Produkcyjna -> DK65

📍
Generała Franciszka Kleeberga, Fasty, Zawady, Białystok, Podlaskie Voivodeship, 15-689, Poland
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Produkcyjna -> DK65...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Produkcyjna -> DK65.

115 m120 m125 m130 m1.5% from 0 m to 7 m1.3% from 7 m to 15 m0.0% from 15 m to 20 m1.8% from 20 m to 26 m0.0% from 26 m to 31 m-1.5% from 31 m to 38 m0.0% from 38 m to 42 m-2.1% from 42 m to 47 m0.0% from 47 m to 52 m-2.3% from 52 m to 56 m0.0% from 56 m to 60 m-3.2% from 60 m to 63 m0.0% from 63 m to 68 m0.0% from 68 m to 72 m-1.9% from 72 m to 77 m0.0% from 77 m to 83 m0.0% from 83 m to 89 m0.0% from 89 m to 95 m0.0% from 95 m to 101 m0.0% from 101 m to 108 m0.0% from 108 m to 114 m0.0% from 114 m to 121 m0.0% from 121 m to 127 m0.0% from 127 m to 134 m1.5% from 134 m to 141 m0.0% from 141 m to 148 m1.4% from 148 m to 155 m0.0% from 155 m to 161 m1.4% from 161 m to 168 m2.9% from 168 m to 175 m1.4% from 175 m to 182 m2.9% from 182 m to 189 m2.9% from 189 m to 196 m1.3% from 196 m to 204 m1.6% from 204 m to 210 m3.1% from 210 m to 217 m1.4% from 217 m to 223 m1.6% from 223 m to 230 m1.5% from 230 m to 236 m3.3% from 236 m to 242 m1.6% from 242 m to 248 m3.4% from 248 m to 254 m1.7% from 254 m to 260 m1.9% from 260 m to 266 m1.9% from 266 m to 271 m3.4% from 271 m to 277 m1.6% from 277 m to 283 m1.7% from 283 m to 289 m1.7% from 289 m to 295 m1.9% from 295 m to 300 m2.0% from 300 m to 305 m2.0% from 305 m to 310 m2.6% from 310 m to 314 m2.3% from 314 m to 318 m2.9% from 318 m to 322 m2.2% from 322 m to 326 m2.2% from 326 m to 331 m2.8% from 331 m to 334 m3.8% from 334 m to 342 m2.7% from 342 m to 346 m5.9% from 346 m to 351 m0.0% from 351 m to 357 m0.0% from 357 m to 364 m2.6% from 364 m to 371 m1.8% from 371 m to 382 m0.0% from 382 m to 388 m1.6% from 388 m to 394 m1.5% from 394 m to 401 m1.6% from 401 m to 407 m0.0% from 407 m to 414 m1.8% from 414 m to 419 m1.8% from 419 m to 425 m0.0% from 425 m to 431 m1.6% from 431 m to 438 m1.8% from 438 m to 443 m1.9% from 443 m to 449 m3.8% from 449 m to 454 m3.7% from 454 m to 459 m3.8% from 459 m to 465 m3.5% from 465 m to 470 m6.8% from 470 m to 476 m5.5% from 476 m to 482 m5.5% from 482 m to 487 m2.9% from 487 m to 491 m4.8% from 491 m to 497 m2.3% from 497 m to 501 m2.0% from 501 m to 506 m0.0% from 506 m to 510 m1.6% from 510 m to 517 m0.0% from 517 m to 523 m0.0% from 523 m to 528 m0.0% from 528 m to 533 m-1.9% from 533 m to 538 m0.0% from 538 m to 543 m-2.0% from 543 m to 548 m-2.0% from 548 m to 553 m-1.8% from 553 m to 559 m-5.1% from 559 m to 563 m-3.9% from 563 m to 568 m-3.2% from 568 m to 574 m-3.8% from 574 m to 579 m-5.0% from 579 m to 585 m-4.8% from 585 m to 592 m-7.3% from 592 m to 597 m1.8% from 597 m to 603 m0.0% from 603 m to 609 m1.8% from 609 m to 615 m0.0% from 615 m to 620 m1.8% from 620 m to 626 m0.0% from 626 m to 631 m0.0% from 631 m to 636 m-1.8% from 636 m to 642 m0.0% from 642 m to 647 m-1.9% from 647 m to 653 m0.0% from 653 m to 657 m-2.0% from 657 m to 662 m-2.2% from 662 m to 667 m-4.5% from 667 m to 671 m-2.1% from 671 m to 676 m0.0% from 676 m to 680 m-3.4% from 680 m to 686 m-1.9% from 686 m to 697 m-3.0% from 697 m to 703 m-3.0% from 703 m to 710 m-8.1% from 710 m to 716 m0.0% from 716 m to 723 m0.0% from 723 m to 729 m0.0% from 729 m to 735 m1.5% from 735 m to 742 m1.7% from 742 m to 748 m1.6% from 748 m to 754 m3.0% from 754 m to 761 m3.2% from 761 m to 767 m1.8% from 767 m to 773 m0.0% from 773 m to 778 m0.0% from 778 m to 784 m1.7% from 784 m to 789 m0.0% from 789 m to 796 m3.3% from 796 m to 802 m1.7% from 802 m to 808 m3.3% from 808 m to 814 m3.2% from 814 m to 820 m3.5% from 820 m to 825 m3.7% from 825 m to 831 m4.1% from 831 m to 836 m1.9% from 836 m to 841 m3.3% from 841 m to 847 m3.4% from 847 m to 853 m0.0% from 853 m to 859 m1.6% from 859 m to 865 m0.0% from 865 m to 872 m0.0% from 872 m to 878 m0.0% from 878 m to 884 m-1.7% from 884 m to 889 m-1.7% from 889 m to 895 m-1.8% from 895 m to 901 m-3.3% from 901 m to 907 m-3.4% from 907 m to 913 m-4.6% from 913 m to 919 m-3.2% from 919 m to 926 m-5.1% from 926 m to 931 m-3.6% from 931 m to 937 m-1.7% from 937 m to 943 m-1.6% from 943 m to 949 m0.0% from 949 m to 955 m-1.8% from 955 m to 960 m0.0% from 960 m to 967 m0.0% from 967 m to 972 m0.0% from 972 m to 978 m0.0% from 978 m to 983 m0.0% from 983 m to 989 m0.0% from 989 m to 994 m0.0% from 994 m to 1000 m0.0% from 1000 m to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km3.7% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.2 km3.8% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km2.9% from 1.3 km to 1.3 km2.5% from 1.3 km to 1.3 km2.6% from 1.3 km to 1.3 km2.6% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km1%2%-1%0%0%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.31 km / 0.81 miles
Elevation gain6.8 m / 22 ft
Average gradient0.5%
Maximum gradient5.4%
Elevation high127 m / 417 ft
Elevation low118.7 m / 389 ft
Climb difficulty score680.68

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
GSzR Challenge part II
Zawady, Białystok
1.13 km0.6%7 m
Anton sekcja 2
Zawady, Białystok
1.22 km1%12 m
Andersa uphill od strony zawad
Zawady, Białystok
1.64 km1%16 m
Kleeberg triple bridge uphills !
Zawady, Białystok
1.36 km1.4%19 m
Prosto przez las
Zawady, Białystok
2.37 km0.7%16 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,545,330th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 61,088th most difficult cycling climb of all 66,912 climbs in Poland.

📉

Places 1,561st out of 1,760 cycling climbs in Podlaskie Voivodeship.

Ranks 89th out of 110 cycling climbs in Białystok.

Ranking 13th out of 15 cycling climbs in Zawady.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb