Cały podjazd lasem pod Telegraf

📍
Aleja Księdza Jerzego Popiełuszki, Kawetczyzna, Barwinek, Kielce, Holy Cross Voivodeship, 25-109, Poland

Estimated Climb Time

Loading your rider settings for Cały podjazd lasem pod Telegraf...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Cały podjazd lasem pod Telegraf.

315 m345 m370 m400 m0.0% from 0 m to 7 m0.0% from 7 m to 12 m0.0% from 12 m to 15 m2.9% from 15 m to 19 m11.6% from 19 m to 23 m9.3% from 23 m to 28 m6.3% from 28 m to 35 m6.2% from 35 m to 38 m4.8% from 38 m to 44 m8.1% from 44 m to 48 m4.7% from 48 m to 52 m5.7% from 52 m to 58 m5.1% from 58 m to 61 m6.7% from 61 m to 67 m10.2% from 67 m to 73 m14.3% from 73 m to 79 m18.2% from 79 m to 83 m19.2% from 83 m to 89 m18.9% from 89 m to 96 m6.3% from 96 m to 101 m4.1% from 101 m to 106 m3.2% from 106 m to 109 m4.8% from 109 m to 113 m5.3% from 113 m to 119 m3.0% from 119 m to 122 m5.9% from 122 m to 125 m2.6% from 125 m to 129 m5.1% from 129 m to 133 m5.6% from 133 m to 138 m6.3% from 138 m to 142 m4.4% from 142 m to 146 m5.8% from 146 m to 151 m4.8% from 151 m to 156 m4.4% from 156 m to 160 m6.4% from 160 m to 165 m4.7% from 165 m to 169 m5.1% from 169 m to 173 m3.6% from 173 m to 179 m4.6% from 179 m to 185 m5.4% from 185 m to 191 m5.6% from 191 m to 194 m5.0% from 194 m to 198 m11.9% from 198 m to 202 m22.5% from 202 m to 206 m24.5% from 206 m to 211 m22.5% from 211 m to 215 m24.2% from 215 m to 219 m23.8% from 219 m to 223 m22.6% from 223 m to 226 m22.5% from 226 m to 230 m25.0% from 230 m to 234 m21.9% from 234 m to 237 m25.0% from 237 m to 243 m23.9% from 243 m to 247 m22.0% from 247 m to 251 m22.6% from 251 m to 255 m24.3% from 255 m to 258 m24.4% from 258 m to 262 m22.6% from 262 m to 265 m23.3% from 265 m to 268 m0.0% from 268 m to 273 m0.0% from 273 m to 277 m0.0% from 277 m to 280 m0.0% from 280 m to 285 m1.8% from 285 m to 291 m4.9% from 291 m to 295 m2.3% from 295 m to 299 m2.1% from 299 m to 304 m2.8% from 304 m to 308 m2.5% from 308 m to 312 m0.0% from 312 m to 315 m0.0% from 315 m to 320 m2.1% from 320 m to 324 m0.0% from 324 m to 329 m0.0% from 329 m to 333 m0.0% from 333 m to 337 m0.0% from 337 m to 341 m0.0% from 341 m to 345 m-2.3% from 345 m to 349 m21.1% from 349 m to 353 m13.5% from 353 m to 357 m17.0% from 357 m to 362 m16.7% from 362 m to 365 m18.0% from 365 m to 370 m13.5% from 370 m to 374 m13.3% from 374 m to 377 m14.3% from 377 m to 381 m14.3% from 381 m to 385 m9.3% from 385 m to 389 m11.1% from 389 m to 393 m9.6% from 393 m to 399 m12.2% from 399 m to 403 m57.1% from 403 m to 407 m44.4% from 407 m to 411 m9.8% from 411 m to 416 m8.9% from 416 m to 420 m8.8% from 420 m to 424 m9.1% from 424 m to 429 m8.3% from 429 m to 434 m9.8% from 434 m to 439 m9.1% from 439 m to 442 m6.5% from 442 m to 445 m10.5% from 445 m to 449 m8.5% from 449 m to 454 m9.4% from 454 m to 457 m9.4% from 457 m to 460 m6.5% from 460 m to 463 m11.1% from 463 m to 469 m9.4% from 469 m to 472 m9.1% from 472 m to 477 m10.8% from 477 m to 481 m8.9% from 481 m to 486 m7.9% from 486 m to 489 m8.8% from 489 m to 493 m10.9% from 493 m to 497 m9.7% from 497 m to 501 m8.9% from 501 m to 506 m8.3% from 506 m to 510 m10.0% from 510 m to 516 m9.3% from 516 m to 520 m7.3% from 520 m to 524 m8.6% from 524 m to 530 m8.8% from 530 m to 533 m10.3% from 533 m to 537 m8.1% from 537 m to 541 m8.6% from 541 m to 544 m9.7% from 544 m to 551 m7.3% from 551 m to 555 m9.4% from 555 m to 558 m8.9% from 558 m to 562 m6.7% from 562 m to 565 m9.7% from 565 m to 569 m7.3% from 569 m to 574 m9.3% from 574 m to 578 m11.9% from 578 m to 583 m15.6% from 583 m to 586 m-11.1% from 586 m to 590 m28.3% from 590 m to 595 m-16.7% from 595 m to 598 m2.6% from 598 m to 602 m-10.0% from 602 m to 606 m15.6% from 606 m to 610 m14.3% from 610 m to 614 m-6.3% from 614 m to 619 m-6.0% from 619 m to 624 m35.4% from 624 m to 628 m12.5% from 628 m to 633 m-13.2% from 633 m to 637 m11.6% from 637 m to 641 m15.6% from 641 m to 644 m-16.2% from 644 m to 648 m7.4% from 648 m to 654 m11.1% from 654 m to 657 m8.8% from 657 m to 661 m-16.2% from 661 m to 664 m4.0% from 664 m to 669 m2.1% from 669 m to 674 m3.6% from 674 m to 680 m4.3% from 680 m to 684 m0.0% from 684 m to 689 m12.1% from 689 m to 695 m-3.3% from 695 m to 701 m-12.2% from 701 m to 705 m-2.3% from 705 m to 709 m-11.4% from 709 m to 714 m-4.7% from 714 m to 720 m-5.7% from 720 m to 724 m-6.5% from 724 m to 730 m-3.1% from 730 m to 733 m-2.6% from 733 m to 737 m0.0% from 737 m to 741 m0.0% from 741 m to 744 m0.0% from 744 m to 749 m-2.0% from 749 m to 754 m0.0% from 754 m to 757 m2.1% from 757 m to 762 m0.0% from 762 m to 768 m2.0% from 768 m to 773 m2.1% from 773 m to 778 m0.0% from 778 m to 784 m1.8% from 784 m to 790 m1.5% from 790 m to 796 m0.0% from 796 m to 801 m1.9% from 801 m to 806 m2.0% from 806 m to 811 m0.0% from 811 m to 814 m6.6% from 814 m to 820 m4.9% from 820 m to 826 m5.2% from 826 m to 832 m4.4% from 832 m to 837 m5.9% from 837 m to 842 m5.9% from 842 m to 847 m5.9% from 847 m to 854 m5.4% from 854 m to 859 m3.9% from 859 m to 864 m5.2% from 864 m to 870 m4.8% from 870 m to 876 m5.7% from 876 m to 882 m4.7% from 882 m to 888 m4.8% from 888 m to 892 m4.4% from 892 m to 897 m7.3% from 897 m to 901 m5.4% from 901 m to 905 m5.1% from 905 m to 909 m5.0% from 909 m to 913 m5.0% from 913 m to 917 m6.8% from 917 m to 924 m6.1% from 924 m to 927 m6.3% from 927 m to 934 m5.8% from 934 m to 940 m6.3% from 940 m to 945 m6.4% from 945 m to 950 m7.0% from 950 m to 954 m6.7% from 954 m to 959 m8.1% from 959 m to 962 m4.7% from 962 m to 967 m6.1% from 967 m to 970 m7.1% from 970 m to 974 m6.5% from 974 m to 979 m7.7% from 979 m to 983 m6.7% from 983 m to 989 m7.0% from 989 m to 993 m5.6% from 993 m to 997 m6.1% from 997 m to 1000 m7.1% from 1000 m to 1.0 km5.6% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km7.1% from 1.0 km to 1.0 km6.7% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km6.5% from 1.0 km to 1.0 km8.9% from 1.0 km to 1.0 km7.4% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km8.2% from 1.0 km to 1.1 km9.4% from 1.1 km to 1.1 km8.9% from 1.1 km to 1.1 km7.7% from 1.1 km to 1.1 km11.4% from 1.1 km to 1.1 km8.8% from 1.1 km to 1.1 km12.9% from 1.1 km to 1.1 km10.5% from 1.1 km to 1.1 km12.3% from 1.1 km to 1.1 km9.4% from 1.1 km to 1.1 km11.9% from 1.1 km to 1.1 km10.4% from 1.1 km to 1.1 km11.9% from 1.1 km to 1.1 km8.2% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km10%10%4%5%7%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.14 km / 0.71 miles
Elevation gain81.3 m / 267 ft
Average gradient7.1%
Maximum gradient29.4%
Elevation high399.3 m / 1,310 ft
Elevation low318 m / 1,043 ft
Climb difficulty score8,133.9

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
do wyciągu
Barwinek, Kielce
1.07 km7.2%77 m
Telegraf - las od Popiełuszki
Barwinek, Kielce
1.13 km8.6%97 m
Telegraf podjazd od rozjazdu do stoku
Barwinek, Kielce
0.99 km8.2%81 m
Telegraf pod wyciąg
Barwinek, Kielce
0.99 km8.4%85 m
segment dla RiC :-)
Barwinek, Kielce
1.41 km6.7%109 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 742,588th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 10,191st most difficult cycling climb of all 66,912 climbs in Poland.

📉

Places 273rd out of 2,915 cycling climbs in Holy Cross Voivodeship.

Ranks 26th out of 432 cycling climbs in Kielce.

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 23 climbs) in Barwinek.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb