医療法人和の会与那原中央病院

📍
Prefectural Highway Route 240 Haebaru-Yonabaru Line, Miyagusuku, Haebaru, Shimajiri, Okinawa Prefecture, 901-1103, Japan
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for 医療法人和の会与那原中央病院...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of 医療法人和の会与那原中央病院.

25 m35 m40 m50 m0.0% from 0 m to 11 m-1.8% from 11 m to 22 m-3.4% from 22 m to 27 m-3.3% from 27 m to 46 m-5.1% from 46 m to 79 m-6.8% from 79 m to 94 m-5.7% from 94 m to 125 m-2.4% from 125 m to 142 m-1.7% from 142 m to 208 m4.0% from 208 m to 248 m3.9% from 248 m to 263 m3.8% from 263 m to 284 m4.7% from 284 m to 291 m3.2% from 291 m to 297 m3.3% from 297 m to 303 m5.1% from 303 m to 315 m3.2% from 315 m to 330 m3.2% from 330 m to 352 m2.6% from 352 m to 356 m3.5% from 356 m to 365 m2.1% from 365 m to 369 m3.7% from 369 m to 372 m1.8% from 372 m to 383 m-2.1% from 383 m to 388 m-1.3% from 388 m to 403 m-1.5% from 403 m to 423 m-1.2% from 423 m to 431 m-0.6% from 431 m to 448 m0.4% from 448 m to 473 m5.7% from 473 m to 526 m7.3% from 526 m to 552 m4.1% from 552 m to 569 m3.7% from 569 m to 585 m3.8% from 585 m to 593 m3.3% from 593 m to 608 m2.7% from 608 m to 623 m2.8% from 623 m to 637 m-3.4% from 637 m to 688 m-2.9% from 688 m to 695 m-1.5% from 695 m to 728 m6.1% from 728 m to 741 m6.1% from 741 m to 761 m6.3% from 761 m to 773 m4.9% from 773 m to 786 m3.3% from 786 m to 792 m3.3% from 792 m to 798 m3.3% from 798 m to 804 m3.4% from 804 m to 821 m3.6% from 821 m to 827 m3.4% from 827 m to 839 m3.5% from 839 m to 867 m2.9% from 867 m to 901 m1.8% from 901 m to 907 m1.7% from 907 m to 924 m1.7% from 924 m to 953 m0.8% from 953 m to 965 m1.8% from 965 m to 1.0 km2.5% from 1.0 km to 1.0 km2.7% from 1.0 km to 1.1 km2.6% from 1.1 km to 1.1 km-2%2%2%3%2%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.06 km / 0.66 miles
Elevation gain14.3 m / 47 ft
Average gradient1.4%
Maximum gradient5.9%
Elevation high48.9 m / 160 ft
Elevation low27.6 m / 91 ft
Climb difficulty score1,432.22

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Segment
Haebaru, Shimajiri
1.27 km0.8%10 m
Kanegusuku_Arakawa Climb
Haebaru, Shimajiri
0.99 km4.9%49 m
Haebaru Climb
Haebaru, Shimajiri
0.66 km3.3%22 m
兼城 to 宮平
Haebaru, Shimajiri
0.61 km0.7%7 m
大名 Climb
Haebaru, Shimajiri
1.32 km4.5%59 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,128,080th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 6,652nd most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 260th out of 326 cycling climbs in Okinawa Prefecture.

Ranks 23rd out of 33 cycling climbs in Shimajiri.

🏵️

A local climb of note, this is the 6th most difficult cycling climb (out of 9 climbs) in Haebaru.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb