Sentiero to 1st outlook

📍
Via al Dosso del Castello, Dro, Comunità Alto Garda e Ledro, Provincia di Trento, Trentino-Alto Adige/Südtirol, 38074, Italy
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Sentiero to 1st outlook...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Sentiero to 1st outlook.

125 m150 m175 m200 m6.5% from 0 m to 5 m14.9% from 5 m to 9 m8.2% from 9 m to 14 m8.3% from 14 m to 19 m23.9% from 19 m to 24 m16.3% from 24 m to 28 m13.2% from 28 m to 32 m16.2% from 32 m to 35 m13.5% from 35 m to 39 m15.8% from 39 m to 43 m15.6% from 43 m to 47 m15.2% from 47 m to 52 m14.9% from 52 m to 57 m18.0% from 57 m to 62 m18.0% from 62 m to 67 m20.8% from 67 m to 72 m18.2% from 72 m to 77 m26.6% from 77 m to 83 m-6.5% from 83 m to 88 m-5.0% from 88 m to 92 m-4.3% from 92 m to 97 m-4.8% from 97 m to 101 m-2.4% from 101 m to 105 m-2.0% from 105 m to 110 m-1.9% from 110 m to 115 m-1.9% from 115 m to 120 m0.0% from 120 m to 126 m1.7% from 126 m to 132 m0.0% from 132 m to 137 m1.8% from 137 m to 143 m0.0% from 143 m to 149 m2.0% from 149 m to 154 m0.0% from 154 m to 159 m2.2% from 159 m to 163 m0.0% from 163 m to 168 m1.8% from 168 m to 174 m2.1% from 174 m to 179 m2.0% from 179 m to 184 m1.9% from 184 m to 189 m1.9% from 189 m to 194 m2.0% from 194 m to 199 m2.3% from 199 m to 204 m2.1% from 204 m to 208 m3.9% from 208 m to 214 m2.0% from 214 m to 218 m3.8% from 218 m to 224 m4.1% from 224 m to 229 m4.3% from 229 m to 233 m7.1% from 233 m to 237 m8.7% from 237 m to 242 m11.4% from 242 m to 246 m10.3% from 246 m to 250 m13.5% from 250 m to 254 m11.4% from 254 m to 257 m11.4% from 257 m to 261 m12.5% from 261 m to 264 m11.4% from 264 m to 268 m11.4% from 268 m to 271 m9.4% from 271 m to 274 m11.9% from 274 m to 280 m12.5% from 280 m to 283 m12.9% from 283 m to 287 m9.4% from 287 m to 290 m11.9% from 290 m to 296 m10.0% from 296 m to 299 m9.1% from 299 m to 302 m5.9% from 302 m to 305 m9.4% from 305 m to 309 m6.3% from 309 m to 312 m6.2% from 312 m to 315 m6.1% from 315 m to 318 m2.8% from 318 m to 322 m2.8% from 322 m to 325 m2.8% from 325 m to 329 m0.0% from 329 m to 333 m2.3% from 333 m to 337 m0.0% from 337 m to 342 m2.3% from 342 m to 346 m0.0% from 346 m to 350 m2.4% from 350 m to 354 m2.5% from 354 m to 358 m0.0% from 358 m to 362 m2.6% from 362 m to 366 m2.7% from 366 m to 369 m2.7% from 369 m to 373 m5.3% from 373 m to 377 m2.7% from 377 m to 381 m5.7% from 381 m to 384 m5.9% from 384 m to 388 m9.1% from 388 m to 393 m7.5% from 393 m to 398 m9.8% from 398 m to 403 m9.8% from 403 m to 409 m7.5% from 409 m to 414 m7.4% from 414 m to 419 m5.8% from 419 m to 424 m3.6% from 424 m to 430 m6.5% from 430 m to 433 m3.1% from 433 m to 436 m2.9% from 436 m to 440 m2.8% from 440 m to 443 m5.3% from 443 m to 447 m2.6% from 447 m to 451 m5.1% from 451 m to 455 m2.6% from 455 m to 459 m5.6% from 459 m to 462 m5.6% from 462 m to 466 m5.6% from 466 m to 469 m5.9% from 469 m to 473 m8.8% from 473 m to 476 m7.1% from 476 m to 482 m6.9% from 482 m to 488 m7.7% from 488 m to 493 m7.8% from 493 m to 498 m11.5% from 498 m to 503 m11.3% from 503 m to 508 m12.5% from 508 m to 512 m12.1% from 512 m to 516 m11.9% from 516 m to 520 m13.6% from 520 m to 526 m16.1% from 526 m to 529 m12.9% from 529 m to 532 m16.1% from 532 m to 535 m15.5% from 535 m to 541 m30.4% from 541 m to 547 m5.7% from 547 m to 552 m3.8% from 552 m to 557 m4.0% from 557 m to 562 m3.7% from 562 m to 567 m5.7% from 567 m to 573 m2.2% from 573 m to 577 m2.4% from 577 m to 581 m0.0% from 581 m to 585 m0.0% from 585 m to 590 m-2.8% from 590 m to 594 m-5.0% from 594 m to 598 m-2.3% from 598 m to 602 m-4.8% from 602 m to 607 m-5.1% from 607 m to 611 m-2.9% from 611 m to 614 m1.9% from 614 m to 619 m5.8% from 619 m to 624 m6.1% from 624 m to 628 m5.3% from 628 m to 632 m7.3% from 632 m to 636 m4.8% from 636 m to 640 m4.7% from 640 m to 644 m4.9% from 644 m to 648 m4.8% from 648 m to 652 m5.0% from 652 m to 656 m4.9% from 656 m to 661 m4.8% from 661 m to 665 m5.1% from 665 m to 669 m5.6% from 669 m to 672 m6.1% from 672 m to 676 m3.0% from 676 m to 679 m3.3% from 679 m to 682 m3.5% from 682 m to 688 m5.9% from 688 m to 691 m2.7% from 691 m to 695 m5.3% from 695 m to 698 m5.4% from 698 m to 702 m2.9% from 702 m to 706 m5.6% from 706 m to 709 m5.4% from 709 m to 713 m2.7% from 713 m to 717 m5.4% from 717 m to 720 m2.8% from 720 m to 724 m5.7% from 724 m to 727 m3.0% from 727 m to 731 m6.2% from 731 m to 734 m3.3% from 734 m to 737 m6.3% from 737 m to 740 m3.1% from 740 m to 743 m3.1% from 743 m to 747 m6.1% from 747 m to 750 m5.4% from 750 m to 754 m5.0% from 754 m to 758 m4.7% from 758 m to 762 m4.4% from 762 m to 766 m6.5% from 766 m to 771 m6.4% from 771 m to 776 m6.4% from 776 m to 780 m4.4% from 780 m to 785 m7.0% from 785 m to 789 m7.3% from 789 m to 793 m5.0% from 793 m to 797 m5.6% from 797 m to 801 m9.1% from 801 m to 804 m6.3% from 804 m to 807 m5.7% from 807 m to 811 m7.5% from 811 m to 815 m9.1% from 815 m to 819 m6.5% from 819 m to 824 m7.0% from 824 m to 828 m9.8% from 828 m to 832 m8.1% from 832 m to 836 m8.8% from 836 m to 839 m9.1% from 839 m to 843 m6.1% from 843 m to 846 m8.6% from 846 m to 849 m8.1% from 849 m to 853 m5.1% from 853 m to 857 m7.5% from 857 m to 861 m5.6% from 861 m to 865 m6.3% from 865 m to 868 m4.7% from 868 m to 874 m7.3% from 874 m to 878 m4.3% from 878 m to 883 m7.3% from 883 m to 889 m5.1% from 889 m to 894 m4.8% from 894 m to 901 m3.4% from 901 m to 907 m3.6% from 907 m to 912 m3.4% from 912 m to 918 m6.7% from 918 m to 924 m6.8% from 924 m to 930 m8.2% from 930 m to 936 m6.1% from 936 m to 943 m6.1% from 943 m to 949 m4.9% from 949 m to 955 m7.4% from 955 m to 961 m8.9% from 961 m to 966 m6.7% from 966 m to 971 m6.7% from 971 m to 975 m5.1% from 975 m to 979 m2.6% from 979 m to 983 m5.1% from 983 m to 987 m5.6% from 987 m to 990 m2.6% from 990 m to 994 m5.1% from 994 m to 998 m5.0% from 998 m to 1.0 km2.6% from 1.0 km to 1.0 km5.4% from 1.0 km to 1.0 km2.7% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km8.8% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km7.7% from 1.0 km to 1.0 km6.7% from 1.0 km to 1.0 km7.0% from 1.0 km to 1.0 km7.3% from 1.0 km to 1.0 km7.4% from 1.0 km to 1.1 km7.8% from 1.1 km to 1.1 km12.5% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km3.1% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km3.0% from 1.1 km to 1.1 km3.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km6.3% from 1.1 km to 1.1 km-3.2% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-1.8% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-1.9% from 1.1 km to 1.1 km-1.9% from 1.1 km to 1.2 km-1.8% from 1.2 km to 1.2 km-3.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-3.3% from 1.2 km to 1.2 km-3.6% from 1.2 km to 1.2 km-4.1% from 1.2 km to 1.2 km-2.4% from 1.2 km to 1.2 km-2.6% from 1.2 km to 1.2 km-2.1% from 1.2 km to 1.2 km-3.4% from 1.2 km to 1.2 km-3.9% from 1.2 km to 1.2 km-2.1% from 1.2 km to 1.2 km-2.1% from 1.2 km to 1.2 km-2.3% from 1.2 km to 1.2 km40.5% from 1.2 km to 1.2 km14.6% from 1.2 km to 1.2 km15.2% from 1.2 km to 1.2 km11.1% from 1.2 km to 1.2 km-6.2% from 1.2 km to 1.2 km-6.5% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km13.2% from 1.2 km to 1.3 km14.5% from 1.3 km to 1.3 km13.0% from 1.3 km to 1.3 km14.5% from 1.3 km to 1.3 km15.4% from 1.3 km to 1.3 km13.5% from 1.3 km to 1.3 km11.3% from 1.3 km to 1.3 km10.2% from 1.3 km to 1.3 km9.8% from 1.3 km to 1.3 km10.0% from 1.3 km to 1.3 km6%6%6%6%3%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.3 km / 0.81 miles
Elevation gain74.5 m / 244 ft
Average gradient5.7%
Maximum gradient21.2%
Elevation high199.6 m / 655 ft
Elevation low125.1 m / 410 ft
Climb difficulty score7,448.01

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Prima Parte Drena ⚡️
Dro, Provincia di Trento
1.46 km6.2%90 m
2* Parte Drena ⚡️⚡️
Dro, Provincia di Trento
1.28 km7.1%91 m
MESSA SECONDA
Dro, Provincia di Trento
1.01 km5%74 m
"mezza drena - tornante
Dro, Provincia di Trento
1.53 km6.4%98 m
Tamburello Completo ⚡️
Dro, Provincia di Trento
1.16 km7.5%87 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 804,936th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 121,899th most difficult cycling climb of all 223,821 climbs in Italy.

📉

Places 3,734th out of 5,638 cycling climbs in Trentino-Alto Adige/Südtirol.

Ranks 2,185th out of 3,324 cycling climbs in Provincia di Trento.

Ranking 42nd out of 65 cycling climbs in Dro.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb