xc percorso vita ROVATO

📍
Variante Nord Percorso Vita, Rovato, Brescia, Lombardy, 25038, Italy
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for xc percorso vita ROVATO...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of xc percorso vita ROVATO.

220 m250 m275 m305 m8.5% from 0 m to 5 m12.9% from 5 m to 8 m13.3% from 8 m to 12 m13.2% from 12 m to 19 m4.7% from 19 m to 23 m3.0% from 23 m to 27 m5.6% from 27 m to 32 m5.4% from 32 m to 36 m6.0% from 36 m to 41 m5.3% from 41 m to 45 m11.1% from 45 m to 49 m12.8% from 49 m to 53 m10.6% from 53 m to 58 m9.8% from 58 m to 62 m5.4% from 62 m to 66 m6.8% from 66 m to 70 m4.8% from 70 m to 74 m5.4% from 74 m to 78 m6.1% from 78 m to 81 m7.0% from 81 m to 85 m5.4% from 85 m to 89 m5.3% from 89 m to 93 m14.0% from 93 m to 98 m14.3% from 98 m to 101 m20.0% from 101 m to 105 m11.8% from 105 m to 109 m14.7% from 109 m to 112 m18.2% from 112 m to 117 m28.6% from 117 m to 120 m30.6% from 120 m to 124 m33.3% from 124 m to 128 m30.0% from 128 m to 132 m29.3% from 132 m to 136 m41.9% from 136 m to 139 m30.8% from 139 m to 143 m34.0% from 143 m to 148 m38.8% from 148 m to 153 m48.7% from 153 m to 157 m23.9% from 157 m to 161 m43.2% from 161 m to 165 m17.1% from 165 m to 169 m16.1% from 169 m to 172 m22.6% from 172 m to 175 m31.5% from 175 m to 180 m12.0% from 180 m to 185 m15.9% from 185 m to 190 m29.4% from 190 m to 193 m14.6% from 193 m to 197 m13.0% from 197 m to 202 m13.6% from 202 m to 206 m21.1% from 206 m to 210 m34.8% from 210 m to 215 m17.6% from 215 m to 218 m146.9% from 218 m to 221 m102.0% from 221 m to 226 m6.1% from 226 m to 230 m4.1% from 230 m to 234 m5.6% from 234 m to 238 m4.1% from 238 m to 243 m5.4% from 243 m to 247 m4.4% from 247 m to 251 m6.4% from 251 m to 256 m9.8% from 256 m to 261 m11.1% from 261 m to 265 m16.3% from 265 m to 270 m15.9% from 270 m to 275 m15.6% from 275 m to 279 m10.3% from 279 m to 283 m12.5% from 283 m to 286 m14.8% from 286 m to 292 m15.6% from 292 m to 296 m13.3% from 296 m to 300 m11.3% from 300 m to 306 m7.1% from 306 m to 311 m6.0% from 311 m to 316 m5.7% from 316 m to 321 m-23.4% from 321 m to 326 m20.5% from 326 m to 330 m11.9% from 330 m to 336 m-8.0% from 336 m to 341 m-18.8% from 341 m to 344 m34.6% from 344 m to 349 m15.6% from 349 m to 352 m-11.8% from 352 m to 358 m-13.5% from 358 m to 361 m-9.4% from 361 m to 367 m-12.2% from 367 m to 371 m29.0% from 371 m to 374 m26.1% from 374 m to 378 m38.2% from 378 m to 382 m76.7% from 382 m to 386 m-56.7% from 386 m to 389 m-2.6% from 389 m to 393 m-7.7% from 393 m to 397 m-5.9% from 397 m to 402 m-2.4% from 402 m to 406 m25.0% from 406 m to 411 m7.1% from 411 m to 415 m10.8% from 415 m to 419 m30.8% from 419 m to 423 m6.3% from 423 m to 426 m28.2% from 426 m to 430 m5.0% from 430 m to 434 m0.0% from 434 m to 439 m37.5% from 439 m to 444 m15.6% from 444 m to 447 m-39.4% from 447 m to 450 m12.1% from 450 m to 454 m2.3% from 454 m to 458 m8.9% from 458 m to 462 m-22.2% from 462 m to 466 m2.0% from 466 m to 471 m-21.7% from 471 m to 476 m-2.9% from 476 m to 479 m-38.5% from 479 m to 484 m-2.0% from 484 m to 489 m-36.8% from 489 m to 495 m-12.7% from 495 m to 501 m-31.7% from 501 m to 507 m-22.6% from 507 m to 512 m-13.6% from 512 m to 517 m12.8% from 517 m to 521 m10.0% from 521 m to 525 m8.7% from 525 m to 529 m6.8% from 529 m to 534 m5.7% from 534 m to 537 m8.6% from 537 m to 541 m10.9% from 541 m to 545 m8.5% from 545 m to 550 m8.1% from 550 m to 554 m8.1% from 554 m to 557 m8.9% from 557 m to 562 m7.7% from 562 m to 566 m11.8% from 566 m to 569 m11.1% from 569 m to 574 m13.9% from 574 m to 577 m14.6% from 577 m to 581 m12.1% from 581 m to 585 m12.1% from 585 m to 588 m13.3% from 588 m to 591 m6.5% from 591 m to 594 m10.4% from 594 m to 599 m10.5% from 599 m to 603 m8.6% from 603 m to 606 m8.7% from 606 m to 611 m10.0% from 611 m to 614 m9.4% from 614 m to 617 m8.6% from 617 m to 620 m6.1% from 620 m to 624 m8.9% from 624 m to 629 m5.9% from 629 m to 633 m4.8% from 633 m to 637 m5.3% from 637 m to 643 m5.6% from 643 m to 646 m2.2% from 646 m to 651 m2.8% from 651 m to 658 m2.2% from 658 m to 663 m2.5% from 663 m to 667 m0.0% from 667 m to 670 m4.8% from 670 m to 674 m5.3% from 674 m to 678 m6.3% from 678 m to 681 m3.3% from 681 m to 684 m4.3% from 684 m to 688 m5.3% from 688 m to 692 m5.9% from 692 m to 696 m6.3% from 696 m to 700 m6.8% from 700 m to 705 m9.1% from 705 m to 710 m6.8% from 710 m to 715 m7.9% from 715 m to 719 m8.6% from 719 m to 722 m9.1% from 722 m to 725 m10.8% from 725 m to 729 m6.5% from 729 m to 732 m5.4% from 732 m to 736 m10.6% from 736 m to 741 m7.7% from 741 m to 747 m7.7% from 747 m to 751 m4.8% from 751 m to 757 m5.3% from 757 m to 763 m2.2% from 763 m to 772 m4.0% from 772 m to 777 m3.0% from 777 m to 780 m2.1% from 780 m to 785 m3.0% from 785 m to 788 m3.0% from 788 m to 792 m8.0% from 792 m to 797 m0.0% from 797 m to 801 m5.1% from 801 m to 807 m5.6% from 807 m to 811 m-6.7% from 811 m to 815 m-5.1% from 815 m to 819 m-19.4% from 819 m to 823 m30.3% from 823 m to 826 m5.4% from 826 m to 830 m23.5% from 830 m to 835 m-15.5% from 835 m to 841 m3.6% from 841 m to 846 m-4.4% from 846 m to 851 m-4.4% from 851 m to 855 m-2.9% from 855 m to 859 m-5.0% from 859 m to 865 m-2.6% from 865 m to 872 m-3.7% from 872 m to 878 m-4.9% from 878 m to 882 m-5.7% from 882 m to 887 m-1.4% from 887 m to 894 m-1.4% from 894 m to 902 m-1.1% from 902 m to 911 m-1.7% from 911 m to 917 m0.0% from 917 m to 924 m0.0% from 924 m to 927 m2.6% from 927 m to 931 m-1.8% from 931 m to 937 m-6.2% from 937 m to 943 m-6.0% from 943 m to 948 m-6.5% from 948 m to 953 m-6.1% from 953 m to 958 m-4.8% from 958 m to 962 m-6.7% from 962 m to 968 m-3.9% from 968 m to 973 m-7.3% from 973 m to 977 m-3.5% from 977 m to 983 m-5.1% from 983 m to 989 m-5.2% from 989 m to 995 m-2.4% from 995 m to 999 m-2.9% from 999 m to 1.0 km-2.7% from 1.0 km to 1.0 km-2.9% from 1.0 km to 1.0 km-2.3% from 1.0 km to 1.0 km-2.4% from 1.0 km to 1.0 km-4.4% from 1.0 km to 1.0 km20%5%6%-1%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.03 km / 0.64 miles
Elevation gain71.6 m / 235 ft
Average gradient6.9%
Maximum gradient43.5%
Elevation high301.7 m / 990 ft
Elevation low223 m / 732 ft
Climb difficulty score7,156.61

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
salita VV
Rovato, Brescia
0.93 km8.1%75 m
monte orfano S.Sefano-Cima
Rovato, Brescia
1.05 km10.3%108 m
Da convento alla croce
Rovato, Brescia
0.99 km4.3%43 m
Rovato - Salita completa ai cannoni (via Santo Stefano) UFFICIALE
Rovato, Brescia
1.24 km10.6%132 m
Rovato - Cannoni da via Conchetti
Rovato, Brescia
1.52 km8.8%134 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 831,175th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 124,158th most difficult cycling climb of all 223,821 climbs in Italy.

📉

Places 14,026th out of 29,196 cycling climbs in Lombardy.

Ranks 3,149th out of 6,453 cycling climbs in Brescia.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 27 climbs) in Rovato.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb