木津川からお茶工場
📍 ueno-minami-yamashiro line, Minami-Okawara, Minamiyamashiro, Soraku County, Kyoto Prefecture, 619-1421, Japan
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 180.4 m |
Distance (Kilometers) | 9.03 km |
Average Gradient | 2% |
Climb Category | Category 3 |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 5.61 miles |
Distance (Raw) | 9,033.1 m |
Elevation High | 268.6 m |
Elevation Low | 84.4 m |
Maximum Gradient | 16.6% |
Climb Difficulty Score | 18,066.2 |
Social Climbing
All the important climbing popularity information.
💪 There are 334 recorded attempts by 232 individual cyclists. |
📈 That's an average of 1.44 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 262,522nd out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 1,594th most difficult cycling climb of all 7,307 climbs in Japan. |
📉 Places 49th out of 206 cycling climbs in Kyoto Prefecture. |
⚖ Ranks 20th out of 82 cycling climbs in Soraku County. |
🥉 This is the third most difficult cycling climb in Minamiyamashiro. |