Kraftledningsveien 2 Climb

📍
Kraftledningsveien, Krosso, Dalen, Rjukan, Tinn, Vestfold og Telemark, Norway
Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Kraftledningsveien 2 Climb.

385 m425 m460 m500 m18.2% from 0 m to 3 m31.6% from 3 m to 7 m34.8% from 7 m to 12 m38.3% from 12 m to 18 m38.6% from 18 m to 22 m3.2% from 22 m to 25 m6.1% from 25 m to 29 m16.2% from 29 m to 32 m17.4% from 32 m to 37 m14.0% from 37 m to 42 m14.0% from 42 m to 46 m-12.7% from 46 m to 52 m-14.0% from 52 m to 57 m-6.5% from 57 m to 62 m13.2% from 62 m to 66 m0.0% from 66 m to 69 m-17.6% from 69 m to 72 m-6.8% from 72 m to 80 m12.3% from 80 m to 87 m18.9% from 87 m to 92 m23.8% from 92 m to 96 m36.4% from 96 m to 100 m40.0% from 100 m to 103 m36.4% from 103 m to 108 m21.3% from 108 m to 112 m16.7% from 112 m to 116 m-12.5% from 116 m to 121 m-20.5% from 121 m to 125 m5.4% from 125 m to 129 m28.1% from 129 m to 132 m-3.0% from 132 m to 135 m22.9% from 135 m to 139 m31.3% from 139 m to 142 m18.8% from 142 m to 145 m27.3% from 145 m to 148 m34.6% from 148 m to 154 m15.7% from 154 m to 159 m7.1% from 159 m to 164 m8.8% from 164 m to 171 m4.0% from 171 m to 179 m15.0% from 179 m to 185 m35.5% from 185 m to 191 m22.7% from 191 m to 197 m17.5% from 197 m to 203 m22.7% from 203 m to 208 m27.3% from 208 m to 211 m40.5% from 211 m to 215 m14.5% from 215 m to 221 m14.8% from 221 m to 227 m-5.4% from 227 m to 230 m-28.1% from 230 m to 234 m-10.3% from 234 m to 237 m-9.7% from 237 m to 241 m4.3% from 241 m to 245 m3.8% from 245 m to 250 m11.8% from 250 m to 254 m33.3% from 254 m to 257 m-35.9% from 257 m to 261 m11.1% from 261 m to 264 m2.7% from 264 m to 268 m-32.0% from 268 m to 273 m40.8% from 273 m to 278 m38.9% from 278 m to 282 m41.0% from 282 m to 285 m23.3% from 285 m to 288 m39.5% from 288 m to 292 m32.4% from 292 m to 296 m-40.5% from 296 m to 300 m-34.6% from 300 m to 307 m42.1% from 307 m to 311 m40.6% from 311 m to 322 m40.0% from 322 m to 328 m-2.9% from 328 m to 335 m3.8% from 335 m to 341 m-14.0% from 341 m to 350 m-15.9% from 350 m to 358 m-12.9% from 358 m to 364 m2.3% from 364 m to 369 m-2.2% from 369 m to 373 m-8.7% from 373 m to 378 m-17.6% from 378 m to 385 m-11.8% from 385 m to 392 m4.7% from 392 m to 397 m37.7% from 397 m to 402 m43.5% from 402 m to 411 m42.3% from 411 m to 418 m0.0% from 418 m to 421 m-2.3% from 421 m to 426 m-15.3% from 426 m to 433 m-12.0% from 433 m to 440 m-10.3% from 440 m to 448 m-9.1% from 448 m to 455 m12.2% from 455 m to 460 m32.6% from 460 m to 464 m37.0% from 464 m to 470 m30.2% from 470 m to 474 m17.1% from 474 m to 478 m27.3% from 478 m to 481 m34.4% from 481 m to 484 m40.6% from 484 m to 491 m42.9% from 491 m to 497 m45.2% from 497 m to 501 m-24.4% from 501 m to 506 m-34.7% from 506 m to 511 m-13.0% from 511 m to 515 m-14.3% from 515 m to 519 m7.7% from 519 m to 523 m25.0% from 523 m to 529 m17.2% from 529 m to 535 m18.3% from 535 m to 541 m18.2% from 541 m to 545 m19.6% from 545 m to 550 m-4.2% from 550 m to 554 m-15.1% from 554 m to 560 m-3.5% from 560 m to 565 m-6.8% from 565 m to 570 m-2.6% from 570 m to 574 m13.5% from 574 m to 577 m-15.4% from 577 m to 581 m-45.7% from 581 m to 585 m19.4% from 585 m to 588 m42.4% from 588 m to 591 m3.2% from 591 m to 594 m3.0% from 594 m to 598 m-23.1% from 598 m to 602 m3.1% from 602 m to 605 m-33.3% from 605 m to 608 m-48.5% from 608 m to 611 m23.1% from 611 m to 615 m37.1% from 615 m to 619 m-42.9% from 619 m to 622 m-9.1% from 622 m to 626 m-44.1% from 626 m to 629 m35.3% from 629 m to 632 m45.2% from 632 m to 635 m-29.0% from 635 m to 639 m-46.2% from 639 m to 642 m-42.4% from 642 m to 646 m48.6% from 646 m to 649 m32.4% from 649 m to 653 m36.1% from 653 m to 657 m18.8% from 657 m to 660 m-32.0% from 660 m to 665 m-22.6% from 665 m to 668 m-29.0% from 668 m to 674 m46.9% from 674 m to 677 m48.4% from 677 m to 684 m45.5% from 684 m to 687 m-48.5% from 687 m to 690 m-43.8% from 690 m to 693 m-46.7% from 693 m to 696 m-14.7% from 696 m to 700 m25.6% from 700 m to 704 m12.3% from 704 m to 710 m2.9% from 710 m to 714 m34.3% from 714 m to 717 m25.6% from 717 m to 721 m18.8% from 721 m to 725 m16.2% from 725 m to 728 m-2.2% from 728 m to 733 m15.1% from 733 m to 738 m26.7% from 738 m to 744 m33.7% from 744 m to 753 m28.3% from 753 m to 758 m44.4% from 758 m to 763 m18.7% from 763 m to 768 m11.3% from 768 m to 775 m20.0% from 775 m to 781 m28.6% from 781 m to 786 m39.6% from 786 m to 791 m27.7% from 791 m to 797 m18.7% from 797 m to 802 m0.0% from 802 m to 806 m5.4% from 806 m to 812 m6.4% from 812 m to 817 m-25.7% from 817 m to 820 m-22.5% from 820 m to 824 m15.8% from 824 m to 828 m5.1% from 828 m to 832 m-2.0% from 832 m to 837 m0.0% from 837 m to 844 m5.0% from 844 m to 850 m35.9% from 850 m to 854 m47.3% from 854 m to 861 m40.4% from 861 m to 867 m18.4% from 867 m to 872 m5.5% from 872 m to 878 m13.0% from 878 m to 883 m-2.4% from 883 m to 887 m-5.1% from 887 m to 891 m0.0% from 891 m to 896 m23.7% from 896 m to 900 m31.6% from 900 m to 904 m22.9% from 904 m to 908 m-15.0% from 908 m to 914 m-9.3% from 914 m to 922 m8.9% from 922 m to 926 m48.6% from 926 m to 930 m5.3% from 930 m to 936 m0.0% from 936 m to 943 m4.3% from 943 m to 950 m8.7% from 950 m to 954 m-20.0% from 954 m to 958 m-7.0% from 958 m to 962 m16.3% from 962 m to 967 m-2.5% from 967 m to 971 m-8.3% from 971 m to 976 m8.5% from 976 m to 981 m-20.9% from 981 m to 985 m14.6% from 985 m to 989 m30.6% from 989 m to 995 m25.5% from 995 m to 1.0 km27.3% from 1.0 km to 1.0 km28.6% from 1.0 km to 1.0 km45.2% from 1.0 km to 1.0 km35.4% from 1.0 km to 1.0 km25.4% from 1.0 km to 1.0 km5.6% from 1.0 km to 1.0 km6.8% from 1.0 km to 1.0 km-12.1% from 1.0 km to 1.0 km7.8% from 1.0 km to 1.0 km34.1% from 1.0 km to 1.1 km50.0% from 1.1 km to 1.1 km20.7% from 1.1 km to 1.1 km22.2% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-5.5% from 1.1 km to 1.1 km-21.1% from 1.1 km to 1.1 km-11.5% from 1.1 km to 1.1 km-29.1% from 1.1 km to 1.1 km-11.1% from 1.1 km to 1.1 km48.8% from 1.1 km to 1.1 km32.7% from 1.1 km to 1.1 km13%10%3%12%13%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.11 km / 0.69 miles
Elevation gain109.4 m / 359 ft
Average gradient9.9%
Maximum gradient41.7%
Elevation high499.14 m / 1,638 ft
Elevation low389.16 m / 1,277 ft
Climb difficulty score10,935.96

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Kraftledningsveien 6 Climb
Tinn, Rjukan
0.89 km11.9%105 m
Bruflot 18 Climb
Tinn, Rjukan
1.41 km10.3%145 m
Svineroi (Zombie Hill) - First Climb ™
Tinn, Rjukan
1.51 km10%150 m
Gjøystdalvegen Climb
Tinn, Rjukan
1.56 km6.2%97 m
Kraftledningsveien Climb
Tinn, Rjukan
1.85 km4.4%82 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 510,539th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 6,475th most difficult cycling climb of all 33,041 climbs in Norway.

📉

Places 318th out of 1,799 cycling climbs in Vestfold og Telemark.

Ranks 13th out of 23 cycling climbs in Rjukan.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 16 climbs) in Tinn.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb