笠甫-三ツ石トンネル

📍
National Highway Route 42, Shirahama, Nishimuro County, Wakayama Prefecture, Japan
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for 笠甫-三ツ石トンネル...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of 笠甫-三ツ石トンネル.

20 m40 m60 m80 m6.4% from 0 m to 9 m4.7% from 9 m to 52 m3.8% from 52 m to 68 m3.0% from 68 m to 91 m2.7% from 91 m to 106 m1.4% from 106 m to 120 m1.4% from 120 m to 127 m0.0% from 127 m to 141 m0.0% from 141 m to 148 m-0.7% from 148 m to 162 m6.5% from 162 m to 198 m7.4% from 198 m to 204 m7.2% from 204 m to 225 m7.2% from 225 m to 239 m10.1% from 239 m to 246 m11.6% from 246 m to 260 m12.5% from 260 m to 287 m13.6% from 287 m to 293 m13.5% from 293 m to 326 m19.4% from 326 m to 333 m16.0% from 333 m to 346 m14.9% from 346 m to 371 m11.5% from 371 m to 377 m10.7% from 377 m to 389 m9.5% from 389 m to 400 m10.9% from 400 m to 418 m10.2% from 418 m to 424 m5.9% from 424 m to 436 m8.3% from 436 m to 442 m8.5% from 442 m to 447 m5.3% from 447 m to 453 m11.0% from 453 m to 476 m6.8% from 476 m to 482 m2.3% from 482 m to 499 m-6.2% from 499 m to 511 m-11.0% from 511 m to 522 m-14.2% from 522 m to 541 m-15.7% from 541 m to 546 m-16.8% from 546 m to 565 m-18.0% from 565 m to 571 m-1.1% from 571 m to 589 m11.6% from 589 m to 600 m13.0% from 600 m to 606 m13.8% from 606 m to 621 m16.0% from 621 m to 626 m16.3% from 626 m to 631 m17.3% from 631 m to 641 m21.3% from 641 m to 645 m22.2% from 645 m to 650 m25.5% from 650 m to 655 m26.6% from 655 m to 669 m22.2% from 669 m to 685 m0.0% from 685 m to 689 m4.7% from 689 m to 708 m-3.4% from 708 m to 723 m-1.0% from 723 m to 733 m2.1% from 733 m to 747 m4.3% from 747 m to 752 m6.2% from 752 m to 756 m10.0% from 756 m to 770 m8.7% from 770 m to 775 m11.0% from 775 m to 784 m14.0% from 784 m to 793 m15.6% from 793 m to 803 m2.0% from 803 m to 813 m2.0% from 813 m to 818 m0.0% from 818 m to 839 m-1.9% from 839 m to 844 m-3.7% from 844 m to 855 m-5.5% from 855 m to 860 m-9.0% from 860 m to 871 m4%11%3%4%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.87 km / 0.54 miles
Elevation gain51.9 m / 170 ft
Average gradient6%
Maximum gradient24.8%
Elevation high76.6 m / 251 ft
Elevation low22.9 m / 75 ft
Climb difficulty score5,193.54

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
市江~三ツ石トンネル
Shirahama, Nishimuro County
0.92 km4.1%38 m
Isegaya Climb
Shirahama, Nishimuro County
0.73 km5.1%37 m
Kumano highway old coastal road
Shirahama, Nishimuro County
1.27 km6%76 m
三段~白浜GC
Shirahama, Nishimuro County
1.3 km5%65 m
桃の木~アドベン
Shirahama, Nishimuro County
1.37 km6.3%86 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,068,967th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 4,821st most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 131st out of 185 cycling climbs in Wakayama Prefecture.

Ranks 12th out of 23 cycling climbs in Nishimuro County.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 18 climbs) in Shirahama.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb