mezzo tamoris

📍
Tàmoris / Tamora, Torreano, Udine, Friuli – Venezia Giulia, 33040, Italy
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for mezzo tamoris...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of mezzo tamoris.

785 m815 m845 m875 m-7.9% from 0 m to 13 m-3.8% from 13 m to 23 m-10.4% from 23 m to 33 m-6.9% from 33 m to 41 m-4.9% from 41 m to 49 m-8.1% from 49 m to 57 m-2.6% from 57 m to 64 m-6.5% from 64 m to 71 m0.0% from 71 m to 77 m3.4% from 77 m to 82 m12.8% from 82 m to 87 m8.5% from 87 m to 92 m4.8% from 92 m to 96 m0.0% from 96 m to 100 m15.0% from 100 m to 104 m0.0% from 104 m to 108 m10.5% from 108 m to 112 m5.1% from 112 m to 116 m5.1% from 116 m to 120 m10.5% from 120 m to 123 m5.0% from 123 m to 127 m25.6% from 127 m to 131 m5.3% from 131 m to 135 m21.1% from 135 m to 139 m11.1% from 139 m to 143 m11.1% from 143 m to 146 m5.6% from 146 m to 150 m11.1% from 150 m to 153 m5.9% from 153 m to 157 m11.1% from 157 m to 160 m5.7% from 160 m to 164 m5.7% from 164 m to 167 m11.1% from 167 m to 171 m11.4% from 171 m to 174 m5.3% from 174 m to 178 m27.0% from 178 m to 182 m0.0% from 182 m to 186 m10.8% from 186 m to 189 m16.2% from 189 m to 193 m0.0% from 193 m to 197 m11.8% from 197 m to 200 m11.1% from 200 m to 204 m5.7% from 204 m to 207 m5.7% from 207 m to 211 m17.6% from 211 m to 214 m11.1% from 214 m to 218 m5.3% from 218 m to 221 m0.0% from 221 m to 225 m0.0% from 225 m to 229 m5.0% from 229 m to 233 m10.0% from 233 m to 237 m5.0% from 237 m to 241 m10.5% from 241 m to 245 m10.8% from 245 m to 249 m5.3% from 249 m to 252 m5.7% from 252 m to 256 m16.7% from 256 m to 259 m5.9% from 259 m to 263 m5.9% from 263 m to 266 m12.9% from 266 m to 269 m0.0% from 269 m to 272 m20.0% from 272 m to 275 m0.0% from 275 m to 278 m12.9% from 278 m to 282 m18.7% from 282 m to 285 m0.0% from 285 m to 288 m0.0% from 288 m to 291 m5.7% from 291 m to 295 m6.5% from 295 m to 298 m6.7% from 298 m to 301 m14.3% from 301 m to 304 m20.7% from 304 m to 306 m7.1% from 306 m to 309 m35.7% from 309 m to 312 m21.4% from 312 m to 315 m21.4% from 315 m to 318 m14.8% from 318 m to 320 m0.0% from 320 m to 323 m14.8% from 323 m to 326 m0.0% from 326 m to 329 m17.4% from 329 m to 331 m0.0% from 331 m to 333 m16.0% from 333 m to 336 m8.0% from 336 m to 338 m6.9% from 338 m to 341 m21.4% from 341 m to 344 m6.7% from 344 m to 347 m13.3% from 347 m to 350 m6.7% from 350 m to 353 m13.3% from 353 m to 356 m6.7% from 356 m to 359 m12.5% from 359 m to 362 m18.7% from 362 m to 365 m0.0% from 365 m to 369 m16.7% from 369 m to 372 m5.6% from 372 m to 376 m5.4% from 376 m to 379 m5.4% from 379 m to 383 m8.5% from 383 m to 390 m0.0% from 390 m to 394 m5.4% from 394 m to 398 m10.5% from 398 m to 402 m5.4% from 402 m to 405 m5.3% from 405 m to 409 m0.0% from 409 m to 413 m10.8% from 413 m to 417 m5.4% from 417 m to 420 m5.3% from 420 m to 424 m5.1% from 424 m to 428 m15.8% from 428 m to 432 m15.4% from 432 m to 436 m10.3% from 436 m to 440 m10.0% from 440 m to 444 m5.1% from 444 m to 447 m5.0% from 447 m to 451 m0.0% from 451 m to 455 m5.0% from 455 m to 459 m15.0% from 459 m to 463 m5.0% from 463 m to 467 m0.0% from 467 m to 471 m4.8% from 471 m to 476 m10.0% from 476 m to 480 m10.0% from 480 m to 484 m15.0% from 484 m to 488 m10.0% from 488 m to 492 m4.8% from 492 m to 496 m10.3% from 496 m to 500 m0.0% from 500 m to 504 m19.5% from 504 m to 508 m5.0% from 508 m to 512 m10.5% from 512 m to 516 m10.8% from 516 m to 519 m0.0% from 519 m to 523 m0.0% from 523 m to 526 m5.9% from 526 m to 530 m5.0% from 530 m to 534 m5.1% from 534 m to 537 m15.8% from 537 m to 541 m15.8% from 541 m to 545 m4.9% from 545 m to 549 m10.0% from 549 m to 553 m9.5% from 553 m to 557 m9.5% from 557 m to 562 m4.4% from 562 m to 566 m9.5% from 566 m to 570 m5.0% from 570 m to 574 m0.0% from 574 m to 578 m10.3% from 578 m to 582 m0.0% from 582 m to 586 m10.3% from 586 m to 590 m10.0% from 590 m to 594 m10.5% from 594 m to 598 m15.4% from 598 m to 602 m5.0% from 602 m to 606 m15.0% from 606 m to 610 m10.0% from 610 m to 614 m15.0% from 614 m to 618 m14.6% from 618 m to 622 m0.0% from 622 m to 626 m0.0% from 626 m to 630 m5.1% from 630 m to 634 m14.6% from 634 m to 638 m5.0% from 638 m to 642 m5.3% from 642 m to 646 m10.5% from 646 m to 650 m5.4% from 650 m to 653 m4.9% from 653 m to 657 m5.3% from 657 m to 661 m10.8% from 661 m to 665 m10.3% from 665 m to 669 m20.5% from 669 m to 673 m5.1% from 673 m to 677 m10.0% from 677 m to 681 m0.0% from 681 m to 685 m10.0% from 685 m to 689 m-5.1% from 689 m to 693 m5.1% from 693 m to 696 m5.4% from 696 m to 700 m10.3% from 700 m to 704 m5.3% from 704 m to 708 m10.5% from 708 m to 712 m11.4% from 712 m to 715 m11.8% from 715 m to 719 m11.1% from 719 m to 722 m16.7% from 722 m to 726 m5.3% from 726 m to 730 m5.3% from 730 m to 733 m4.8% from 733 m to 738 m0.0% from 738 m to 742 m9.5% from 742 m to 746 m0.0% from 746 m to 750 m14.6% from 750 m to 754 m14.6% from 754 m to 758 m0.0% from 758 m to 762 m4.9% from 762 m to 766 m10.3% from 766 m to 770 m4.9% from 770 m to 774 m5.1% from 774 m to 778 m9.5% from 778 m to 782 m10.0% from 782 m to 786 m4.9% from 786 m to 790 m4.8% from 790 m to 795 m0.0% from 795 m to 799 m4.9% from 799 m to 803 m0.0% from 803 m to 807 m23.8% from 807 m to 811 m19.5% from 811 m to 815 m5.1% from 815 m to 819 m10.3% from 819 m to 823 m0.0% from 823 m to 827 m5.0% from 827 m to 831 m10.0% from 831 m to 835 m5.1% from 835 m to 839 m10.8% from 839 m to 843 m10.8% from 843 m to 846 m12.1% from 846 m to 850 m11.8% from 850 m to 853 m19.4% from 853 m to 856 m6.5% from 856 m to 859 m6.5% from 859 m to 862 m6.1% from 862 m to 866 m6.3% from 866 m to 869 m5.7% from 869 m to 872 m11.8% from 872 m to 876 m17.6% from 876 m to 879 m5.6% from 879 m to 883 m5.9% from 883 m to 886 m17.6% from 886 m to 890 m12.5% from 890 m to 893 m12.5% from 893 m to 896 m12.1% from 896 m to 899 m24.2% from 899 m to 903 m18.2% from 903 m to 906 m5.9% from 906 m to 909 m11.8% from 909 m to 913 m0.0% from 913 m to 916 m11.8% from 916 m to 919 m0.0% from 919 m to 923 m0.0% from 923 m to 926 m6.5% from 926 m to 929 m5.3% from 929 m to 933 m12.1% from 933 m to 936 m0.0% from 936 m to 939 m18.2% from 939 m to 943 m11.8% from 943 m to 946 m11.4% from 946 m to 950 m11.4% from 950 m to 953 m0.0% from 953 m to 956 m11.1% from 956 m to 960 m5.9% from 960 m to 963 m12.5% from 963 m to 967 m6.1% from 967 m to 970 m25.0% from 970 m to 973 m12.5% from 973 m to 976 m0.0% from 976 m to 980 m12.1% from 980 m to 983 m5.7% from 983 m to 986 m6.5% from 986 m to 989 m6.5% from 989 m to 993 m0.0% from 993 m to 996 m8.3% from 996 m to 998 m18.2% from 998 m to 1.0 km31.6% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km21.4% from 1.0 km to 1.0 km22.2% from 1.0 km to 1.0 km13.3% from 1.0 km to 1.0 km18.7% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km12.1% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km18.8% from 1.0 km to 1.0 km18.2% from 1.0 km to 1.0 km12.5% from 1.0 km to 1.0 km10.8% from 1.0 km to 1.0 km4%9%8%9%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.05 km / 0.65 miles
Elevation gain79.4 m / 260 ft
Average gradient7.6%
Maximum gradient23.4%
Elevation high871.8 m / 2,860 ft
Elevation low787.8 m / 2,585 ft
Climb difficulty score7,935.35

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
st salita prima parte cragruenza
Torreano, Udine
1.24 km8.7%108 m
MENIA SECONDA PARTE
Torreano, Udine
0.8 km6.1%48 m
Via Vernasso, 35 Climb
Torreano, Udine
1.58 km8.4%132 m
finale S. Ermacora
Torreano, Udine
1.3 km10.4%135 m
santa margherita dute
Torreano, Udine
0.84 km5.5%46 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 765,852nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 118,446th most difficult cycling climb of all 223,821 climbs in Italy.

📉

Places 1,867th out of 4,575 cycling climbs in Friuli – Venezia Giulia.

Ranks 1,045th out of 2,278 cycling climbs in Udine.

Ranking 30th out of 39 cycling climbs in Torreano.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb