סובב ועולה

📍
Wadi Neder, Hod Hacarmel, Ramat Almogi, Carmel Heights District, Haifa, Haifa Subdistrict, Haifa District, 3498825, Israel
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for סובב ועולה...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of סובב ועולה.

420 m435 m445 m460 m10.0% from 0 m to 2 m0.0% from 2 m to 4 m20.0% from 4 m to 6 m22.2% from 6 m to 8 m10.5% from 8 m to 10 m9.5% from 10 m to 12 m10.0% from 12 m to 14 m9.5% from 14 m to 16 m18.2% from 16 m to 18 m9.5% from 18 m to 20 m9.5% from 20 m to 22 m19.0% from 22 m to 24 m8.7% from 24 m to 27 m0.0% from 27 m to 29 m28.6% from 29 m to 31 m19.0% from 31 m to 33 m0.0% from 33 m to 35 m10.0% from 35 m to 37 m21.1% from 37 m to 39 m21.1% from 39 m to 41 m20.0% from 41 m to 43 m20.0% from 43 m to 45 m10.0% from 45 m to 47 m10.5% from 47 m to 49 m10.5% from 49 m to 51 m20.0% from 51 m to 53 m9.1% from 53 m to 55 m9.5% from 55 m to 57 m9.5% from 57 m to 59 m21.1% from 59 m to 61 m0.0% from 61 m to 63 m25.0% from 63 m to 64 m13.3% from 64 m to 66 m0.0% from 66 m to 67 m35.3% from 67 m to 69 m10.5% from 69 m to 71 m11.1% from 71 m to 73 m0.0% from 73 m to 75 m20.0% from 75 m to 77 m10.0% from 77 m to 79 m10.5% from 79 m to 81 m0.0% from 81 m to 82 m20.0% from 82 m to 84 m11.1% from 84 m to 86 m11.1% from 86 m to 88 m10.5% from 88 m to 90 m10.5% from 90 m to 92 m10.5% from 92 m to 94 m10.5% from 94 m to 96 m9.5% from 96 m to 98 m9.5% from 98 m to 100 m10.0% from 100 m to 102 m19.0% from 102 m to 104 m0.0% from 104 m to 106 m0.0% from 106 m to 108 m17.4% from 108 m to 111 m8.7% from 111 m to 113 m8.7% from 113 m to 115 m17.4% from 115 m to 118 m8.7% from 118 m to 120 m18.2% from 120 m to 122 m8.3% from 122 m to 124 m0.0% from 124 m to 127 m7.7% from 127 m to 130 m7.1% from 130 m to 132 m28.6% from 132 m to 135 m6.5% from 135 m to 138 m16.7% from 138 m to 142 m-10.5% from 142 m to 146 m4.9% from 146 m to 150 m0.0% from 150 m to 154 m4.5% from 154 m to 158 m18.6% from 158 m to 163 m14.0% from 163 m to 167 m4.7% from 167 m to 171 m14.0% from 171 m to 176 m22.7% from 176 m to 180 m13.6% from 180 m to 184 m4.5% from 184 m to 189 m17.4% from 189 m to 193 m4.5% from 193 m to 198 m-14.0% from 198 m to 202 m18.2% from 202 m to 207 m18.6% from 207 m to 211 m-4.5% from 211 m to 215 m4.4% from 215 m to 220 m9.1% from 220 m to 224 m9.1% from 224 m to 229 m18.2% from 229 m to 233 m-4.4% from 233 m to 237 m-13.0% from 237 m to 242 m8.5% from 242 m to 247 m29.8% from 247 m to 251 m12.5% from 251 m to 256 m-4.3% from 256 m to 261 m-8.3% from 261 m to 266 m4.3% from 266 m to 270 m8.7% from 270 m to 275 m25.5% from 275 m to 280 m4.2% from 280 m to 284 m0.0% from 284 m to 289 m12.8% from 289 m to 294 m-4.3% from 294 m to 298 m-17.0% from 298 m to 303 m12.8% from 303 m to 308 m8.3% from 308 m to 313 m16.3% from 313 m to 318 m-7.8% from 318 m to 323 m-3.9% from 323 m to 328 m-15.1% from 328 m to 333 m7.7% from 333 m to 338 m0.0% from 338 m to 343 m32.0% from 343 m to 348 m3.9% from 348 m to 354 m-11.5% from 354 m to 359 m-26.9% from 359 m to 364 m11.3% from 364 m to 369 m11.5% from 369 m to 374 m-11.5% from 374 m to 380 m7.5% from 380 m to 385 m-10.5% from 385 m to 391 m-16.9% from 391 m to 397 m-15.9% from 397 m to 403 m-5.8% from 403 m to 410 m45.9% from 410 m to 417 m-35.4% from 417 m to 425 m-25.3% from 425 m to 433 m15.2% from 433 m to 441 m-20.0% from 441 m to 449 m-7.6% from 449 m to 457 m-25.3% from 457 m to 465 m35.1% from 465 m to 472 m-2.8% from 472 m to 479 m15.2% from 479 m to 486 m16.7% from 486 m to 492 m-7.3% from 492 m to 497 m4.1% from 497 m to 502 m0.0% from 502 m to 507 m10.5% from 507 m to 510 m17.1% from 510 m to 514 m12.5% from 514 m to 517 m-32.3% from 517 m to 520 m-6.7% from 520 m to 523 m62.1% from 523 m to 526 m-35.7% from 526 m to 529 m-84.6% from 529 m to 531 m88.9% from 531 m to 534 m7.7% from 534 m to 537 m66.7% from 537 m to 539 m-32.0% from 539 m to 542 m-72.0% from 542 m to 544 m83.3% from 544 m to 547 m-40.0% from 547 m to 549 m69.2% from 549 m to 552 m22.2% from 552 m to 555 m-14.8% from 555 m to 557 m-15.4% from 557 m to 560 m-8.0% from 560 m to 562 m22.2% from 562 m to 565 m-23.1% from 565 m to 568 m91.7% from 568 m to 570 m8.3% from 570 m to 573 m-25.0% from 573 m to 575 m-43.5% from 575 m to 577 m8.3% from 577 m to 580 m-14.8% from 580 m to 582 m13.8% from 582 m to 585 m-13.8% from 585 m to 588 m0.0% from 588 m to 591 m0.0% from 591 m to 595 m-22.2% from 595 m to 598 m10.5% from 598 m to 602 m35.9% from 602 m to 606 m-51.3% from 606 m to 610 m16.2% from 610 m to 614 m6.1% from 614 m to 617 m-42.9% from 617 m to 620 m27.3% from 620 m to 622 m0.0% from 622 m to 624 m28.6% from 624 m to 625 m-30.8% from 625 m to 626 m-19.0% from 626 m to 628 m8.0% from 628 m to 631 m-6.9% from 631 m to 634 m13.3% from 634 m to 637 m-12.9% from 637 m to 640 m31.2% from 640 m to 643 m6.5% from 643 m to 646 m-6.7% from 646 m to 649 m7.1% from 649 m to 652 m-20.7% from 652 m to 655 m14.3% from 655 m to 658 m7.4% from 658 m to 660 m-7.7% from 660 m to 663 m8.7% from 663 m to 665 m11.1% from 665 m to 667 m15.4% from 667 m to 668 m13.3% from 668 m to 670 m0.0% from 670 m to 671 m0.0% from 671 m to 673 m0.0% from 673 m to 674 m-10.0% from 674 m to 676 m-40.0% from 676 m to 679 m28.6% from 679 m to 682 m6.5% from 682 m to 685 m5.7% from 685 m to 688 m-21.6% from 688 m to 692 m5.0% from 692 m to 696 m0.0% from 696 m to 700 m36.4% from 700 m to 704 m-45.8% from 704 m to 709 m-16.3% from 709 m to 714 m8.2% from 714 m to 719 m-8.2% from 719 m to 724 m4.1% from 724 m to 729 m4.3% from 729 m to 733 m17.0% from 733 m to 738 m-34.8% from 738 m to 743 m4.1% from 743 m to 748 m4.2% from 748 m to 752 m0.0% from 752 m to 757 m0.0% from 757 m to 762 m0.0% from 762 m to 766 m4.7% from 766 m to 771 m0.0% from 771 m to 775 m4.7% from 775 m to 779 m9.3% from 779 m to 784 m-18.2% from 784 m to 788 m8.7% from 788 m to 793 m4.3% from 793 m to 797 m-4.1% from 797 m to 802 m10%0%1%1%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.8 km / 0.50 miles
Elevation gain28.2 m / 93 ft
Average gradient3.5%
Maximum gradient34.3%
Elevation high455.8 m / 1,495 ft
Elevation low424.8 m / 1,394 ft
Climb difficulty score2,823.39

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Hankin to Sapir
Carmel Heights District, Haifa
0.53 km3.7%31 m
עליה יקינטון
Carmel Heights District, Haifa
0.63 km5.2%33 m
פרויד הסוף- מרמת אשכול לחורב
Carmel Heights District, Haifa
0.71 km2.4%17 m
מהמצפור לצוק
Carmel Heights District, Haifa
0.66 km5.4%35 m
Bi-yuvim up
Carmel Heights District, Haifa
1.15 km2.4%28 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,586,305th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 4,435th most difficult cycling climb of all 7,775 climbs in Israel.

📉

Places 826th out of 1,358 cycling climbs in Haifa District.

Ranks 130th out of 196 cycling climbs in Haifa.

Ranking 44th out of 58 cycling climbs in Carmel Heights District.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb