新不動橋→城山公園前

📍
Tokaido, 国府本郷, Oiso, Naka County, Kanagawa Prefecture, 259-0111, Japan

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)6.6 m
Distance (Kilometers)0.34 km
Average Gradient1.9%
Climb CategoryUncategorised

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)0.21 miles
Distance (Raw)344 m
Elevation High15.9 m
Elevation Low9.3 m
Maximum Gradient2.7%
Climb Difficulty Score660.48

Social Climbing

All the important climbing popularity information.

💪

There are 68,435 recorded attempts by 11,485 individual cyclists.

📈

That's an average of 5.96 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,558,660th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 7,131st most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 414th out of 426 cycling climbs in Kanagawa Prefecture.

Ranks 33rd out of 35 cycling climbs in Naka County.

Ranking 19th out of 21 cycling climbs in Oiso.

The Latest Cycling News