Sasanqua Sprint 登り

📍
中原三瀬線, Ishinari, Yoshinogari, Kanzaki County, Saga Prefecture, 842-0193, Japan
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Sasanqua Sprint 登り...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Sasanqua Sprint 登り.

50 m60 m70 m80 m0.0% from 0 m to 58 m0.0% from 58 m to 102 m1.0% from 102 m to 143 m9.1% from 143 m to 150 m6.1% from 150 m to 157 m6.1% from 157 m to 163 m6.2% from 163 m to 170 m0.0% from 170 m to 195 m1.2% from 195 m to 230 m7.5% from 230 m to 235 m7.5% from 235 m to 240 m7.5% from 240 m to 245 m7.7% from 245 m to 251 m2.0% from 251 m to 271 m16.0% from 271 m to 276 m8.2% from 276 m to 281 m8.3% from 281 m to 285 m1.6% from 285 m to 310 m12.2% from 310 m to 315 m8.3% from 315 m to 319 m8.3% from 319 m to 324 m8.2% from 324 m to 329 m0.0% from 329 m to 349 m1.6% from 349 m to 400 m11.8% from 400 m to 405 m8.0% from 405 m to 410 m8.2% from 410 m to 415 m0.0% from 415 m to 434 m2.8% from 434 m to 448 m8.5% from 448 m to 453 m8.7% from 453 m to 458 m12.8% from 458 m to 462 m8.7% from 462 m to 467 m0.0% from 467 m to 472 m0.0% from 472 m to 476 m1.5% from 476 m to 504 m8.7% from 504 m to 508 m8.9% from 508 m to 513 m17.8% from 513 m to 517 m0.0% from 517 m to 544 m4.3% from 544 m to 554 m8.9% from 554 m to 558 m8.9% from 558 m to 563 m9.1% from 563 m to 567 m9.5% from 567 m to 571 m0.0% from 571 m to 579 m5.3% from 579 m to 587 m16.2% from 587 m to 591 m10.8% from 591 m to 594 m11.1% from 594 m to 598 m11.1% from 598 m to 601 m0.0% from 601 m to 605 m7.4% from 605 m to 616 m11.1% from 616 m to 619 m11.1% from 619 m to 623 m11.1% from 623 m to 627 m0.0% from 627 m to 634 m2.8% from 634 m to 648 m15.8% from 648 m to 652 m10.5% from 652 m to 656 m10.0% from 656 m to 660 m9.5% from 660 m to 664 m0.0% from 664 m to 668 m0.0% from 668 m to 695 m0.0% from 695 m to 718 m0.0% from 718 m to 727 m0.0% from 727 m to 749 m0.0% from 749 m to 753 m0.0% from 753 m to 780 m0%2%4%3%4%6%4%0%0 m100 m200 m300 m400 m500 m600 m700 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.78 km / 0.48 miles
Elevation gain23.2 m / 76 ft
Average gradient3%
Maximum gradient12.3%
Elevation high75.6 m / 248 ft
Elevation low52.4 m / 172 ft
Climb difficulty score2,316.3

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Higashi-Sefuri Tunnel Toll Road Climb
Yoshinogari, Kanzaki County
0.91 km8.9%81 m
国道385号線 Climb
Yoshinogari, Kanzaki County
1.06 km9.7%102 m
[no name]
Yoshinogari, Kanzaki County
1.37 km8.1%111 m
東脊振トンネル有料道路 Climb
Yoshinogari, Kanzaki County
1.25 km9.9%124 m
松坂橋〜
Yoshinogari, Kanzaki County
1.7 km7.5%128 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,757,211th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 6,158th most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 27th out of 29 cycling climbs in Saga Prefecture.

😁

This is the easiest cycling climb in Kanzaki County.

🙈

This is the easiest cycling climb in Yoshinogari.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb