Peixeninho Climb MTB

📍
Rua Doutor Sá Carneiro, Peixeninho, Gosende, Castro Daire, Viseu, Portugal
Uncategorised

Estimated Climb Time

Loading your rider settings for Peixeninho Climb MTB...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Peixeninho Climb MTB.

975 m1000 m1020 m1045 m12.9% from 0 m to 3 m14.0% from 3 m to 9 m12.0% from 9 m to 14 m10.7% from 14 m to 19 m9.7% from 19 m to 23 m12.1% from 23 m to 26 m12.5% from 26 m to 29 m12.1% from 29 m to 32 m9.4% from 32 m to 36 m13.5% from 36 m to 39 m11.4% from 39 m to 43 m10.9% from 43 m to 48 m11.1% from 48 m to 54 m15.5% from 54 m to 59 m17.5% from 59 m to 65 m15.4% from 65 m to 70 m15.4% from 70 m to 76 m13.6% from 76 m to 80 m17.1% from 80 m to 83 m10.8% from 83 m to 87 m7.7% from 87 m to 91 m13.2% from 91 m to 95 m15.0% from 95 m to 99 m15.2% from 99 m to 103 m11.1% from 103 m to 108 m11.9% from 108 m to 112 m9.8% from 112 m to 116 m7.7% from 116 m to 120 m12.8% from 120 m to 124 m12.2% from 124 m to 128 m9.8% from 128 m to 132 m10.3% from 132 m to 136 m10.5% from 136 m to 140 m4.8% from 140 m to 144 m2.3% from 144 m to 149 m2.2% from 149 m to 153 m0.0% from 153 m to 158 m0.0% from 158 m to 162 m0.0% from 162 m to 166 m0.0% from 166 m to 170 m2.2% from 170 m to 175 m2.2% from 175 m to 179 m2.2% from 179 m to 184 m0.0% from 184 m to 189 m0.0% from 189 m to 193 m8.3% from 193 m to 198 m6.2% from 198 m to 203 m6.3% from 203 m to 208 m9.4% from 208 m to 213 m9.1% from 213 m to 216 m9.4% from 216 m to 220 m8.8% from 220 m to 223 m8.8% from 223 m to 226 m5.9% from 226 m to 230 m8.6% from 230 m to 233 m8.6% from 233 m to 237 m8.8% from 237 m to 240 m9.1% from 240 m to 244 m6.1% from 244 m to 247 m9.7% from 247 m to 250 m10.0% from 250 m to 253 m7.8% from 253 m to 258 m8.9% from 258 m to 264 m8.8% from 264 m to 269 m7.4% from 269 m to 275 m7.1% from 275 m to 280 m5.5% from 280 m to 286 m3.8% from 286 m to 291 m1.9% from 291 m to 297 m0.0% from 297 m to 302 m3.8% from 302 m to 307 m3.7% from 307 m to 313 m3.5% from 313 m to 318 m3.2% from 318 m to 322 m3.3% from 322 m to 325 m5.0% from 325 m to 331 m5.3% from 331 m to 336 m5.5% from 336 m to 342 m5.7% from 342 m to 347 m5.9% from 347 m to 352 m8.5% from 352 m to 357 m6.2% from 357 m to 362 m6.0% from 362 m to 367 m8.2% from 367 m to 372 m7.8% from 372 m to 377 m8.9% from 377 m to 382 m7.4% from 382 m to 388 m7.4% from 388 m to 393 m5.5% from 393 m to 399 m5.4% from 399 m to 404 m1.8% from 404 m to 410 m-1.8% from 410 m to 415 m-1.7% from 415 m to 421 m-3.4% from 421 m to 427 m-3.2% from 427 m to 430 m-3.3% from 430 m to 433 m-1.8% from 433 m to 439 m0.0% from 439 m to 444 m0.0% from 444 m to 449 m2.2% from 449 m to 454 m4.2% from 454 m to 458 m3.7% from 458 m to 464 m3.8% from 464 m to 469 m5.6% from 469 m to 474 m5.6% from 474 m to 480 m5.6% from 480 m to 485 m3.6% from 485 m to 491 m7.4% from 491 m to 496 m8.8% from 496 m to 502 m12.3% from 502 m to 508 m12.3% from 508 m to 513 m12.3% from 513 m to 519 m13.8% from 519 m to 525 m12.5% from 525 m to 530 m12.7% from 530 m to 536 m12.3% from 536 m to 542 m12.3% from 542 m to 547 m12.5% from 547 m to 553 m12.7% from 553 m to 558 m13.0% from 558 m to 564 m15.1% from 564 m to 569 m9.3% from 569 m to 575 m3.6% from 575 m to 580 m3.7% from 580 m to 585 m6.0% from 585 m to 590 m5.6% from 590 m to 594 m4.9% from 594 m to 598 m2.3% from 598 m to 603 m0.0% from 603 m to 607 m0.0% from 607 m to 612 m0.0% from 612 m to 616 m-3.2% from 616 m to 619 m-3.2% from 619 m to 622 m-3.2% from 622 m to 625 m0.0% from 625 m to 628 m-2.9% from 628 m to 631 m0.0% from 631 m to 635 m0.0% from 635 m to 638 m0.0% from 638 m to 641 m0.0% from 641 m to 644 m0.0% from 644 m to 648 m3.0% from 648 m to 651 m6.1% from 651 m to 654 m6.1% from 654 m to 658 m9.1% from 658 m to 661 m9.1% from 661 m to 664 m9.1% from 664 m to 667 m8.3% from 667 m to 672 m10.9% from 672 m to 677 m10.4% from 677 m to 682 m12.8% from 682 m to 686 m12.5% from 686 m to 691 m10.6% from 691 m to 696 m11.1% from 696 m to 700 m11.6% from 700 m to 705 m10.5% from 705 m to 708 m8.1% from 708 m to 712 m12.8% from 712 m to 716 m9.8% from 716 m to 720 m12.2% from 720 m to 724 m10.3% from 724 m to 728 m10.3% from 728 m to 732 m10.8% from 732 m to 736 m9.1% from 736 m to 739 m8.8% from 739 m to 742 m8.8% from 742 m to 746 m11.8% from 746 m to 749 m8.6% from 749 m to 753 m9.1% from 753 m to 756 m9.1% from 756 m to 759 m6.3% from 759 m to 763 m9.7% from 763 m to 766 m6.7% from 766 m to 769 m9.4% from 769 m to 772 m10.0% from 772 m to 775 m7.5% from 775 m to 780 m10.9% from 780 m to 786 m8.5% from 786 m to 792 m5.2% from 792 m to 797 m5.0% from 797 m to 803 m3.5% from 803 m to 809 m5.6% from 809 m to 814 m3.5% from 814 m to 820 m3.4% from 820 m to 826 m3.4% from 826 m to 832 m5.1% from 832 m to 838 m3.4% from 838 m to 844 m5.1% from 844 m to 849 m5.4% from 849 m to 855 m6.5% from 855 m to 858 m6.5% from 858 m to 861 m0.0% from 861 m to 865 m-3.0% from 865 m to 868 m-2.9% from 868 m to 872 m-2.8% from 872 m to 875 m-2.7% from 875 m to 879 m-2.3% from 879 m to 883 m0.0% from 883 m to 890 m3.6% from 890 m to 898 m2.9% from 898 m to 902 m4.3% from 902 m to 906 m0.0% from 906 m to 911 m0.0% from 911 m to 915 m0.0% from 915 m to 921 m2.1% from 921 m to 925 m2.3% from 925 m to 930 m4.7% from 930 m to 934 m1.9% from 934 m to 939 m5.1% from 939 m to 945 m1.8% from 945 m to 951 m3.7% from 951 m to 956 m1.8% from 956 m to 962 m3.8% from 962 m to 967 m1.7% from 967 m to 973 m3.8% from 973 m to 978 m1.8% from 978 m to 984 m2.1% from 984 m to 989 m1.9% from 989 m to 994 m2.0% from 994 m to 999 m2.0% from 999 m to 1.0 km2.2% from 1.0 km to 1.0 km3.7% from 1.0 km to 1.0 km2.4% from 1.0 km to 1.0 km2.5% from 1.0 km to 1.0 km4.3% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km3.4% from 1.0 km to 1.0 km4.1% from 1.0 km to 1.0 km4.2% from 1.0 km to 1.1 km6.4% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km4.4% from 1.1 km to 1.1 km6.7% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km6.7% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km6.4% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km5.8% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km5.5% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km-3.4% from 1.1 km to 1.1 km-1.7% from 1.1 km to 1.1 km-1.7% from 1.1 km to 1.1 km-3.3% from 1.1 km to 1.2 km-1.5% from 1.2 km to 1.2 km-1.7% from 1.2 km to 1.2 km-1.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km-1.4% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-2.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-1.6% from 1.3 km to 1.3 km-3.6% from 1.3 km to 1.3 km-3.7% from 1.3 km to 1.3 km-2.9% from 1.3 km to 1.3 km-3.6% from 1.3 km to 1.3 km-1.8% from 1.3 km to 1.3 km-3.5% from 1.3 km to 1.3 km-5.3% from 1.3 km to 1.3 km-3.6% from 1.3 km to 1.3 km-3.4% from 1.3 km to 1.3 km-2.0% from 1.3 km to 1.3 km-3.4% from 1.3 km to 1.3 km-1.9% from 1.3 km to 1.3 km-1.8% from 1.3 km to 1.3 km-3.4% from 1.3 km to 1.4 km-1.8% from 1.4 km to 1.4 km-1.9% from 1.4 km to 1.4 km-3.6% from 1.4 km to 1.4 km-3.1% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-2.4% from 1.4 km to 1.4 km-2.2% from 1.4 km to 1.4 km-2.6% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.8% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.9% from 1.4 km to 1.4 km1.8% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.5 km9%4%8%4%2%-2%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.45 km / 0.90 miles
Elevation gain64.8 m / 213 ft
Average gradient4.5%
Maximum gradient16%
Elevation high1,044 m / 3,425 ft
Elevation low975.2 m / 3,199 ft
Climb difficulty score6,485.08

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Gosende Climb
Gosende, Castro Daire
1.22 km5.7%69 m
Subida de Rossão
Gosende, Castro Daire
1.92 km5.6%108 m
CM1126 - Alto Gosende
Gosende, Castro Daire
0.82 km6.5%53 m
Cotelo montanha 1° Categoria
Gosende, Castro Daire
1.01 km8.5%87 m
Avenida cruzeiro - cruzamento rossão
Gosende, Castro Daire
0.71 km3.9%28 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 900,025th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 22,850th most difficult cycling climb of all 57,636 climbs in Portugal.

📉

Places 1,430th out of 2,500 cycling climbs in Viseu.

Ranks 93rd out of 138 cycling climbs in Castro Daire.

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 10 climbs) in Gosende.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb