Start to Crash Point ~KM26
Estimated Climb Time
Loading your rider settings for Start to Crash Point ~KM26...
Climb Profile
Altitude builds left to right while colour shows gradient severity for each part of Start to Crash Point ~KM26.
Veloviewer Route And Climb Visualiser
Switch to Veloviewer when you want the full external route visualiser.
Climb Stats
Combined metric and imperial stats for quick route planning.
| Climb category | Uncategorised |
| Distance | 21.58 km / 13.41 miles |
| Elevation gain | 16 m / 52 ft |
| Average gradient | 0.1% |
| Maximum gradient | 22.7% |
| Elevation high | 117.8 m / 386 ft |
| Elevation low | 31.1 m / 102 ft |
| Climb difficulty score | 1,510.66 |
Similar Climbs Nearby
If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.
Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.
| Climb | Length | Gradient | Ascent |
|---|---|---|---|
Semenyih - Ampangan (Lekas) Kajang–Seremban Highway, Semenyih | 38.55 km | 0.1% | 30 m |
LEKAS (Semenyih - Nilai) Kajang–Seremban Highway, Semenyih | 10.67 km | 0.1% | 5 m |
LEKAS looper Kajang–Seremban Highway, Semenyih | 5.19 km | 0.1% | 6 m |
LEKAS (Semenyih Exit Climb) Kajang–Seremban Highway, Semenyih | 1.56 km | 0.9% | 14 m |
Semenyih Exit Kajang–Seremban Highway, Semenyih | 1.1 km | 0.7% | 7 m |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 2,090,324th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 3,953rd most difficult cycling climb of all 5,846 climbs in Malaysia. |
📉 Places 91st out of 140 cycling climbs in Kajang Municipal Council. |
⚖ Ranks 18th out of 27 cycling climbs in Semenyih. |
🥈️ This is the second most difficult cycling climb in Kajang–Seremban Highway. |
Useful Links
View this climb on other sites.
| Google Street View |
| Strava |
Something wrong with this listing? Help keep BikeClimbs accurate.
Flag this climb