Vestlia- Hovdehytta

📍
Vesle Sollibonn, Solliveien, Solli gård, Solli, Asker, Akershus, 3420, Norway
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Vestlia- Hovdehytta...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Vestlia- Hovdehytta.

435 m450 m470 m485 m-25.4% from 0 m to 7 m-10.3% from 7 m to 19 m-8.8% from 19 m to 30 m-13.8% from 30 m to 33 m0.0% from 33 m to 43 m0.0% from 43 m to 47 m4.2% from 47 m to 61 m-2.4% from 61 m to 69 m0.0% from 69 m to 77 m-3.7% from 77 m to 94 m-14.1% from 94 m to 101 m-25.8% from 101 m to 104 m-13.8% from 104 m to 107 m-15.4% from 107 m to 117 m-22.2% from 117 m to 121 m-19.4% from 121 m to 124 m-13.3% from 124 m to 130 m-5.7% from 130 m to 133 m-7.5% from 133 m to 144 m-11.1% from 144 m to 148 m0.0% from 148 m to 148 m-37.5% from 148 m to 150 m0.0% from 150 m to 154 m39.0% from 154 m to 158 m0.0% from 158 m to 161 m3.6% from 161 m to 167 m3.9% from 167 m to 172 m1.5% from 172 m to 186 m0.0% from 186 m to 189 m11.4% from 189 m to 192 m13.8% from 192 m to 195 m6.7% from 195 m to 198 m2.9% from 198 m to 205 m7.1% from 205 m to 208 m1.8% from 208 m to 219 m5.0% from 219 m to 227 m6.0% from 227 m to 240 m-1.6% from 240 m to 252 m-2.0% from 252 m to 263 m-22.2% from 263 m to 269 m7.5% from 269 m to 274 m5.3% from 274 m to 286 m3.4% from 286 m to 291 m12.5% from 291 m to 293 m7.6% from 293 m to 303 m5.2% from 303 m to 311 m5.7% from 311 m to 318 m-3.7% from 318 m to 329 m0.0% from 329 m to 331 m5.9% from 331 m to 335 m15.7% from 335 m to 340 m16.7% from 340 m to 342 m28.6% from 342 m to 344 m31.6% from 344 m to 346 m31.6% from 346 m to 348 m10.0% from 348 m to 352 m22.2% from 352 m to 354 m7.5% from 354 m to 362 m18.2% from 362 m to 364 m24.0% from 364 m to 369 m28.6% from 369 m to 372 m6.1% from 372 m to 375 m28.0% from 375 m to 380 m42.9% from 380 m to 383 m37.0% from 383 m to 386 m34.8% from 386 m to 388 m25.0% from 388 m to 390 m17.9% from 390 m to 395 m5.3% from 395 m to 399 m10.2% from 399 m to 405 m10.8% from 405 m to 409 m8.7% from 409 m to 411 m10.0% from 411 m to 413 m13.8% from 413 m to 419 m9.8% from 419 m to 423 m12.0% from 423 m to 428 m7.5% from 428 m to 433 m16.4% from 433 m to 440 m14.0% from 440 m to 445 m0.0% from 445 m to 450 m5.4% from 450 m to 457 m17.4% from 457 m to 460 m15.9% from 460 m to 466 m11.8% from 466 m to 468 m15.2% from 468 m to 474 m14.0% from 474 m to 480 m21.1% from 480 m to 482 m18.2% from 482 m to 484 m18.2% from 484 m to 486 m8.5% from 486 m to 491 m-2.5% from 491 m to 499 m5.0% from 499 m to 503 m33.3% from 503 m to 504 m9.7% from 504 m to 510 m0.0% from 510 m to 513 m15.8% from 513 m to 516 m28.6% from 516 m to 517 m7.1% from 517 m to 526 m12.5% from 526 m to 527 m23.5% from 527 m to 529 m27.6% from 529 m to 532 m19.4% from 532 m to 535 m6.8% from 535 m to 541 m0.0% from 541 m to 542 m7.5% from 542 m to 547 m5.4% from 547 m to 551 m8.7% from 551 m to 553 m7.5% from 553 m to 564 m22.2% from 564 m to 568 m10.8% from 568 m to 571 m9.5% from 571 m to 576 m1.6% from 576 m to 588 m0.0% from 588 m to 601 m14.5% from 601 m to 606 m30.0% from 606 m to 608 m16.0% from 608 m to 611 m-5.1% from 611 m to 619 m-18.2% from 619 m to 626 m-6.9% from 626 m to 632 m0.0% from 632 m to 633 m13.3% from 633 m to 635 m6.7% from 635 m to 644 m10.0% from 644 m to 650 m11.1% from 650 m to 652 m0.0% from 652 m to 653 m1.8% from 653 m to 664 m0.0% from 664 m to 667 m4.9% from 667 m to 675 m1.2% from 675 m to 692 m-7.1% from 692 m to 706 m-4.5% from 706 m to 719 m-12.9% from 719 m to 722 m6.6% from 722 m to 731 m23.5% from 731 m to 735 m11.8% from 735 m to 736 m10.5% from 736 m to 740 m9.1% from 740 m to 745 m10.5% from 745 m to 746 m5.4% from 746 m to 754 m0.0% from 754 m to 756 m11.9% from 756 m to 765 m13.2% from 765 m to 774 m1.3% from 774 m to 789 m-6.7% from 789 m to 792 m-2.8% from 792 m to 799 m-7.1% from 799 m to 808 m-10.8% from 808 m to 812 m-15.8% from 812 m to 815 m-6.2% from 815 m to 825 m7.1% from 825 m to 834 m0.0% from 834 m to 837 m-1.7% from 837 m to 848 m0.0% from 848 m to 851 m-23.8% from 851 m to 855 m-33.3% from 855 m to 856 m-13.3% from 856 m to 858 m-22.2% from 858 m to 860 m-20.0% from 860 m to 861 m-200.0% from 861 m to 862 m-90.9% from 862 m to 863 m0.0% from 863 m to 875 m0.0% from 875 m to 883 m0.0% from 883 m to 890 m-16.2% from 890 m to 897 m-7.4% from 897 m to 900 m-33.3% from 900 m to 902 m-6.1% from 902 m to 912 m-2.5% from 912 m to 928 m-4.5% from 928 m to 941 m-5.6% from 941 m to 945 m-2.6% from 945 m to 960 m-12.0% from 960 m to 970 m5.1% from 970 m to 982 m-2.0% from 982 m to 992 m-5.8% from 992 m to 1.0 km0.0% from 1.0 km to 1.0 km-10.0% from 1.0 km to 1.0 km11.2% from 1.0 km to 1.0 km8.8% from 1.0 km to 1.0 km25.0% from 1.0 km to 1.0 km11.5% from 1.0 km to 1.0 km10.8% from 1.0 km to 1.1 km19.0% from 1.1 km to 1.1 km4.0% from 1.1 km to 1.1 km5.9% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km-6.3% from 1.1 km to 1.1 km-6.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km5.7% from 1.1 km to 1.2 km1.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km13.8% from 1.2 km to 1.2 km9.8% from 1.2 km to 1.2 km15.4% from 1.2 km to 1.2 km4.9% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km7.0% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-21.4% from 1.2 km to 1.2 km-34.0% from 1.2 km to 1.2 km-8.4% from 1.2 km to 1.3 km-3.9% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km15.9% from 1.3 km to 1.3 km10.8% from 1.3 km to 1.3 km-18.2% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-200.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-100.0% from 1.3 km to 1.3 km200.0% from 1.3 km to 1.3 km-200.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km22.2% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-5.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-6.9% from 1.3 km to 1.4 km-3%10%4%-4%2%-1%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.35 km / 0.84 miles
Elevation gain22.8 m / 75 ft
Average gradient1.7%
Maximum gradient34.4%
Elevation high481 m / 1,578 ft
Elevation low437.6 m / 1,436 ft
Climb difficulty score2,283.7

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Kneika mot myggheim
Solli, Asker
0.46 km4.4%20 m
Solli P - Grinda inn i maka
Solli, Asker
0.82 km8.8%72 m
Solli, parkering til gården (grusvei)
Solli, Asker
0.44 km10.5%46 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,768,649th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 23,247th most difficult cycling climb of all 33,041 climbs in Norway.

📉

Places 1,334th out of 1,951 cycling climbs in Akershus.

Ranks 373rd out of 529 cycling climbs in Asker.

🥉

This is the third most difficult cycling climb in Solli.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb