大津駅前TT
📍 Muro, Ozu, Kikuchi County, Kumamoto Prefecture, 869-1233, Japan
Useful Links
View this climb on other sites.
| Google Street View |
| Strava |
Climb Stats
The most common and useful climbing metrics.
| Climb (Meters) | 39 m |
| Distance (Kilometers) | 0.53 km |
| Average Gradient | 7.3% |
| Climb Category | Uncategorised |
Detailed Climb Stats
Stuff for climbing nerds.
| Distance (Miles) | 0.33 miles |
| Distance (Raw) | 533.1 m |
| Elevation High | 163.8 m |
| Elevation Low | 124.8 m |
| Maximum Gradient | 13.3% |
| Climb Difficulty Score | 3,902.29 |
Social Climbing
All the important climbing popularity information.
💪 There are 527 recorded attempts by 159 individual cyclists. |
📈 That's an average of 3.31 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 1,305,658th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 5,338th most difficult cycling climb of all 7,307 climbs in Japan. |
📉 Places 170th out of 226 cycling climbs in Kumamoto Prefecture. |
⚖ Ranks 18th out of 32 cycling climbs in Kikuchi County. |
⚖ Ranking 17th out of 22 cycling climbs in Ozu. |
Site Update – October 2024
Why No Updates?
[35/24] This Week In Cycling
[32/24] This Week In Cycling