pronti via

📍
Via della Chiesa, Pozzalis, Rive d'Arcano, Udine, Friuli – Venezia Giulia, 33030, Italy
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for pronti via...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of pronti via.

200 m215 m225 m240 m-7.4% from 0 m to 5 m0.0% from 5 m to 11 m-1.9% from 11 m to 22 m3.7% from 22 m to 27 m-3.6% from 27 m to 33 m3.8% from 33 m to 38 m3.6% from 38 m to 43 m3.6% from 43 m to 49 m7.3% from 49 m to 54 m0.0% from 54 m to 60 m11.1% from 60 m to 65 m0.0% from 65 m to 71 m3.8% from 71 m to 76 m3.8% from 76 m to 81 m0.0% from 81 m to 86 m0.0% from 86 m to 91 m4.5% from 91 m to 95 m0.0% from 95 m to 100 m4.3% from 100 m to 104 m4.3% from 104 m to 109 m4.2% from 109 m to 114 m0.0% from 114 m to 119 m9.1% from 119 m to 123 m0.0% from 123 m to 127 m13.6% from 127 m to 132 m4.3% from 132 m to 136 m0.0% from 136 m to 141 m4.3% from 141 m to 145 m0.0% from 145 m to 150 m5.4% from 150 m to 154 m6.7% from 154 m to 157 m5.9% from 157 m to 160 m6.1% from 160 m to 163 m0.0% from 163 m to 167 m11.4% from 167 m to 170 m-5.6% from 170 m to 174 m10.5% from 174 m to 178 m15.0% from 178 m to 182 m5.1% from 182 m to 186 m9.5% from 186 m to 190 m4.9% from 190 m to 194 m9.1% from 194 m to 198 m4.7% from 198 m to 203 m4.4% from 203 m to 207 m4.3% from 207 m to 212 m4.7% from 212 m to 216 m8.9% from 216 m to 221 m0.0% from 221 m to 225 m9.1% from 225 m to 229 m0.0% from 229 m to 234 m4.2% from 234 m to 239 m4.2% from 239 m to 243 m6.5% from 243 m to 253 m-4.3% from 253 m to 257 m4.3% from 257 m to 262 m4.4% from 262 m to 266 m4.5% from 266 m to 271 m-4.5% from 271 m to 275 m4.5% from 275 m to 280 m4.7% from 280 m to 284 m0.0% from 284 m to 288 m10.3% from 288 m to 292 m5.1% from 292 m to 296 m0.0% from 296 m to 300 m8.5% from 300 m to 305 m0.0% from 305 m to 310 m3.8% from 310 m to 315 m0.0% from 315 m to 321 m0.0% from 321 m to 326 m0.0% from 326 m to 337 m4.2% from 337 m to 341 m0.0% from 341 m to 347 m0.0% from 347 m to 353 m0.0% from 353 m to 360 m0.0% from 360 m to 366 m0.0% from 366 m to 373 m-2.7% from 373 m to 381 m0.0% from 381 m to 388 m0.0% from 388 m to 395 m0.0% from 395 m to 402 m-7.6% from 402 m to 410 m-2.3% from 410 m to 419 m-6.1% from 419 m to 429 m-2.1% from 429 m to 438 m-6.2% from 438 m to 448 m0.0% from 448 m to 458 m-7.1% from 458 m to 466 m-6.3% from 466 m to 473 m-3.6% from 473 m to 478 m-18.2% from 478 m to 483 m-4.4% from 483 m to 487 m-41.7% from 487 m to 490 m-24.0% from 490 m to 492 m-45.5% from 492 m to 494 m-9.5% from 494 m to 498 m-6.2% from 498 m to 502 m-15.4% from 502 m to 504 m6.9% from 504 m to 507 m-7.7% from 507 m to 510 m0.0% from 510 m to 513 m0.0% from 513 m to 515 m0.0% from 515 m to 518 m0.0% from 518 m to 520 m28.6% from 520 m to 522 m0.0% from 522 m to 525 m18.2% from 525 m to 528 m18.8% from 528 m to 531 m6.9% from 531 m to 534 m7.4% from 534 m to 537 m7.4% from 537 m to 540 m15.4% from 540 m to 542 m7.4% from 542 m to 545 m9.1% from 545 m to 547 m27.3% from 547 m to 549 m0.0% from 549 m to 552 m22.2% from 552 m to 555 m7.1% from 555 m to 558 m23.1% from 558 m to 560 m22.2% from 560 m to 563 m6.5% from 563 m to 566 m9.8% from 566 m to 570 m3.7% from 570 m to 575 m14.3% from 575 m to 581 m0.0% from 581 m to 588 m8.5% from 588 m to 595 m2.9% from 595 m to 602 m2.9% from 602 m to 609 m-2.9% from 609 m to 615 m3.0% from 615 m to 622 m0.0% from 622 m to 627 m0.0% from 627 m to 632 m-4.3% from 632 m to 636 m4.4% from 636 m to 641 m0.0% from 641 m to 646 m-3.8% from 646 m to 651 m0.0% from 651 m to 656 m0.0% from 656 m to 661 m-3.9% from 661 m to 666 m0.0% from 666 m to 671 m3.7% from 671 m to 677 m-3.9% from 677 m to 682 m0.0% from 682 m to 687 m0.0% from 687 m to 692 m4.4% from 692 m to 697 m5.9% from 697 m to 700 m0.0% from 700 m to 703 m12.5% from 703 m to 706 m0.0% from 706 m to 709 m8.3% from 709 m to 711 m8.3% from 711 m to 714 m25.0% from 714 m to 716 m26.1% from 716 m to 718 m9.1% from 718 m to 721 m26.1% from 721 m to 723 m6.9% from 723 m to 726 m12.5% from 726 m to 729 m12.9% from 729 m to 732 m13.3% from 732 m to 735 m12.9% from 735 m to 738 m11.8% from 738 m to 742 m16.2% from 742 m to 745 m4.9% from 745 m to 749 m8.7% from 749 m to 754 m8.5% from 754 m to 759 m4.0% from 759 m to 764 m0.0% from 764 m to 769 m3.8% from 769 m to 774 m3.7% from 774 m to 790 m0.0% from 790 m to 796 m0.0% from 796 m to 801 m3.6% from 801 m to 807 m0.0% from 807 m to 812 m7.3% from 812 m to 818 m3.5% from 818 m to 823 m0.0% from 823 m to 829 m3.5% from 829 m to 835 m0.0% from 835 m to 840 m3.4% from 840 m to 846 m1.7% from 846 m to 858 m3.3% from 858 m to 864 m1.1% from 864 m to 882 m0.0% from 882 m to 894 m0.0% from 894 m to 900 m0.0% from 900 m to 905 m0.0% from 905 m to 909 m0.0% from 909 m to 913 m5.0% from 913 m to 917 m0.0% from 917 m to 922 m0.0% from 922 m to 925 m0.0% from 925 m to 928 m6.5% from 928 m to 932 m0.0% from 932 m to 934 m-6.2% from 934 m to 937 m-6.5% from 937 m to 940 m-166.7% from 940 m to 942 m0.0% from 942 m to 943 m-20.0% from 943 m to 944 m0.0% from 944 m to 945 m11.8% from 945 m to 947 m0.0% from 947 m to 949 m53.3% from 949 m to 950 m12.5% from 950 m to 952 m23.5% from 952 m to 953 m22.2% from 953 m to 955 m0.0% from 955 m to 958 m9.1% from 958 m to 960 m7.4% from 960 m to 962 m7.1% from 962 m to 965 m7.4% from 965 m to 968 m7.1% from 968 m to 971 m7.7% from 971 m to 973 m0.0% from 973 m to 976 m0.0% from 976 m to 978 m8.0% from 978 m to 981 m0.0% from 981 m to 983 m0.0% from 983 m to 985 m18.2% from 985 m to 988 m14.3% from 988 m to 990 m14.3% from 990 m to 993 m6.9% from 993 m to 996 m6.7% from 996 m to 999 m13.3% from 999 m to 1.0 km0.0% from 1.0 km to 1.0 km13.8% from 1.0 km to 1.0 km6.9% from 1.0 km to 1.0 km6.9% from 1.0 km to 1.0 km5.9% from 1.0 km to 1.0 km-5.7% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km6.9% from 1.0 km to 1.0 km8.3% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km10.5% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km21.1% from 1.0 km to 1.0 km21.1% from 1.0 km to 1.0 km-9.5% from 1.0 km to 1.0 km9.1% from 1.0 km to 1.0 km8.7% from 1.0 km to 1.0 km17.4% from 1.0 km to 1.0 km15.4% from 1.0 km to 1.1 km24.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km8.3% from 1.1 km to 1.1 km14.8% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km6.9% from 1.1 km to 1.1 km13.8% from 1.1 km to 1.1 km5.9% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km7.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km7.4% from 1.1 km to 1.1 km15.4% from 1.1 km to 1.1 km7.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km7.4% from 1.1 km to 1.1 km13.8% from 1.1 km to 1.1 km6.9% from 1.1 km to 1.1 km20.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km12.5% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km11.4% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km8.3% from 1.1 km to 1.2 km8.3% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km3.2% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km4%-2%6%3%6%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.23 km / 0.76 miles
Elevation gain36.4 m / 119 ft
Average gradient3%
Maximum gradient19%
Elevation high240 m / 787 ft
Elevation low203 m / 666 ft
Climb difficulty score3,642.11

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Seconda parte salita Roncon - MM
Pozzalis, Udine
1.03 km2.5%26 m
Col Roncon
Pozzalis, Udine
1.69 km3.1%53 m
Emozional part 🐊🐊🐊
Pozzalis, Udine
1.07 km1.6%17 m
Gravel - Roncon
Pozzalis, Udine
1.07 km1.6%17 m
Climb From Guadi
Pozzalis, Udine
0.68 km4.3%29 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,364,875th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 162,240th most difficult cycling climb of all 223,821 climbs in Italy.

📉

Places 2,788th out of 4,575 cycling climbs in Friuli – Venezia Giulia.

Ranks 1,444th out of 2,278 cycling climbs in Udine.

🥉

This is the third most difficult cycling climb in Pozzalis.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb