Bukit Kledang Start Climbing

📍
Jalan Kledang, Taman Sepakat, Ipoh, Kinta, Perak, Malaysia

Estimated Climb Time

Loading your rider settings for Bukit Kledang Start Climbing...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Bukit Kledang Start Climbing.

110 m150 m190 m230 m42.6% from 0 m to 5 m49.0% from 5 m to 10 m49.6% from 10 m to 22 m41.5% from 22 m to 26 m-11.5% from 26 m to 31 m-3.7% from 31 m to 36 m-16.3% from 36 m to 41 m-46.3% from 41 m to 47 m35.3% from 47 m to 54 m-44.1% from 54 m to 58 m-48.4% from 58 m to 61 m-14.3% from 61 m to 64 m-3.2% from 64 m to 70 m8.3% from 70 m to 74 m-6.5% from 74 m to 77 m12.2% from 77 m to 81 m-22.7% from 81 m to 88 m-4.3% from 88 m to 93 m0.0% from 93 m to 96 m22.2% from 96 m to 123 m31.7% from 123 m to 127 m21.6% from 127 m to 131 m15.8% from 131 m to 135 m25.0% from 135 m to 140 m30.5% from 140 m to 148 m15.9% from 148 m to 152 m40.9% from 152 m to 157 m47.6% from 157 m to 171 m-52.9% from 171 m to 175 m14.9% from 175 m to 179 m41.4% from 179 m to 186 m-18.3% from 186 m to 194 m-5.3% from 194 m to 197 m30.8% from 197 m to 204 m-31.1% from 204 m to 208 m-29.2% from 208 m to 213 m-16.4% from 213 m to 219 m-15.1% from 219 m to 224 m-31.1% from 224 m to 233 m1.1% from 233 m to 242 m37.0% from 242 m to 247 m29.3% from 247 m to 257 m18.2% from 257 m to 263 m11.6% from 263 m to 267 m-37.9% from 267 m to 273 m-19.4% from 273 m to 277 m37.7% from 277 m to 282 m-5.8% from 282 m to 287 m-12.1% from 287 m to 290 m4.2% from 290 m to 298 m40.4% from 298 m to 303 m-4.8% from 303 m to 312 m43.4% from 312 m to 317 m42.3% from 317 m to 322 m-2.9% from 322 m to 326 m21.3% from 326 m to 332 m-12.2% from 332 m to 337 m26.0% from 337 m to 344 m-38.7% from 344 m to 347 m34.2% from 347 m to 354 m-41.0% from 354 m to 358 m-45.5% from 358 m to 364 m-35.9% from 364 m to 370 m24.3% from 370 m to 374 m-44.4% from 374 m to 382 m-42.4% from 382 m to 388 m21.2% from 388 m to 392 m-9.5% from 392 m to 398 m26.4% from 398 m to 403 m1.2% from 403 m to 412 m37.2% from 412 m to 416 m-45.5% from 416 m to 419 m-40.6% from 419 m to 422 m-43.2% from 422 m to 426 m-25.0% from 426 m to 431 m-12.2% from 431 m to 436 m-5.2% from 436 m to 442 m-2.4% from 442 m to 446 m-37.2% from 446 m to 450 m8.5% from 450 m to 455 m-41.5% from 455 m to 460 m-11.5% from 460 m to 465 m10.2% from 465 m to 470 m-21.1% from 470 m to 474 m-37.8% from 474 m to 478 m35.5% from 478 m to 481 m38.8% from 481 m to 489 m-32.1% from 489 m to 498 m40.0% from 498 m to 502 m7.9% from 502 m to 506 m42.7% from 506 m to 516 m44.3% from 516 m to 524 m51.6% from 524 m to 527 m-9.8% from 527 m to 531 m11.0% from 531 m to 539 m17.8% from 539 m to 543 m-35.9% from 543 m to 547 m-5.8% from 547 m to 554 m23.3% from 554 m to 561 m41.4% from 561 m to 568 m41.8% from 568 m to 574 m24.0% from 574 m to 579 m43.6% from 579 m to 583 m44.6% from 583 m to 588 m12.1% from 588 m to 595 m-26.5% from 595 m to 598 m-6.1% from 598 m to 602 m5.9% from 602 m to 607 m47.1% from 607 m to 610 m32.4% from 610 m to 614 m33.3% from 614 m to 617 m46.7% from 617 m to 622 m3.0% from 622 m to 628 m38.9% from 628 m to 632 m20.0% from 632 m to 635 m39.7% from 635 m to 642 m33.3% from 642 m to 647 m29.0% from 647 m to 650 m26.7% from 650 m to 655 m35.9% from 655 m to 659 m28.1% from 659 m to 665 m44.4% from 665 m to 668 m42.4% from 668 m to 671 m46.8% from 671 m to 676 m26.7% from 676 m to 679 m37.1% from 679 m to 683 m37.1% from 683 m to 689 m43.3% from 689 m to 692 m45.5% from 692 m to 697 m46.5% from 697 m to 702 m5.4% from 702 m to 705 m44.6% from 705 m to 715 m37.2% from 715 m to 719 m12.2% from 719 m to 723 m41.2% from 723 m to 726 m42.9% from 726 m to 731 m4.2% from 731 m to 736 m25.7% from 736 m to 740 m16.7% from 740 m to 744 m19.4% from 744 m to 748 m32.4% from 748 m to 752 m29.0% from 752 m to 755 m8.2% from 755 m to 760 m31.2% from 760 m to 763 m24.6% from 763 m to 769 m36.8% from 769 m to 773 m33.3% from 773 m to 778 m27.1% from 778 m to 784 m8.9% from 784 m to 789 m-3.8% from 789 m to 794 m-5.7% from 794 m to 799 m-37.8% from 799 m to 804 m-32.6% from 804 m to 808 m-33.9% from 808 m to 814 m-30.6% from 814 m to 819 m-28.3% from 819 m to 824 m-16.1% from 824 m to 827 m3.6% from 827 m to 841 m-35.5% from 841 m to 844 m-35.6% from 844 m to 848 m-36.1% from 848 m to 852 m-25.6% from 852 m to 856 m-7.3% from 856 m to 860 m-29.7% from 860 m to 864 m-33.3% from 864 m to 867 m-33.3% from 867 m to 871 m-12.7% from 871 m to 876 m-9.1% from 876 m to 881 m-35.7% from 881 m to 885 m-22.4% from 885 m to 891 m20.0% from 891 m to 895 m-32.1% from 895 m to 900 m-7.0% from 900 m to 906 m-8.3% from 906 m to 911 m-14.3% from 911 m to 916 m-27.9% from 916 m to 920 m-28.6% from 920 m to 924 m-27.0% from 924 m to 928 m-24.4% from 928 m to 932 m-11.5% from 932 m to 937 m0.0% from 937 m to 940 m-8.8% from 940 m to 944 m-7.9% from 944 m to 950 m-10.0% from 950 m to 955 m-12.2% from 955 m to 960 m-3.6% from 960 m to 966 m-3.3% from 966 m to 969 m0.0% from 969 m to 972 m12.3% from 972 m to 978 m3.1% from 978 m to 981 m16.7% from 981 m to 986 m18.2% from 986 m to 989 m22.6% from 989 m to 995 m25.7% from 995 m to 998 m23.7% from 998 m to 1.0 km27.5% from 1.0 km to 1.0 km23.1% from 1.0 km to 1.0 km26.5% from 1.0 km to 1.0 km30.0% from 1.0 km to 1.0 km24.4% from 1.0 km to 1.0 km25.0% from 1.0 km to 1.0 km30.3% from 1.0 km to 1.0 km25.6% from 1.0 km to 1.0 km31.3% from 1.0 km to 1.0 km35.0% from 1.0 km to 1.0 km36.2% from 1.0 km to 1.1 km38.1% from 1.1 km to 1.1 km38.1% from 1.1 km to 1.1 km26.7% from 1.1 km to 1.1 km25.0% from 1.1 km to 1.1 km25.0% from 1.1 km to 1.1 km27.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km20.0% from 1.1 km to 1.1 km18.0% from 1.1 km to 1.1 km26.3% from 1.1 km to 1.1 km25.7% from 1.1 km to 1.1 km22.4% from 1.1 km to 1.1 km19.4% from 1.1 km to 1.1 km22.1% from 1.1 km to 1.1 km23.5% from 1.1 km to 1.1 km23.1% from 1.1 km to 1.1 km30.2% from 1.1 km to 1.1 km16.3% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km25.7% from 1.1 km to 1.1 km29.5% from 1.1 km to 1.1 km25.6% from 1.1 km to 1.1 km30.4% from 1.1 km to 1.2 km31.9% from 1.2 km to 1.2 km-5.7% from 1.2 km to 1.2 km-7.8% from 1.2 km to 1.2 km5.0% from 1.2 km to 1.2 km6.8% from 1.2 km to 1.2 km9.7% from 1.2 km to 1.2 km15.5% from 1.2 km to 1.2 km13.3% from 1.2 km to 1.2 km-9.8% from 1.2 km to 1.2 km-23.6% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km-44.1% from 1.2 km to 1.2 km-46.6% from 1.2 km to 1.2 km10%-2%28%-7%16%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.23 km / 0.76 miles
Elevation gain187.6 m / 615 ft
Average gradient8.9%
Maximum gradient46.9%
Elevation high228 m / 748 ft
Elevation low112.9 m / 370 ft
Climb difficulty score10,955.9

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Bald Head Hill
Kinta, Ipoh
1.71 km8.9%153 m
Persiaran Lembah Perpaduan Climb
Kinta, Ipoh
1.18 km7.4%87 m
A182 Climb
Kinta, Ipoh
1.07 km7.6%82 m
Kledang Hill "S" Corner
Kinta, Ipoh
2.22 km9.9%219 m
Kok Leong's hairpin to Ivan's hill
Kinta, Ipoh
1.52 km5.3%80 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 509,381st out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 689th most difficult cycling climb of all 5,846 climbs in Malaysia.

📉

Places 40th out of 312 cycling climbs in Perak.

Ranks 18th out of 65 cycling climbs in Ipoh.

🏵️

A local climb of note, this is the 9th most difficult cycling climb (out of 43 climbs) in Kinta.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb