ゆくら妻有→重地
📍 中深見越後田沢停車場線, Tokamachi, Nakauonuma County, Niigata Prefecture, Chubu Region, 949-8201, Japan
Useful Links
View this climb on other sites.
| Google Street View |
| Strava |
Climb Stats
The most common and useful climbing metrics.
| Climb (Meters) | 146.8 m |
| Distance (Kilometers) | 4.33 km |
| Average Gradient | 3.4% |
| Climb Category | Category 4 |
Detailed Climb Stats
Stuff for climbing nerds.
| Distance (Miles) | 2.69 miles |
| Distance (Raw) | 4,325.5 m |
| Elevation High | 367.4 m |
| Elevation Low | 220.6 m |
| Maximum Gradient | 16.1% |
| Climb Difficulty Score | 14,663.45 |
Social Climbing
All the important climbing popularity information.
💪 There are 842 recorded attempts by 523 individual cyclists. |
📈 That's an average of 1.61 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 349,642nd out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 2,044th most difficult cycling climb of all 7,307 climbs in Japan. |
📉 Places 470th out of 1,462 cycling climbs in Chubu Region. |
🏵️ Get your legs ready, this is the 6th most difficult cycling climb (out of 8 climbs) in Nakauonuma County. |
🥇 This is the most difficult cycling climb in Tokamachi. |
Site Update – October 2024
Why No Updates?
[35/24] This Week In Cycling
[32/24] This Week In Cycling