滝ノ入線(林道標識~最高地点)

📍
滝ノ入, Moroyama, Iruma County, Saitama Prefecture, 350-0422, Japan

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)141 m
Distance (Kilometers)2.2 km
Average Gradient6.4%
Climb CategoryCategory 4

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)1.37 miles
Distance (Raw)2,203.5 m
Elevation High285 m
Elevation Low144 m
Maximum Gradient14.1%
Climb Difficulty Score14,102.4

Social Climbing

All the important climbing popularity information.

💪

There are 1,747 recorded attempts by 538 individual cyclists.

📈

That's an average of 3.25 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 367,922nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 2,128th most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 221st out of 573 cycling climbs in Saitama Prefecture.

Ranks 35th out of 98 cycling climbs in Iruma County.

Ranking 16th out of 37 cycling climbs in Moroyama.

The Latest Cycling News