upblasting

📍
Pasir Gudang, Johor Bahru, Johor, 81700, Malaysia
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for upblasting...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of upblasting.

40 m50 m60 m70 m0.0% from 0 m to 5 m8.9% from 5 m to 14 m19.4% from 14 m to 17 m11.8% from 17 m to 20 m10.3% from 20 m to 24 m0.0% from 24 m to 33 m0.0% from 33 m to 42 m0.0% from 42 m to 47 m15.4% from 47 m to 50 m14.8% from 50 m to 53 m16.0% from 53 m to 55 m16.0% from 55 m to 58 m13.3% from 58 m to 61 m0.0% from 61 m to 64 m0.0% from 64 m to 71 m0.0% from 71 m to 82 m26.1% from 82 m to 85 m15.4% from 85 m to 87 m16.7% from 87 m to 90 m17.4% from 90 m to 92 m24.0% from 92 m to 94 m0.0% from 94 m to 99 m0.0% from 99 m to 115 m0.0% from 115 m to 134 m4.9% from 134 m to 142 m9.5% from 142 m to 146 m10.8% from 146 m to 150 m10.5% from 150 m to 154 m17.6% from 154 m to 157 m0.0% from 157 m to 161 m3.0% from 161 m to 175 m15.4% from 175 m to 177 m23.1% from 177 m to 180 m12.5% from 180 m to 183 m13.8% from 183 m to 186 m0.0% from 186 m to 191 m0.0% from 191 m to 195 m0.0% from 195 m to 203 m3.5% from 203 m to 214 m33.3% from 214 m to 216 m19.0% from 216 m to 218 m19.0% from 218 m to 220 m18.2% from 220 m to 222 m0.0% from 222 m to 224 m0.0% from 224 m to 228 m20.7% from 228 m to 231 m12.5% from 231 m to 234 m12.1% from 234 m to 238 m13.8% from 238 m to 241 m13.3% from 241 m to 244 m3.7% from 244 m to 254 m27.3% from 254 m to 257 m22.2% from 257 m to 258 m23.5% from 258 m to 260 m100.0% from 260 m to 261 m0.0% from 261 m to 263 m0.0% from 263 m to 269 m0.0% from 269 m to 278 m0.0% from 278 m to 282 m0.0% from 282 m to 284 m0.0% from 284 m to 286 m0.0% from 286 m to 290 m0.0% from 290 m to 290 m0.0% from 290 m to 292 m0.0% from 292 m to 301 m0.0% from 301 m to 323 m0.0% from 323 m to 330 m0.0% from 330 m to 334 m8.2% from 334 m to 339 m10.2% from 339 m to 345 m8.3% from 345 m to 350 m7.7% from 350 m to 355 m9.5% from 355 m to 359 m6.1% from 359 m to 366 m13.3% from 366 m to 369 m15.4% from 369 m to 372 m11.1% from 372 m to 375 m16.7% from 375 m to 379 m14.0% from 379 m to 383 m10.0% from 383 m to 387 m19.4% from 387 m to 390 m17.6% from 390 m to 394 m5.9% from 394 m to 400 m18.2% from 400 m to 403 m13.3% from 403 m to 406 m19.0% from 406 m to 408 m12.5% from 408 m to 411 m0.0% from 411 m to 417 m25.0% from 417 m to 420 m66.7% from 420 m to 420 m40.0% from 420 m to 421 m7%4%7%7%0 m100 m200 m300 m400 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.42 km / 0.26 miles
Elevation gain27.6 m / 91 ft
Average gradient6.6%
Maximum gradient30.6%
Elevation high68 m / 223 ft
Elevation low40.4 m / 133 ft
Climb difficulty score2,758.86

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
panjat apa lg
Johor Bahru, Pasir Gudang
0.41 km6.4%26 m
Top 2
Johor Bahru, Pasir Gudang
0.47 km5.4%26 m
Bukit wajib
Johor Bahru, Pasir Gudang
0.36 km7.8%28 m
ayam up
Johor Bahru, Pasir Gudang
0.36 km6%22 m
Bukit Anjing
Johor Bahru, Pasir Gudang
0.41 km4.4%24 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,607,738th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 2,533rd most difficult cycling climb of all 5,846 climbs in Malaysia.

📉

Places 167th out of 600 cycling climbs in Johor.

Ranks 12th out of 35 cycling climbs in Pasir Gudang.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 31 climbs) in Johor Bahru.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb