m to 775 m0.0% from 775 m to 778 m0.0% from 778 m to 782 m-2.7% from 782 m to 786 m2.6% from 786 m to 789 m0.0% from 789 m to 794 m0.0% from 794 m to 798 m0.0% from 798 m to 803 m2.0% from 803 m to 808 m0.0% from 808 m to 812 m1.8% from 812 m to 818 m1.7% from 818 m to 824 m1.9% from 824 m to 829 m2.0% from 829 m to 834 m1.8% from 834 m to 840 m5.4% from 840 m to 845 m5.9% from 845 m to 851 m7.5% from 851 m to 856 m5.8% from 856 m to 861 m7.4% from 861 m to 866 m8.2% from 866 m to 873 m7.0% from 873 m to 878 m9.4% from 878 m to 894 m8.2% from 894 m to 899 m8.9% from 899 m to 905 m7.1% from 905 m to 913 m2.5% from 913 m to 921 m2.9% from 921 m to 924 m3.0% from 924 m to 928 m1.8% from 928 m to 933 m2.0% from 933 m to 938 m2.6% from 938 m to 942 m3.3% from 942 m to 948 m5.6% from 948 m to 954 m5.9% from 954 m to 959 m4.3% from 959 m to 963 m4.3% from 963 m to 968 m4.5% from 968 m to 973 m4.8% from 973 m to 977 m6.4% from 977 m to 981 m6.1% from 981 m to 986 m4.3% from 986 m to 991 m4.9% from 991 m to 995 m0.0% from 995 m to 999 m0.0% from 999 m to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km1.7% from 1.0 km to 1.0 km1.7% from 1.0 km to 1.0 km3.5% from 1.0 km to 1.1 km1.4% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km1.5% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km7%20%6%4%2%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.12 km / 0.70 miles
Elevation gain93.7 m / 307 ft
Average gradient8.2%
Maximum gradient27.6%
Elevation high552.3 m / 1,812 ft
Elevation low459.8 m / 1,509 ft
Climb difficulty score9,215.98

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Earlybacker Trubel
Erlenbach (ZH), Bezirk Meilen
1.22 km8.5%103 m
Pflugsteinstrasse
Erlenbach (ZH), Bezirk Meilen
1.21 km8.5%104 m
Pflugsteinstrasse bis Resti
Erlenbach (ZH), Bezirk Meilen
0.98 km8.4%82 m
Hill repeats
Erlenbach (ZH), Bezirk Meilen
1.08 km6%65 m
Zollstrassclimb
Erlenbach (ZH), Bezirk Meilen
0.72 km8.3%59 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 632,119th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 20,999th most difficult cycling climb of all 52,131 climbs in Switzerland.

📉

Places 1,969th out of 7,633 cycling climbs in Zurich.

Ranks 209th out of 753 cycling climbs in Bezirk Meilen.

Ranking 22nd out of 38 cycling climbs in Erlenbach (ZH).

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb