Uphill challenge to Arni

📍
Litzistrasse, Jonental, Jonen, Bezirk Bremgarten, Aargau, 8916, Switzerland
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Uphill challenge to Arni...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Uphill challenge to Arni.

500 m525 m550 m575 m11.1% from 0 m to 4 m10.0% from 4 m to 8 m12.2% from 8 m to 13 m11.6% from 13 m to 17 m11.4% from 17 m to 21 m9.5% from 21 m to 25 m12.5% from 25 m to 29 m10.9% from 29 m to 34 m10.9% from 34 m to 39 m8.6% from 39 m to 44 m10.9% from 44 m to 50 m11.5% from 50 m to 55 m10.3% from 55 m to 61 m10.5% from 61 m to 67 m12.0% from 67 m to 72 m10.4% from 72 m to 76 m10.6% from 76 m to 81 m6.1% from 81 m to 86 m4.3% from 86 m to 91 m4.3% from 91 m to 95 m3.8% from 95 m to 101 m1.9% from 101 m to 106 m3.8% from 106 m to 111 m3.4% from 111 m to 117 m3.1% from 117 m to 120 m0.0% from 120 m to 123 m3.1% from 123 m to 127 m3.1% from 127 m to 130 m3.0% from 130 m to 133 m0.0% from 133 m to 138 m2.6% from 138 m to 141 m0.0% from 141 m to 145 m2.9% from 145 m to 149 m0.0% from 149 m to 153 m4.7% from 153 m to 158 m1.9% from 158 m to 163 m3.2% from 163 m to 166 m0.0% from 166 m to 170 m2.3% from 170 m to 174 m2.2% from 174 m to 178 m3.5% from 178 m to 184 m1.8% from 184 m to 190 m1.9% from 190 m to 195 m2.1% from 195 m to 200 m2.3% from 200 m to 204 m0.0% from 204 m to 207 m2.6% from 207 m to 211 m2.6% from 211 m to 215 m2.6% from 215 m to 219 m2.6% from 219 m to 223 m5.1% from 223 m to 227 m5.3% from 227 m to 230 m5.3% from 230 m to 234 m2.9% from 234 m to 238 m6.3% from 238 m to 241 m2.5% from 241 m to 245 m6.3% from 245 m to 248 m7.1% from 248 m to 252 m5.3% from 252 m to 256 m7.1% from 256 m to 260 m6.5% from 260 m to 265 m7.5% from 265 m to 270 m5.6% from 270 m to 276 m7.5% from 276 m to 281 m7.5% from 281 m to 286 m7.4% from 286 m to 292 m9.1% from 292 m to 297 m8.6% from 297 m to 301 m10.8% from 301 m to 304 m10.0% from 304 m to 309 m8.9% from 309 m to 314 m9.1% from 314 m to 318 m12.5% from 318 m to 323 m10.0% from 323 m to 327 m9.7% from 327 m to 330 m11.4% from 330 m to 334 m8.3% from 334 m to 337 m11.4% from 337 m to 341 m12.8% from 341 m to 345 m9.5% from 345 m to 349 m11.7% from 349 m to 355 m12.1% from 355 m to 358 m13.2% from 358 m to 362 m11.1% from 362 m to 365 m13.9% from 365 m to 369 m11.4% from 369 m to 373 m11.8% from 373 m to 378 m7.9% from 378 m to 381 m12.9% from 381 m to 385 m6.1% from 385 m to 388 m14.3% from 388 m to 391 m12.8% from 391 m to 396 m13.7% from 396 m to 401 m13.5% from 401 m to 406 m12.2% from 406 m to 411 m14.3% from 411 m to 415 m15.4% from 415 m to 419 m10.8% from 419 m to 423 m6.7% from 423 m to 428 m8.0% from 428 m to 433 m9.1% from 433 m to 438 m7.3% from 438 m to 444 m6.3% from 444 m to 447 m9.4% from 447 m to 450 m6.5% from 450 m to 453 m6.5% from 453 m to 456 m7.3% from 456 m to 462 m9.6% from 462 m to 467 m8.5% from 467 m to 472 m6.2% from 472 m to 476 m6.2% from 476 m to 481 m4.1% from 481 m to 486 m5.5% from 486 m to 492 m1.9% from 492 m to 497 m3.6% from 497 m to 502 m5.2% from 502 m to 508 m3.6% from 508 m to 514 m4.2% from 514 m to 518 m4.9% from 518 m to 523 m5.1% from 523 m to 526 m2.4% from 526 m to 531 m0.0% from 531 m to 535 m-1.8% from 535 m to 541 m0.0% from 541 m to 546 m2.0% from 546 m to 551 m0.0% from 551 m to 556 m0.0% from 556 m to 561 m2.2% from 561 m to 565 m2.1% from 565 m to 570 m3.6% from 570 m to 575 m5.6% from 575 m to 581 m4.0% from 581 m to 586 m2.0% from 586 m to 591 m0.0% from 591 m to 595 m-2.0% from 595 m to 600 m-4.1% from 600 m to 605 m-8.9% from 605 m to 610 m-2.3% from 610 m to 614 m-7.8% from 614 m to 619 m-6.7% from 619 m to 625 m-6.5% from 625 m to 628 m-6.5% from 628 m to 631 m0.0% from 631 m to 634 m-3.4% from 634 m to 640 m0.0% from 640 m to 646 m5.6% from 646 m to 651 m4.1% from 651 m to 656 m4.3% from 656 m to 661 m8.2% from 661 m to 666 m12.5% from 666 m to 671 m15.6% from 671 m to 675 m10.6% from 675 m to 680 m13.0% from 680 m to 684 m12.5% from 684 m to 689 m11.1% from 689 m to 694 m11.1% from 694 m to 698 m13.0% from 698 m to 703 m11.8% from 703 m to 708 m15.8% from 708 m to 714 m12.5% from 714 m to 719 m11.3% from 719 m to 724 m11.5% from 724 m to 730 m9.8% from 730 m to 735 m10.4% from 735 m to 740 m10.6% from 740 m to 744 m13.7% from 744 m to 749 m12.2% from 749 m to 754 m10.6% from 754 m to 759 m10.6% from 759 m to 764 m12.5% from 764 m to 768 m11.1% from 768 m to 773 m13.3% from 773 m to 777 m10.6% from 777 m to 782 m13.3% from 782 m to 787 m11.1% from 787 m to 791 m12.5% from 791 m to 796 m8.2% from 796 m to 801 m6.0% from 801 m to 806 m6.0% from 806 m to 811 m4.2% from 811 m to 816 m4.1% from 816 m to 821 m4.0% from 821 m to 826 m4.1% from 826 m to 830 m2.1% from 830 m to 835 m2.1% from 835 m to 840 m0.0% from 840 m to 845 m2.1% from 845 m to 849 m3.8% from 849 m to 854 m2.9% from 854 m to 858 m6.3% from 858 m to 861 m3.1% from 861 m to 864 m3.2% from 864 m to 867 m0.0% from 867 m to 870 m3.3% from 870 m to 873 m1.7% from 873 m to 879 m1.7% from 879 m to 885 m3.7% from 885 m to 891 m6.4% from 891 m to 895 m7.1% from 895 m to 900 m7.8% from 900 m to 905 m6.7% from 905 m to 908 m10.0% from 908 m to 911 m6.5% from 911 m to 914 m10.3% from 914 m to 920 m8.5% from 920 m to 925 m6.7% from 925 m to 931 m8.5% from 931 m to 937 m8.8% from 937 m to 943 m8.5% from 943 m to 949 m6.5% from 949 m to 952 m6.8% from 952 m to 958 m10.5% from 958 m to 964 m10.3% from 964 m to 969 m9.1% from 969 m to 975 m5.6% from 975 m to 980 m5.7% from 980 m to 986 m6.0% from 986 m to 991 m8.9% from 991 m to 996 m6.7% from 996 m to 999 m8.6% from 999 m to 1.0 km5.7% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km5.4% from 1.0 km to 1.0 km2.8% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km5.4% from 1.0 km to 1.0 km7.9% from 1.0 km to 1.0 km7.1% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km5%9%5%7%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.04 km / 0.64 miles
Elevation gain67.8 m / 222 ft
Average gradient6.5%
Maximum gradient13.7%
Elevation high570.2 m / 1,871 ft
Elevation low502.4 m / 1,648 ft
Climb difficulty score6,776.75

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
litzistrasse
Jonen, Bezirk Bremgarten
0.71 km6.8%49 m
Abschlagen steep part
Jonen, Bezirk Bremgarten
1 km4.2%42 m
Tom Dumoulin siempre pedalea
Jonen, Bezirk Bremgarten
1.53 km3.9%60 m
Jonen - Litzi
Jonen, Bezirk Bremgarten
1.22 km3.4%41 m
Litzi-Arni (Waldhof Uphill)
Jonen, Bezirk Bremgarten
1.82 km5.4%98 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 868,876th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 26,484th most difficult cycling climb of all 52,131 climbs in Switzerland.

📉

Places 1,377th out of 3,238 cycling climbs in Aargau.

Ranks 124th out of 351 cycling climbs in Bezirk Bremgarten.

🏵️

A local climb of note, this is the 6th most difficult cycling climb (out of 29 climbs) in Jonen.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb