Pista Santo Domingo Up

📍
Palomera, Pedroches, Córdoba, Andalusia, 14012, Spain
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Pista Santo Domingo Up...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Pista Santo Domingo Up.

235 m255 m270 m290 m13.3% from 0 m to 2 m6.7% from 2 m to 3 m13.3% from 3 m to 5 m14.3% from 5 m to 6 m14.3% from 6 m to 7 m13.3% from 7 m to 9 m13.3% from 9 m to 10 m20.0% from 10 m to 12 m17.6% from 12 m to 14 m12.5% from 14 m to 15 m5.6% from 15 m to 17 m5.3% from 17 m to 19 m5.6% from 19 m to 21 m11.1% from 21 m to 22 m5.6% from 22 m to 24 m5.9% from 24 m to 26 m5.6% from 26 m to 28 m17.6% from 28 m to 29 m11.8% from 29 m to 31 m11.8% from 31 m to 33 m15.8% from 33 m to 35 m11.1% from 35 m to 37 m10.0% from 37 m to 39 m5.3% from 39 m to 40 m10.0% from 40 m to 42 m4.8% from 42 m to 45 m5.3% from 45 m to 46 m0.0% from 46 m to 48 m5.3% from 48 m to 50 m0.0% from 50 m to 52 m5.6% from 52 m to 54 m0.0% from 54 m to 56 m5.9% from 56 m to 57 m5.9% from 57 m to 59 m11.1% from 59 m to 61 m11.1% from 61 m to 63 m10.0% from 63 m to 65 m10.0% from 65 m to 67 m13.6% from 67 m to 69 m16.7% from 69 m to 71 m17.4% from 71 m to 74 m4.0% from 74 m to 76 m4.0% from 76 m to 79 m7.4% from 79 m to 81 m3.8% from 81 m to 84 m3.7% from 84 m to 87 m7.7% from 87 m to 89 m3.7% from 89 m to 92 m4.0% from 92 m to 94 m3.8% from 94 m to 97 m0.0% from 97 m to 99 m3.8% from 99 m to 102 m4.2% from 102 m to 104 m4.0% from 104 m to 107 m3.8% from 107 m to 110 m7.4% from 110 m to 112 m7.4% from 112 m to 115 m11.5% from 115 m to 118 m14.8% from 118 m to 120 m14.3% from 120 m to 123 m14.8% from 123 m to 126 m7.1% from 126 m to 129 m6.9% from 129 m to 131 m6.7% from 131 m to 134 m3.3% from 134 m to 137 m6.7% from 137 m to 140 m3.2% from 140 m to 144 m6.5% from 144 m to 147 m6.7% from 147 m to 150 m3.3% from 150 m to 153 m6.5% from 153 m to 156 m6.7% from 156 m to 159 m20.0% from 159 m to 162 m24.1% from 162 m to 165 m3.4% from 165 m to 168 m0.0% from 168 m to 170 m3.6% from 170 m to 173 m0.0% from 173 m to 176 m0.0% from 176 m to 179 m3.8% from 179 m to 181 m0.0% from 181 m to 184 m3.8% from 184 m to 187 m0.0% from 187 m to 190 m3.8% from 190 m to 192 m3.7% from 192 m to 195 m3.7% from 195 m to 198 m11.1% from 198 m to 200 m7.4% from 200 m to 203 m10.7% from 203 m to 206 m7.7% from 206 m to 208 m3.7% from 208 m to 211 m3.8% from 211 m to 214 m3.7% from 214 m to 216 m4.0% from 216 m to 219 m4.2% from 219 m to 221 m4.0% from 221 m to 224 m12.5% from 224 m to 226 m8.0% from 226 m to 229 m12.5% from 229 m to 231 m3.8% from 231 m to 234 m4.2% from 234 m to 236 m8.0% from 236 m to 239 m8.0% from 239 m to 241 m4.0% from 241 m to 244 m4.2% from 244 m to 246 m12.5% from 246 m to 248 m12.5% from 248 m to 251 m12.5% from 251 m to 253 m8.3% from 253 m to 256 m4.2% from 256 m to 258 m4.2% from 258 m to 260 m8.3% from 260 m to 263 m4.0% from 263 m to 265 m4.0% from 265 m to 268 m11.5% from 268 m to 270 m15.4% from 270 m to 273 m11.5% from 273 m to 276 m3.7% from 276 m to 278 m7.4% from 278 m to 281 m3.7% from 281 m to 284 m3.7% from 284 m to 286 m3.6% from 286 m to 289 m7.4% from 289 m to 292 m7.1% from 292 m to 295 m10.3% from 295 m to 298 m10.7% from 298 m to 300 m3.6% from 300 m to 303 m3.6% from 303 m to 306 m3.4% from 306 m to 309 m7.1% from 309 m to 312 m3.4% from 312 m to 315 m10.7% from 315 m to 317 m10.7% from 317 m to 320 m11.1% from 320 m to 323 m10.7% from 323 m to 326 m7.1% from 326 m to 328 m7.1% from 328 m to 331 m6.7% from 331 m to 334 m14.3% from 334 m to 337 m10.7% from 337 m to 340 m14.3% from 340 m to 343 m7.1% from 343 m to 345 m7.4% from 345 m to 348 m7.4% from 348 m to 351 m14.8% from 351 m to 354 m14.3% from 354 m to 356 m7.1% from 356 m to 359 m6.9% from 359 m to 362 m3.4% from 362 m to 365 m6.7% from 365 m to 368 m10.0% from 368 m to 371 m12.9% from 371 m to 374 m6.9% from 374 m to 377 m6.7% from 377 m to 380 m6.7% from 380 m to 383 m6.7% from 383 m to 386 m3.6% from 386 m to 389 m3.4% from 389 m to 392 m7.1% from 392 m to 394 m7.1% from 394 m to 397 m10.3% from 397 m to 400 m6.9% from 400 m to 403 m3.4% from 403 m to 406 m3.3% from 406 m to 409 m3.4% from 409 m to 412 m3.2% from 412 m to 415 m6.7% from 415 m to 418 m6.7% from 418 m to 421 m6.5% from 421 m to 424 m10.0% from 424 m to 427 m9.1% from 427 m to 430 m6.5% from 430 m to 433 m3.0% from 433 m to 437 m3.2% from 437 m to 440 m0.0% from 440 m to 443 m3.2% from 443 m to 446 m6.1% from 446 m to 449 m6.5% from 449 m to 453 m6.5% from 453 m to 456 m3.2% from 456 m to 459 m0.0% from 459 m to 462 m3.1% from 462 m to 465 m3.1% from 465 m to 468 m0.0% from 468 m to 472 m3.0% from 472 m to 475 m5.9% from 475 m to 479 m3.0% from 479 m to 482 m5.7% from 482 m to 485 m8.8% from 485 m to 489 m11.4% from 489 m to 492 m5.9% from 492 m to 496 m5.7% from 496 m to 499 m5.9% from 499 m to 503 m6.1% from 503 m to 506 m2.9% from 506 m to 509 m6.5% from 509 m to 512 m9.4% from 512 m to 516 m12.9% from 516 m to 519 m9.4% from 519 m to 522 m6.5% from 522 m to 525 m3.4% from 525 m to 528 m3.2% from 528 m to 531 m6.1% from 531 m to 534 m3.1% from 534 m to 537 m6.5% from 537 m to 541 m12.1% from 541 m to 544 m11.8% from 544 m to 547 m6.1% from 547 m to 551 m6.2% from 551 m to 554 m3.0% from 554 m to 557 m6.3% from 557 m to 560 m3.0% from 560 m to 564 m6.2% from 564 m to 567 m6.3% from 567 m to 570 m9.1% from 570 m to 573 m11.8% from 573 m to 577 m5.7% from 577 m to 580 m2.9% from 580 m to 584 m0.0% from 584 m to 587 m2.6% from 587 m to 591 m2.5% from 591 m to 595 m2.4% from 595 m to 599 m0.0% from 599 m to 604 m0.0% from 604 m to 608 m0.0% from 608 m to 614 m0.0% from 614 m to 619 m1.8% from 619 m to 625 m0.0% from 625 m to 630 m0.0% from 630 m to 636 m0.0% from 636 m to 642 m2.0% from 642 m to 647 m2.1% from 647 m to 651 m2.4% from 651 m to 656 m2.6% from 656 m to 659 m3.0% from 659 m to 663 m6.3% from 663 m to 666 m7.4% from 666 m to 669 m11.1% from 669 m to 671 m11.5% from 671 m to 674 m11.5% from 674 m to 677 m7.7% from 677 m to 679 m7.4% from 679 m to 682 m3.8% from 682 m to 684 m15.4% from 684 m to 687 m17.9% from 687 m to 690 m14.8% from 690 m to 693 m18.5% from 693 m to 695 m11.1% from 695 m to 698 m7.4% from 698 m to 701 m15.4% from 701 m to 703 m19.2% from 703 m to 706 m16.0% from 706 m to 708 m8.0% from 708 m to 711 m11.5% from 711 m to 713 m15.4% from 713 m to 716 m15.4% from 716 m to 719 m11.5% from 719 m to 721 m12.0% from 721 m to 724 m7.1% from 724 m to 727 m7.1% from 727 m to 729 m6.9% from 729 m to 732 m10.0% from 732 m to 735 m12.9% from 735 m to 738 m9.7% from 738 m to 741 m8.8% from 741 m to 745 m2.9% from 745 m to 748 m2.7% from 748 m to 752 m5.1% from 752 m to 756 m5.0% from 756 m to 760 m2.4% from 760 m to 764 m8%6%7%8%5%6%5%9%0 m100 m200 m300 m400 m500 m600 m700 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.76 km / 0.47 miles
Elevation gain51.2 m / 168 ft
Average gradient6.7%
Maximum gradient16.7%
Elevation high287.4 m / 943 ft
Elevation low236.2 m / 775 ft
Climb difficulty score5,118.8

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
LA CANTERA UP
Pedroches, Córdoba
1.02 km5.1%52 m
Arroyo Pedroche-Alto Finca
Pedroches, Córdoba
0.5 km8.7%44 m
pista_la viña up_mtb
Pedroches, Córdoba
0.35 km8.6%30 m
subida dura iron track 2019
Pedroches, Córdoba
0.39 km15.2%60 m
Vereda Santo Domingo
Pedroches, Córdoba
2.7 km5.2%141 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,080,303rd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 127,208th most difficult cycling climb of all 238,923 climbs in Spain.

📉

Places 18,711th out of 33,856 cycling climbs in Andalusia.

Ranks 894th out of 1,729 cycling climbs in Córdoba.

🏵️

A local climb of note, this is the 7th most difficult cycling climb (out of 10 climbs) in Pedroches.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb