Chemin De Matélon Climb

📍
Chemin de Bovonne, Bex, District d'Aigle, Vaud, 1880, Switzerland

Estimated Climb Time

Loading your rider settings for Chemin De Matélon Climb...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Chemin De Matélon Climb.

1385 m1430 m1470 m1515 m16.7% from 0 m to 4 m22.2% from 4 m to 7 m48.7% from 7 m to 11 m40.0% from 11 m to 15 m32.4% from 15 m to 18 m18.7% from 18 m to 22 m71.1% from 22 m to 26 m57.9% from 26 m to 30 m-8.6% from 30 m to 33 m-8.6% from 33 m to 37 m-52.5% from 37 m to 41 m-76.5% from 41 m to 46 m-56.4% from 46 m to 50 m-16.7% from 50 m to 53 m5.3% from 53 m to 57 m-12.2% from 57 m to 61 m22.6% from 61 m to 66 m28.8% from 66 m to 71 m-43.2% from 71 m to 75 m-9.7% from 75 m to 78 m47.2% from 78 m to 83 m22.0% from 83 m to 87 m39.6% from 87 m to 93 m19.1% from 93 m to 97 m-10.5% from 97 m to 101 m-2.6% from 101 m to 105 m29.0% from 105 m to 111 m32.3% from 111 m to 117 m38.7% from 117 m to 121 m20.9% from 121 m to 125 m-10.4% from 125 m to 130 m-12.5% from 130 m to 134 m16.7% from 134 m to 138 m42.6% from 138 m to 143 m18.4% from 143 m to 146 m-34.2% from 146 m to 150 m-35.1% from 150 m to 154 m-74.4% from 154 m to 158 m-29.0% from 158 m to 161 m-18.7% from 161 m to 164 m4.4% from 164 m to 169 m8.7% from 169 m to 173 m29.0% from 173 m to 179 m25.0% from 179 m to 184 m-9.8% from 184 m to 189 m-21.2% from 189 m to 192 m16.7% from 192 m to 196 m34.0% from 196 m to 201 m8.6% from 201 m to 205 m9.1% from 205 m to 209 m-5.6% from 209 m to 213 m2.8% from 213 m to 216 m-35.0% from 216 m to 220 m44.2% from 220 m to 224 m48.4% from 224 m to 228 m6.7% from 228 m to 231 m32.4% from 231 m to 234 m37.0% from 234 m to 239 m45.0% from 239 m to 245 m47.1% from 245 m to 251 m3.6% from 251 m to 257 m15.6% from 257 m to 261 m13.6% from 261 m to 266 m29.7% from 266 m to 270 m46.2% from 270 m to 273 m20.6% from 273 m to 277 m-18.7% from 277 m to 280 m5.3% from 280 m to 284 m21.4% from 284 m to 288 m4.8% from 288 m to 292 m0.0% from 292 m to 296 m20.8% from 296 m to 301 m15.6% from 301 m to 304 m10.8% from 304 m to 308 m16.3% from 308 m to 312 m5.9% from 312 m to 315 m-22.2% from 315 m to 319 m11.8% from 319 m to 322 m5.9% from 322 m to 326 m22.9% from 326 m to 329 m28.6% from 329 m to 334 m7.3% from 334 m to 338 m-8.8% from 338 m to 342 m7.7% from 342 m to 346 m14.3% from 346 m to 350 m7.7% from 350 m to 354 m25.0% from 354 m to 358 m21.4% from 358 m to 362 m14.3% from 362 m to 366 m-12.8% from 366 m to 370 m6.1% from 370 m to 373 m-12.9% from 373 m to 376 m-18.7% from 376 m to 379 m0.0% from 379 m to 382 m-26.3% from 382 m to 386 m-25.0% from 386 m to 390 m-16.7% from 390 m to 393 m38.9% from 393 m to 397 m23.7% from 397 m to 401 m4.8% from 401 m to 405 m7.7% from 405 m to 409 m5.1% from 409 m to 413 m47.2% from 413 m to 418 m5.3% from 418 m to 422 m-2.6% from 422 m to 426 m-8.3% from 426 m to 429 m4.3% from 429 m to 434 m17.1% from 434 m to 437 m32.4% from 437 m to 441 m41.9% from 441 m to 444 m28.6% from 444 m to 447 m31.2% from 447 m to 451 m17.1% from 451 m to 454 m27.5% from 454 m to 458 m35.0% from 458 m to 462 m40.5% from 462 m to 466 m35.3% from 466 m to 469 m29.0% from 469 m to 472 m37.3% from 472 m to 477 m33.3% from 477 m to 483 m7.3% from 483 m to 488 m16.1% from 488 m to 491 m0.0% from 491 m to 494 m18.7% from 494 m to 497 m7.7% from 497 m to 501 m-12.1% from 501 m to 504 m10.0% from 504 m to 508 m16.1% from 508 m to 512 m15.8% from 512 m to 515 m5.9% from 515 m to 519 m5.0% from 519 m to 523 m0.0% from 523 m to 526 m2.8% from 526 m to 529 m16.1% from 529 m to 533 m17.5% from 533 m to 537 m8.8% from 537 m to 540 m-9.7% from 540 m to 543 m-11.1% from 543 m to 547 m-18.8% from 547 m to 550 m11.1% from 550 m to 554 m11.4% from 554 m to 558 m24.3% from 558 m to 562 m33.9% from 562 m to 567 m38.9% from 567 m to 573 m-28.9% from 573 m to 577 m-16.1% from 577 m to 580 m5.6% from 580 m to 583 m0.0% from 583 m to 588 m27.9% from 588 m to 592 m41.7% from 592 m to 597 m-6.1% from 597 m to 600 m-13.9% from 600 m to 604 m-9.1% from 604 m to 607 m0.0% from 607 m to 610 m6.5% from 610 m to 613 m29.4% from 613 m to 617 m42.9% from 617 m to 620 m44.1% from 620 m to 624 m27.7% from 624 m to 628 m20.5% from 628 m to 633 m19.4% from 633 m to 636 m17.6% from 636 m to 640 m13.9% from 640 m to 643 m8.9% from 643 m to 648 m9.1% from 648 m to 651 m20.0% from 651 m to 655 m46.9% from 655 m to 658 m60.0% from 658 m to 663 m58.5% from 663 m to 668 m53.7% from 668 m to 674 m36.6% from 674 m to 678 m0.0% from 678 m to 681 m23.1% from 681 m to 685 m12.9% from 685 m to 688 m0.0% from 688 m to 691 m38.2% from 691 m to 694 m51.6% from 694 m to 698 m47.2% from 698 m to 701 m-40.4% from 701 m to 706 m-16.7% from 706 m to 709 m-30.8% from 709 m to 713 m-21.2% from 713 m to 717 m0.0% from 717 m to 720 m-21.9% from 720 m to 724 m-14.0% from 724 m to 728 m-4.9% from 728 m to 732 m-13.2% from 732 m to 736 m2.9% from 736 m to 739 m-12.1% from 739 m to 743 m-25.6% from 743 m to 746 m-10.3% from 746 m to 750 m-25.0% from 750 m to 754 m-16.7% from 754 m to 757 m24.4% from 757 m to 761 m27.9% from 761 m to 766 m21.1% from 766 m to 769 m7.9% from 769 m to 773 m25.0% from 773 m to 778 m24.4% from 778 m to 782 m20.5% from 782 m to 786 m9.1% from 786 m to 789 m11.8% from 789 m to 794 m4.8% from 794 m to 798 m-5.0% from 798 m to 802 m-5.0% from 802 m to 806 m12.8% from 806 m to 810 m20.0% from 810 m to 814 m0.0% from 814 m to 817 m-8.1% from 817 m to 821 m8.1% from 821 m to 825 m-2.3% from 825 m to 829 m-2.2% from 829 m to 834 m0.0% from 834 m to 837 m0.0% from 837 m to 840 m-10.5% from 840 m to 844 m-10.5% from 844 m to 848 m-26.8% from 848 m to 852 m0.0% from 852 m to 856 m9.4% from 856 m to 859 m-22.6% from 859 m to 862 m-10.0% from 862 m to 866 m27.0% from 866 m to 870 m0.0% from 870 m to 873 m0.0% from 873 m to 876 m11.4% from 876 m to 881 m15.2% from 881 m to 884 m16.2% from 884 m to 888 m72.9% from 888 m to 893 m48.5% from 893 m to 896 m12.9% from 896 m to 899 m17.6% from 899 m to 902 m-51.6% from 902 m to 905 m-53.3% from 905 m to 908 m0.0% from 908 m to 912 m37.5% from 912 m to 915 m63.6% from 915 m to 918 m47.2% from 918 m to 922 m19.5% from 922 m to 926 m-18.4% from 926 m to 931 m-4.5% from 931 m to 935 m2.4% from 935 m to 939 m2.4% from 939 m to 943 m-2.5% from 943 m to 947 m-16.1% from 947 m to 950 m-15.2% from 950 m to 954 m0.0% from 954 m to 958 m17.0% from 958 m to 962 m19.1% from 962 m to 967 m31.1% from 967 m to 971 m32.0% from 971 m to 976 m12.8% from 976 m to 981 m14.9% from 981 m to 986 m-7.0% from 986 m to 990 m21.4% from 990 m to 994 m-2.0% from 994 m to 999 m-2.2% from 999 m to 1.0 km-9.3% from 1.0 km to 1.0 km-5.0% from 1.0 km to 1.0 km-2.8% from 1.0 km to 1.0 km2.6% from 1.0 km to 1.0 km34.1% from 1.0 km to 1.0 km33.3% from 1.0 km to 1.0 km20.9% from 1.0 km to 1.0 km12.5% from 1.0 km to 1.0 km17.1% from 1.0 km to 1.0 km12.2% from 1.0 km to 1.0 km7.7% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.1 km2.9% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km-7.5% from 1.1 km to 1.1 km5.5% from 1.1 km to 1.1 km17.9% from 1.1 km to 1.1 km30.0% from 1.1 km to 1.1 km33.3% from 1.1 km to 1.1 km24.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-18.9% from 1.1 km to 1.1 km-11.4% from 1.1 km to 1.1 km10.5% from 1.1 km to 1.1 km-5.4% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km-12.5% from 1.1 km to 1.1 km40.6% from 1.1 km to 1.1 km37.7% from 1.1 km to 1.1 km29.4% from 1.1 km to 1.1 km29.7% from 1.1 km to 1.1 km-6.5% from 1.1 km to 1.1 km-11.9% from 1.1 km to 1.1 km36.1% from 1.1 km to 1.1 km27.5% from 1.1 km to 1.2 km3.0% from 1.2 km to 1.2 km15.8% from 1.2 km to 1.2 km25.6% from 1.2 km to 1.2 km32.3% from 1.2 km to 1.2 km-11.1% from 1.2 km to 1.2 km10%14%11%8%11%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.17 km / 0.73 miles
Elevation gain125.3 m / 411 ft
Average gradient10.7%
Maximum gradient24.1%
Elevation high1,511.77 m / 4,960 ft
Elevation low1,386.14 m / 4,548 ft
Climb difficulty score12,535.05

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Rue Du Signal 20 Climb
Bex, District d'Aigle
1.2 km9.6%115 m
Chemin Du Bévieux Climb
Bex, District d'Aigle
1.01 km9.8%99 m
La Pâtissière
Bex, District d'Aigle
1.09 km8.9%97 m
Pâtissière
Bex, District d'Aigle
1.43 km9.2%132 m
Climb Rue du Signal
Bex, District d'Aigle
0.89 km10.4%93 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 429,103rd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 15,470th most difficult cycling climb of all 52,131 climbs in Switzerland.

📉

Places 1,680th out of 6,518 cycling climbs in Vaud.

Ranks 313th out of 632 cycling climbs in District d'Aigle.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 43 climbs) in Bex.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb