Zwieselberg up

📍
Hirseren, Weyer, Amsoldingen, Thun administrative district, Oberland administrative region, Bern, 3633, Switzerland
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Zwieselberg up...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Zwieselberg up.

655 m665 m670 m680 m4.3% from 0 m to 7 m3.1% from 7 m to 13 m4.2% from 13 m to 21 m1.5% from 21 m to 27 m1.6% from 27 m to 34 m1.9% from 34 m to 39 m3.7% from 39 m to 45 m1.9% from 45 m to 50 m1.9% from 50 m to 55 m1.9% from 55 m to 60 m1.7% from 60 m to 66 m1.6% from 66 m to 72 m0.0% from 72 m to 78 m2.0% from 78 m to 83 m0.0% from 83 m to 87 m1.6% from 87 m to 93 m2.8% from 93 m to 101 m3.4% from 101 m to 106 m2.9% from 106 m to 113 m3.4% from 113 m to 119 m3.1% from 119 m to 126 m4.3% from 126 m to 133 m4.6% from 133 m to 139 m3.4% from 139 m to 145 m4.5% from 145 m to 152 m3.2% from 152 m to 158 m4.8% from 158 m to 164 m3.1% from 164 m to 171 m5.1% from 171 m to 176 m4.3% from 176 m to 183 m4.5% from 183 m to 190 m3.0% from 190 m to 197 m4.5% from 197 m to 203 m6.2% from 203 m to 210 m4.3% from 210 m to 217 m6.5% from 217 m to 225 m5.8% from 225 m to 231 m6.0% from 231 m to 238 m5.6% from 238 m to 244 m6.2% from 244 m to 250 m7.2% from 250 m to 258 m6.1% from 258 m to 263 m6.7% from 263 m to 272 m6.1% from 272 m to 277 m7.5% from 277 m to 282 m6.1% from 282 m to 289 m5.3% from 289 m to 295 m4.9% from 295 m to 301 m5.7% from 301 m to 306 m4.9% from 306 m to 312 m4.2% from 312 m to 317 m6.1% from 317 m to 322 m4.1% from 322 m to 327 m5.7% from 327 m to 332 m5.3% from 332 m to 338 m3.8% from 338 m to 343 m3.8% from 343 m to 348 m5.6% from 348 m to 355 m3.4% from 355 m to 361 m3.9% from 361 m to 369 m4.8% from 369 m to 373 m4.3% from 373 m to 378 m4.9% from 378 m to 382 m3.3% from 382 m to 388 m4.8% from 388 m to 394 m3.9% from 394 m to 399 m4.5% from 399 m to 404 m4.1% from 404 m to 409 m2.0% from 409 m to 413 m3.6% from 413 m to 419 m3.6% from 419 m to 425 m3.9% from 425 m to 430 m1.5% from 430 m to 436 m1.9% from 436 m to 442 m0.0% from 442 m to 449 m2.1% from 449 m to 453 m0.0% from 453 m to 460 m1.9% from 460 m to 465 m1.5% from 465 m to 472 m0.0% from 472 m to 477 m1.8% from 477 m to 482 m0.0% from 482 m to 487 m0.0% from 487 m to 493 m0.0% from 493 m to 500 m1.4% from 500 m to 507 m0.0% from 507 m to 514 m0.0% from 514 m to 520 m1.9% from 520 m to 525 m0.0% from 525 m to 532 m0.0% from 532 m to 539 m0.0% from 539 m to 546 m1.3% from 546 m to 554 m0.0% from 554 m to 562 m0.0% from 562 m to 569 m0.0% from 569 m to 576 m0.0% from 576 m to 583 m0.0% from 583 m to 590 m0.0% from 590 m to 596 m0.0% from 596 m to 604 m0.0% from 604 m to 611 m1.2% from 611 m to 619 m0.0% from 619 m to 624 m0.0% from 624 m to 635 m0.0% from 635 m to 642 m0.0% from 642 m to 650 m0.0% from 650 m to 656 m0.0% from 656 m to 662 m-1.4% from 662 m to 669 m0.0% from 669 m to 676 m0.0% from 676 m to 688 m0.0% from 688 m to 695 m0.0% from 695 m to 702 m-1.4% from 702 m to 709 m0.0% from 709 m to 719 m-1.1% from 719 m to 728 m-2.2% from 728 m to 737 m-2.9% from 737 m to 744 m-3.4% from 744 m to 753 m-1.1% from 753 m to 762 m-1.9% from 762 m to 768 m-1.3% from 768 m to 775 m-1.2% from 775 m to 784 m-1.1% from 784 m to 793 m-0.9% from 793 m to 804 m-1.1% from 804 m to 813 m-1.9% from 813 m to 824 m0.0% from 824 m to 833 m-0.8% from 833 m to 845 m-2.4% from 845 m to 857 m-2.9% from 857 m to 868 m-2.0% from 868 m to 877 m-1.8% from 877 m to 889 m0.0% from 889 m to 899 m0.9% from 899 m to 910 m1.0% from 910 m to 920 m0.8% from 920 m to 932 m0.9% from 932 m to 942 m0.8% from 942 m to 954 m1.0% from 954 m to 965 m1.6% from 965 m to 977 m0.8% from 977 m to 990 m0.9% from 990 m to 1.0 km0.9% from 1.0 km to 1.0 km0.9% from 1.0 km to 1.0 km1.1% from 1.0 km to 1.0 km0.8% from 1.0 km to 1.0 km0.8% from 1.0 km to 1.1 km0.9% from 1.1 km to 1.1 km0.8% from 1.1 km to 1.1 km1.1% from 1.1 km to 1.1 km1.0% from 1.1 km to 1.1 km1.0% from 1.1 km to 1.1 km0.8% from 1.1 km to 1.1 km0.9% from 1.1 km to 1.1 km0.9% from 1.1 km to 1.1 km1.2% from 1.1 km to 1.2 km1.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.0% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km2.7% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km3.5% from 1.2 km to 1.2 km4.1% from 1.2 km to 1.3 km2.9% from 1.3 km to 1.3 km2.9% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km1.0% from 1.3 km to 1.3 km1.0% from 1.3 km to 1.3 km1.2% from 1.3 km to 1.3 km1.1% from 1.3 km to 1.3 km1.2% from 1.3 km to 1.3 km1.0% from 1.3 km to 1.3 km1.1% from 1.3 km to 1.4 km1.0% from 1.4 km to 1.4 km1.3% from 1.4 km to 1.4 km1.1% from 1.4 km to 1.4 km1.0% from 1.4 km to 1.4 km1.2% from 1.4 km to 1.4 km1.0% from 1.4 km to 1.4 km1.1% from 1.4 km to 1.4 km1.2% from 1.4 km to 1.4 km1.1% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.3% from 1.4 km to 1.5 km0.0% from 1.5 km to 1.5 km-2.2% from 1.5 km to 1.5 km-1.8% from 1.5 km to 1.5 km-2.6% from 1.5 km to 1.5 km-1.9% from 1.5 km to 1.5 km-2.2% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km-1.1% from 1.5 km to 1.6 km-3.1% from 1.6 km to 1.6 km-3.7% from 1.6 km to 1.6 km-3.2% from 1.6 km to 1.6 km-2.9% from 1.6 km to 1.6 km-2.8% from 1.6 km to 1.6 km-2.8% from 1.6 km to 1.6 km-3.3% from 1.6 km to 1.6 km-1.0% from 1.6 km to 1.6 km-0.9% from 1.6 km to 1.7 km1.4% from 1.7 km to 1.7 km-3.1% from 1.7 km to 1.7 km-10.5% from 1.7 km to 1.7 km-9.3% from 1.7 km to 1.7 km-8.4% from 1.7 km to 1.7 km-7.3% from 1.7 km to 1.7 km-7.3% from 1.7 km to 1.7 km-7.3% from 1.7 km to 1.7 km-6.7% from 1.7 km to 1.8 km-5.9% from 1.8 km to 1.8 km-6.4% from 1.8 km to 1.8 km-5.9% from 1.8 km to 1.8 km-6.0% from 1.8 km to 1.8 km-5.8% from 1.8 km to 1.8 km-6.1% from 1.8 km to 1.8 km-7.6% from 1.8 km to 1.8 km-7.0% from 1.8 km to 1.9 km1.6% from 1.9 km to 1.9 km2.4% from 1.9 km to 1.9 km2.8% from 1.9 km to 1.9 km3.3% from 1.9 km to 1.9 km3.8% from 1.9 km to 1.9 km4.0% from 1.9 km to 1.9 km4.6% from 1.9 km to 1.9 km3.5% from 1.9 km to 1.9 km2.4% from 1.9 km to 2.0 km2.7% from 2.0 km to 2.0 km3.8% from 2.0 km to 2.0 km3.2% from 2.0 km to 2.0 km4.1% from 2.0 km to 2.0 km3.8% from 2.0 km to 2.0 km3.3% from 2.0 km to 2.0 km3.8% from 2.0 km to 2.0 km2.1% from 2.0 km to 2.0 km2.2% from 2.0 km to 2.1 km4.0% from 2.1 km to 2.1 km3.2% from 2.1 km to 2.1 km4.5% from 2.1 km to 2.1 km3.4% from 2.1 km to 2.1 km3.3% from 2.1 km to 2.1 km4.3% from 2.1 km to 2.1 km2.2% from 2.1 km to 2.1 km2.1% from 2.1 km to 2.1 km3.0% from 2.1 km to 2.1 km5.8% from 2.1 km to 2.1 km6.8% from 2.1 km to 2.2 km6.2% from 2.2 km to 2.2 km5.9% from 2.2 km to 2.2 km4.6% from 2.2 km to 2.2 km4.4% from 2.2 km to 2.2 km2.0% from 2.2 km to 2.2 km4.3% from 2.2 km to 2.2 km2.2% from 2.2 km to 2.2 km-2.4% from 2.2 km to 2.2 km-2.4% from 2.2 km to 2.2 km4%-0%1%-2%3%0 m500 m1 km1.5 km2 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance2.23 km / 1.39 miles
Elevation gain19.4 m / 64 ft
Average gradient0.9%
Maximum gradient5.9%
Elevation high678.3 m / 2,225 ft
Elevation low655.2 m / 2,150 ft
Climb difficulty score1,944.02

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,900,089th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 43,065th most difficult cycling climb of all 52,131 climbs in Switzerland.

📉

Places 5,237th out of 6,309 cycling climbs in Bern.

Ranks 401st out of 469 cycling climbs in Thun administrative district.

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 6 climbs) in Amsoldingen.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb