Monteorfano creste dir Rovato

📍
Via Cominotti, Cologne, Brescia, Lombardy, 25033, Italy
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Monteorfano creste dir Rovato...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Monteorfano creste dir Rovato.

290 m310 m335 m355 m-11.8% from 0 m to 3 m-19.5% from 3 m to 8 m-21.6% from 8 m to 11 m-26.5% from 11 m to 15 m-32.4% from 15 m to 18 m-23.5% from 18 m to 21 m-20.0% from 21 m to 25 m-10.0% from 25 m to 30 m-7.9% from 30 m to 34 m-6.1% from 34 m to 37 m-8.3% from 37 m to 41 m-8.3% from 41 m to 45 m-8.9% from 45 m to 50 m-8.5% from 50 m to 55 m-8.3% from 55 m to 59 m-8.7% from 59 m to 64 m-8.7% from 64 m to 69 m-14.9% from 69 m to 73 m-19.0% from 73 m to 78 m-15.0% from 78 m to 82 m-13.0% from 82 m to 86 m-15.8% from 86 m to 90 m-25.0% from 90 m to 94 m-30.2% from 94 m to 98 m-47.6% from 98 m to 102 m-35.9% from 102 m to 106 m-50.0% from 106 m to 110 m1.9% from 110 m to 115 m20.8% from 115 m to 121 m10.4% from 121 m to 126 m3.6% from 126 m to 131 m3.8% from 131 m to 136 m3.3% from 136 m to 142 m6.3% from 142 m to 146 m3.7% from 146 m to 151 m3.8% from 151 m to 156 m3.3% from 156 m to 162 m0.0% from 162 m to 165 m2.9% from 165 m to 169 m2.9% from 169 m to 172 m2.4% from 172 m to 177 m0.0% from 177 m to 180 m4.3% from 180 m to 185 m3.0% from 185 m to 188 m2.4% from 188 m to 192 m0.0% from 192 m to 197 m3.0% from 197 m to 200 m0.0% from 200 m to 204 m1.8% from 204 m to 210 m0.0% from 210 m to 215 m1.8% from 215 m to 221 m0.0% from 221 m to 226 m0.0% from 226 m to 230 m0.0% from 230 m to 233 m31.7% from 233 m to 237 m46.7% from 237 m to 242 m23.5% from 242 m to 247 m23.6% from 247 m to 253 m21.2% from 253 m to 256 m23.1% from 256 m to 260 m24.1% from 260 m to 266 m24.2% from 266 m to 269 m20.9% from 269 m to 276 m24.4% from 276 m to 280 m22.0% from 280 m to 284 m20.5% from 284 m to 288 m19.7% from 288 m to 294 m9.5% from 294 m to 298 m7.5% from 298 m to 302 m5.9% from 302 m to 306 m5.1% from 306 m to 310 m6.5% from 310 m to 313 m2.1% from 313 m to 318 m2.2% from 318 m to 322 m2.3% from 322 m to 326 m2.6% from 326 m to 330 m4.8% from 330 m to 335 m4.9% from 335 m to 339 m7.5% from 339 m to 343 m16.2% from 343 m to 346 m23.3% from 346 m to 351 m6.2% from 351 m to 355 m4.3% from 355 m to 360 m3.8% from 360 m to 365 m6.5% from 365 m to 370 m2.9% from 370 m to 373 m6.7% from 373 m to 378 m3.8% from 378 m to 383 m8.2% from 383 m to 389 m10.3% from 389 m to 395 m6.5% from 395 m to 398 m6.5% from 398 m to 401 m4.3% from 401 m to 406 m3.8% from 406 m to 411 m2.9% from 411 m to 415 m3.3% from 415 m to 418 m5.8% from 418 m to 423 m4.4% from 423 m to 427 m5.3% from 427 m to 433 m8.9% from 433 m to 437 m10.8% from 437 m to 441 m14.7% from 441 m to 445 m10.5% from 445 m to 448 m6.4% from 448 m to 453 m10.8% from 453 m to 457 m9.1% from 457 m to 460 m12.0% from 460 m to 465 m9.8% from 465 m to 470 m7.7% from 470 m to 475 m1.9% from 475 m to 481 m3.3% from 481 m to 484 m1.9% from 484 m to 489 m4.0% from 489 m to 494 m1.9% from 494 m to 499 m3.1% from 499 m to 502 m1.6% from 502 m to 508 m2.7% from 508 m to 512 m1.9% from 512 m to 517 m2.9% from 517 m to 524 m9.1% from 524 m to 528 m8.7% from 528 m to 532 m12.2% from 532 m to 536 m8.5% from 536 m to 541 m5.3% from 541 m to 545 m2.9% from 545 m to 548 m4.3% from 548 m to 553 m2.9% from 553 m to 556 m1.7% from 556 m to 562 m3.6% from 562 m to 568 m6.0% from 568 m to 573 m5.7% from 573 m to 578 m9.4% from 578 m to 581 m6.7% from 581 m to 584 m11.8% from 584 m to 588 m10.0% from 588 m to 591 m9.4% from 591 m to 594 m9.4% from 594 m to 597 m8.6% from 597 m to 601 m3.1% from 601 m to 604 m5.1% from 604 m to 608 m5.6% from 608 m to 611 m7.3% from 611 m to 616 m15.7% from 616 m to 621 m23.4% from 621 m to 625 m34.0% from 625 m to 630 m10.4% from 630 m to 635 m6.5% from 635 m to 639 m7.7% from 639 m to 643 m10.9% from 643 m to 648 m27.1% from 648 m to 653 m9.8% from 653 m to 658 m8.1% from 658 m to 662 m7.0% from 662 m to 666 m10.3% from 666 m to 670 m15.2% from 670 m to 673 m20.0% from 673 m to 678 m13.3% from 678 m to 681 m13.3% from 681 m to 686 m23.4% from 686 m to 690 m10.8% from 690 m to 694 m13.6% from 694 m to 698 m2.9% from 698 m to 702 m2.0% from 702 m to 707 m0.0% from 707 m to 710 m3.2% from 710 m to 713 m2.3% from 713 m to 717 m4.9% from 717 m to 722 m4.7% from 722 m to 726 m5.3% from 726 m to 730 m6.2% from 730 m to 733 m2.3% from 733 m to 737 m10.0% from 737 m to 742 m10.0% from 742 m to 745 m9.3% from 745 m to 751 m4.4% from 751 m to 755 m4.7% from 755 m to 759 m4.9% from 759 m to 763 m6.3% from 763 m to 768 m4.7% from 768 m to 773 m5.4% from 773 m to 776 m6.8% from 776 m to 782 m9.1% from 782 m to 785 m10.2% from 785 m to 791 m6.3% from 791 m to 795 m5.6% from 795 m to 798 m3.0% from 798 m to 801 m2.7% from 801 m to 805 m1.9% from 805 m to 811 m2.8% from 811 m to 814 m2.6% from 814 m to 818 m0.0% from 818 m to 822 m3.1% from 822 m to 825 m3.2% from 825 m to 831 m0.0% from 831 m to 835 m2.7% from 835 m to 839 m5.1% from 839 m to 843 m0.0% from 843 m to 846 m5.7% from 846 m to 850 m8.1% from 850 m to 853 m12.3% from 853 m to 859 m6.3% from 859 m to 862 m2.0% from 862 m to 867 m3.2% from 867 m to 870 m2.4% from 870 m to 874 m2.6% from 874 m to 878 m2.0% from 878 m to 883 m2.5% from 883 m to 887 m4.9% from 887 m to 891 m4.8% from 891 m to 895 m2.0% from 895 m to 900 m0.0% from 900 m to 904 m2.9% from 904 m to 907 m0.0% from 907 m to 911 m2.2% from 911 m to 915 m2.8% from 915 m to 919 m1.9% from 919 m to 924 m2.1% from 924 m to 929 m1.6% from 929 m to 935 m0.0% from 935 m to 939 m0.0% from 939 m to 942 m0.0% from 942 m to 946 m0.0% from 946 m to 949 m2.8% from 949 m to 953 m0.0% from 953 m to 957 m0.0% from 957 m to 960 m1.9% from 960 m to 966 m0.0% from 966 m to 970 m0.0% from 970 m to 975 m1.9% from 975 m to 980 m1.8% from 980 m to 986 m0.0% from 986 m to 991 m0.0% from 991 m to 995 m2.8% from 995 m to 998 m0.0% from 998 m to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.6% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km1.6% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km-3.4% from 1.0 km to 1.0 km-5.2% from 1.0 km to 1.0 km-3.2% from 1.0 km to 1.0 km-5.7% from 1.0 km to 1.0 km-5.1% from 1.0 km to 1.1 km-2.4% from 1.1 km to 1.1 km-5.4% from 1.1 km to 1.1 km-2.7% from 1.1 km to 1.1 km-2.7% from 1.1 km to 1.1 km-5.4% from 1.1 km to 1.1 km-2.9% from 1.1 km to 1.1 km-6.9% from 1.1 km to 1.1 km-5.9% from 1.1 km to 1.1 km-4%9%9%3%-3%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.08 km / 0.67 miles
Elevation gain39.5 m / 130 ft
Average gradient3.6%
Maximum gradient30.7%
Elevation high355 m / 1,165 ft
Elevation low292.9 m / 961 ft
Climb difficulty score3,946.85

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Salita Cappuccini fino bivio sterrata Croce di Zocco
Cologne, Brescia
1.06 km10.3%109 m
Ripetitore Cologne al tornante.
Cologne, Brescia
1.05 km11.5%140 m
Ripetitore Cologne intermedio
Cologne, Brescia
1.06 km13.4%142 m
Falsopiano in Salita in Via Facchetti, Via Castello e Via Chiesa a Cologne (Bs).
Cologne, Brescia
1.32 km1.2%16 m
Salita fino alla sbarra
Cologne, Brescia
1.31 km9.8%151 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,296,416th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 158,138th most difficult cycling climb of all 223,821 climbs in Italy.

📉

Places 18,121st out of 29,196 cycling climbs in Lombardy.

Ranks 4,079th out of 6,453 cycling climbs in Brescia.

Ranking 14th out of 27 cycling climbs in Cologne.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb