寺内ダム先の新道
📍 朝倉小石原線, Asakura, Asakura County, Fukuoka Prefecture, Japan
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 198.6 m |
Distance (Kilometers) | 2.82 km |
Average Gradient | 7% |
Climb Category | Category 3 |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 1.75 miles |
Distance (Raw) | 2,819.9 m |
Elevation High | 401.8 m |
Elevation Low | 203.2 m |
Maximum Gradient | 13.6% |
Climb Difficulty Score | 19,852.1 |
Social Climbing
All the important climbing popularity information.
💪 There are 695 recorded attempts by 288 individual cyclists. |
📈 That's an average of 2.41 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 228,800th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 1,421st most difficult cycling climb of all 7,307 climbs in Japan. |
📉 Places 53rd out of 223 cycling climbs in Fukuoka Prefecture. |
🏵️ Get your legs ready, this is the 5th most difficult cycling climb (out of 18 climbs) in Asakura County. |
🥇 This is the most difficult cycling climb in Asakura. |