Ostrich party
📍 Sannohara Niseko Line, Toyosato, Niseko, Abuta County, Shiribeshi Subprefecture, Hokkaido Prefecture, 048-1501, Japan
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 80.2 m |
Distance (Kilometers) | 2.01 km |
Average Gradient | 4% |
Climb Category | Category 4 |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 1.25 miles |
Distance (Raw) | 2,008.9 m |
Elevation High | 209.9 m |
Elevation Low | 129.5 m |
Maximum Gradient | 8% |
Climb Difficulty Score | 8,015.51 |
Social Climbing
All the important climbing popularity information.
💪 There are 1,856 recorded attempts by 521 individual cyclists. |
📈 That's an average of 3.56 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 758,649th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 4,025th most difficult cycling climb of all 7,307 climbs in Japan. |
📉 Places 89th out of 132 cycling climbs in Shiribeshi Subprefecture. |
⚖ Ranks 38th out of 71 cycling climbs in Abuta County. |
⚖ Ranking 15th out of 30 cycling climbs in Niseko. |