poraż west-czaszyn up

📍
2, Stawki, Poraż, gmina Zagórz, Sanok County, Subcarpathian Voivodeship, 38-516, Poland
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for poraż west-czaszyn up...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of poraż west-czaszyn up.

405 m415 m425 m435 m5.1% from 0 m to 6 m5.2% from 6 m to 12 m5.5% from 12 m to 17 m5.3% from 17 m to 23 m5.3% from 23 m to 29 m5.9% from 29 m to 34 m4.1% from 34 m to 39 m2.2% from 39 m to 43 m-2.2% from 43 m to 48 m0.0% from 48 m to 52 m0.0% from 52 m to 56 m2.5% from 56 m to 60 m0.0% from 60 m to 64 m0.0% from 64 m to 68 m0.0% from 68 m to 73 m2.3% from 73 m to 77 m0.0% from 77 m to 82 m0.0% from 82 m to 86 m2.0% from 86 m to 91 m0.0% from 91 m to 96 m1.9% from 96 m to 102 m0.0% from 102 m to 107 m3.8% from 107 m to 112 m3.6% from 112 m to 118 m3.8% from 118 m to 123 m3.9% from 123 m to 128 m4.1% from 128 m to 133 m1.9% from 133 m to 138 m3.9% from 138 m to 143 m4.0% from 143 m to 148 m2.0% from 148 m to 154 m4.0% from 154 m to 159 m4.0% from 159 m to 164 m2.0% from 164 m to 168 m4.0% from 168 m to 173 m2.1% from 173 m to 178 m4.3% from 178 m to 183 m4.3% from 183 m to 188 m4.2% from 188 m to 192 m2.0% from 192 m to 197 m4.0% from 197 m to 202 m4.0% from 202 m to 207 m1.9% from 207 m to 213 m3.4% from 213 m to 218 m3.8% from 218 m to 224 m3.8% from 224 m to 229 m1.9% from 229 m to 234 m3.6% from 234 m to 240 m1.8% from 240 m to 245 m3.5% from 245 m to 251 m1.8% from 251 m to 256 m3.5% from 256 m to 262 m1.7% from 262 m to 268 m3.4% from 268 m to 274 m1.7% from 274 m to 280 m3.3% from 280 m to 286 m1.7% from 286 m to 292 m3.3% from 292 m to 298 m1.7% from 298 m to 304 m1.7% from 304 m to 310 m1.7% from 310 m to 316 m0.0% from 316 m to 322 m1.6% from 322 m to 328 m3.2% from 328 m to 334 m0.0% from 334 m to 341 m1.6% from 341 m to 347 m1.5% from 347 m to 353 m0.0% from 353 m to 360 m-1.6% from 360 m to 366 m-1.5% from 366 m to 373 m-3.1% from 373 m to 379 m-1.5% from 379 m to 386 m-3.1% from 386 m to 392 m-1.5% from 392 m to 399 m-3.2% from 399 m to 405 m-1.6% from 405 m to 411 m-1.7% from 411 m to 417 m-1.7% from 417 m to 423 m1.7% from 423 m to 429 m1.8% from 429 m to 434 m1.8% from 434 m to 440 m1.8% from 440 m to 446 m1.8% from 446 m to 451 m1.8% from 451 m to 457 m1.7% from 457 m to 463 m1.8% from 463 m to 468 m1.8% from 468 m to 474 m1.8% from 474 m to 480 m3.6% from 480 m to 485 m3.7% from 485 m to 490 m3.7% from 490 m to 496 m5.7% from 496 m to 501 m3.7% from 501 m to 507 m3.6% from 507 m to 512 m5.3% from 512 m to 518 m3.5% from 518 m to 523 m3.6% from 523 m to 529 m3.5% from 529 m to 535 m1.7% from 535 m to 541 m3.4% from 541 m to 547 m3.6% from 547 m to 552 m3.7% from 552 m to 558 m3.6% from 558 m to 563 m5.3% from 563 m to 569 m3.6% from 569 m to 574 m5.7% from 574 m to 580 m3.8% from 580 m to 585 m5.8% from 585 m to 590 m5.9% from 590 m to 595 m4.0% from 595 m to 600 m6.4% from 600 m to 605 m6.3% from 605 m to 610 m6.0% from 610 m to 615 m7.5% from 615 m to 620 m5.5% from 620 m to 626 m7.1% from 626 m to 631 m5.4% from 631 m to 637 m7.0% from 637 m to 642 m5.2% from 642 m to 648 m5.3% from 648 m to 654 m5.2% from 654 m to 660 m5.1% from 660 m to 666 m5.2% from 666 m to 671 m4.9% from 671 m to 678 m5.3% from 678 m to 683 m5.4% from 683 m to 689 m3.8% from 689 m to 694 m5.7% from 694 m to 699 m5.9% from 699 m to 705 m7.5% from 705 m to 710 m5.8% from 710 m to 715 m5.6% from 715 m to 720 m7.3% from 720 m to 726 m5.6% from 726 m to 731 m3.8% from 731 m to 737 m5.6% from 737 m to 742 m5.6% from 742 m to 747 m5.6% from 747 m to 753 m5.5% from 753 m to 758 m3.6% from 758 m to 764 m5.3% from 764 m to 770 m5.5% from 770 m to 775 m3.6% from 775 m to 781 m5.5% from 781 m to 786 m1.9% from 786 m to 792 m1.8% from 792 m to 797 m1.8% from 797 m to 803 m1.7% from 803 m to 809 m1.7% from 809 m to 814 m1.6% from 814 m to 821 m1.6% from 821 m to 827 m1.5% from 827 m to 833 m3.0% from 833 m to 840 m1.5% from 840 m to 847 m-1.5% from 847 m to 854 m-7.2% from 854 m to 861 m-7.2% from 861 m to 867 m-5.5% from 867 m to 875 m-5.4% from 875 m to 882 m-6.2% from 882 m to 890 m-4.7% from 890 m to 899 m-5.3% from 899 m to 908 m-3.8% from 908 m to 919 m-2.8% from 919 m to 930 m-2.6% from 930 m to 941 m-2.6% from 941 m to 953 m-3.8% from 953 m to 963 m-3.2% from 963 m to 973 m-5.9% from 973 m to 981 m-5.8% from 981 m to 990 m-5.6% from 990 m to 999 m-4.4% from 999 m to 1.0 km-5.4% from 1.0 km to 1.0 km-4.3% from 1.0 km to 1.0 km-4.3% from 1.0 km to 1.0 km-2.1% from 1.0 km to 1.0 km-1.0% from 1.0 km to 1.1 km-2.0% from 1.1 km to 1.1 km-1.0% from 1.1 km to 1.1 km-1.0% from 1.1 km to 1.1 km-1.1% from 1.1 km to 1.1 km-1.0% from 1.1 km to 1.1 km-1.1% from 1.1 km to 1.1 km-2.2% from 1.1 km to 1.1 km-2.2% from 1.1 km to 1.1 km-3.3% from 1.1 km to 1.1 km-4.3% from 1.1 km to 1.1 km-4.3% from 1.1 km to 1.2 km-2.1% from 1.2 km to 1.2 km2.2% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km4.6% from 1.2 km to 1.2 km4.5% from 1.2 km to 1.2 km5.8% from 1.2 km to 1.2 km4.8% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km2.5% from 1.2 km to 1.3 km3.8% from 1.3 km to 1.3 km3.9% from 1.3 km to 1.3 km2.6% from 1.3 km to 1.3 km4.0% from 1.3 km to 1.3 km2.7% from 1.3 km to 1.3 km2.7% from 1.3 km to 1.3 km4.1% from 1.3 km to 1.3 km2.8% from 1.3 km to 1.3 km2.9% from 1.3 km to 1.3 km4.4% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km3.1% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.4 km2.9% from 1.4 km to 1.4 km1.4% from 1.4 km to 1.4 km1.4% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-2.9% from 1.4 km to 1.4 km-1.4% from 1.4 km to 1.4 km-2.8% from 1.4 km to 1.4 km-2.7% from 1.4 km to 1.4 km-1.3% from 1.4 km to 1.4 km-2.6% from 1.4 km to 1.4 km-1.2% from 1.4 km to 1.4 km-2.5% from 1.4 km to 1.4 km-1.2% from 1.4 km to 1.5 km-1.1% from 1.5 km to 1.5 km-2.2% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km-2.1% from 1.5 km to 1.5 km-1.0% from 1.5 km to 1.5 km-2.2% from 1.5 km to 1.5 km-2.2% from 1.5 km to 1.5 km-3.1% from 1.5 km to 1.5 km-3.1% from 1.5 km to 1.5 km-3.1% from 1.5 km to 1.6 km-3.1% from 1.6 km to 1.6 km-2.0% from 1.6 km to 1.6 km-1.0% from 1.6 km to 1.6 km-2.1% from 1.6 km to 1.6 km-1.0% from 1.6 km to 1.6 km-1.1% from 1.6 km to 1.6 km-1.1% from 1.6 km to 1.6 km-1.1% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km2.3% from 1.6 km to 1.7 km4.9% from 1.7 km to 1.7 km4.9% from 1.7 km to 1.7 km5.1% from 1.7 km to 1.7 km5.1% from 1.7 km to 1.7 km3.8% from 1.7 km to 1.7 km4.9% from 1.7 km to 1.7 km3.7% from 1.7 km to 1.7 km2.4% from 1.7 km to 1.7 km3.5% from 1.7 km to 1.7 km3.5% from 1.7 km to 1.7 km1.2% from 1.7 km to 1.7 km-5.7% from 1.7 km to 1.8 km3%1%5%-2%-0%1%0%0 m250 m500 m750 m1 km1.3 km1.5 km1.8 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.76 km / 1.09 miles
Elevation gain19.5 m / 64 ft
Average gradient1.1%
Maximum gradient6.6%
Elevation high431 m / 1,414 ft
Elevation low405.8 m / 1,331 ft
Climb difficulty score1,949.94

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
OSP Paris - Skrzyżowanie UP
Poraż, Sanok County
2.9 km1%29 m
poraż kościół-czaszyn nowa droga
Poraż, Sanok County
1.12 km2.3%33 m
na widoczek !
Poraż, Sanok County
0.5 km1.5%7 m
Poraż-szkoła
Poraż, Sanok County
0.89 km4.1%36 m
Poraż - Czaszyn UP
Poraż, Sanok County
0.7 km4.8%34 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,898,480th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 37,837th most difficult cycling climb of all 66,912 climbs in Poland.

📉

Places 3,455th out of 4,870 cycling climbs in Subcarpathian Voivodeship.

Ranks 253rd out of 329 cycling climbs in Sanok County.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 6 climbs) in Poraż.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb