乾谷上りアタック

📍
nara-seika line, Inuidani, Seika, Soraku County, Kyoto Prefecture, 619-0237, Japan
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for 乾谷上りアタック...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of 乾谷上りアタック.

115 m125 m135 m145 m0.0% from 0 m to 29 m0.0% from 29 m to 48 m0.0% from 48 m to 68 m0.0% from 68 m to 82 m0.0% from 82 m to 97 m0.0% from 97 m to 119 m0.0% from 119 m to 134 m0.0% from 134 m to 149 m0.0% from 149 m to 164 m5.8% from 164 m to 170 m5.8% from 170 m to 177 m5.9% from 177 m to 184 m5.9% from 184 m to 191 m8.8% from 191 m to 198 m6.1% from 198 m to 204 m9.1% from 204 m to 211 m6.0% from 211 m to 218 m9.2% from 218 m to 224 m0.0% from 224 m to 244 m6.3% from 244 m to 250 m6.3% from 250 m to 257 m9.4% from 257 m to 263 m6.3% from 263 m to 269 m6.2% from 269 m to 276 m3.1% from 276 m to 289 m9.4% from 289 m to 295 m6.3% from 295 m to 301 m6.3% from 301 m to 308 m6.3% from 308 m to 314 m3.2% from 314 m to 332 m6.7% from 332 m to 338 m6.6% from 338 m to 345 m6.8% from 345 m to 350 m6.6% from 350 m to 357 m6.8% from 357 m to 362 m6.9% from 362 m to 368 m6.9% from 368 m to 374 m6.9% from 374 m to 380 m7.0% from 380 m to 386 m2.3% from 386 m to 403 m7.0% from 403 m to 408 m6.9% from 408 m to 414 m7.0% from 414 m to 420 m9.8% from 420 m to 426 m7.3% from 426 m to 432 m6.9% from 432 m to 437 m7.0% from 437 m to 443 m6.9% from 443 m to 449 m6.9% from 449 m to 455 m2.4% from 455 m to 471 m7.3% from 471 m to 477 m8.3% from 477 m to 484 m22.2% from 484 m to 486 m21.1% from 486 m to 488 m0.0% from 488 m to 490 m2.2% from 490 m to 517 m7.1% from 517 m to 523 m7.1% from 523 m to 528 m10.5% from 528 m to 534 m6.9% from 534 m to 540 m0.0% from 540 m to 591 m0.0% from 591 m to 645 m-6.5% from 645 m to 655 m-4.1% from 655 m to 665 m-3.9% from 665 m to 675 m0%2%5%5%6%2%-2%0 m100 m200 m300 m400 m500 m600 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.67 km / 0.42 miles
Elevation gain20.2 m / 66 ft
Average gradient3%
Maximum gradient11%
Elevation high141 m / 463 ft
Elevation low119.4 m / 392 ft
Climb difficulty score2,017.65

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
ポイントC-G
Seika, Soraku County
0.93 km2.6%24 m
東畑口インターバル
Seika, Soraku County
0.5 km2.4%12 m
踏みますか?それとも千切れますか?
Seika, Soraku County
0.51 km4.6%24 m
光台ショート坂
Seika, Soraku County
1.02 km3.5%36 m
けいはんな裏
Seika, Soraku County
1.06 km2.4%36 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,871,394th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 6,336th most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 186th out of 206 cycling climbs in Kyoto Prefecture.

Ranks 73rd out of 82 cycling climbs in Soraku County.

Ranking 18th out of 23 cycling climbs in Seika.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb