県道29号線 Climb

📍
寒霞渓公園線, Kusakabe-honmachi, Shodoshima, Shozu County, Kagawa Prefecture, 761-4411, Japan

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)90.1 m
Distance (Kilometers)1.86 km
Average Gradient4.9%
Climb CategoryCategory 4

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)1.15 miles
Distance (Raw)1,858.7 m
Elevation High89.76 m
Elevation Low-0.33 m
Maximum Gradient12.4%
Climb Difficulty Score9,014.69

Social Climbing

All the important climbing popularity information.

💪

There are 1,283 recorded attempts by 987 individual cyclists.

📈

That's an average of 1.30 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 649,530th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 3,484th most difficult cycling climb of all 7,307 climbs in Japan.

📉

Places 37th out of 103 cycling climbs in Kagawa Prefecture.

Ranks 19th out of 37 cycling climbs in Shozu County.

Ranking 12th out of 21 cycling climbs in Shodoshima.

The Latest Cycling News