Before the concrete runs out

📍
Jalan Pasirjambu - Pangalengan, Kampung Cibuluh, Bandung, West Java, Java, 40378, Indonesia

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)59.8 m
Distance (Kilometers)4.94 km
Average Gradient1.2%
Climb CategoryUncategorised

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)3.07 miles
Distance (Raw)4,944.2 m
Elevation High1,482.3 m
Elevation Low1,382.9 m
Maximum Gradient28.6%
Climb Difficulty Score5,982.48

Social Climbing

All the important climbing popularity information.

💪

There are 919 recorded attempts by 436 individual cyclists.

📈

That's an average of 2.11 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 959,372nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 5,862nd most difficult cycling climb of all 13,649 climbs in Indonesia.

📉

Places 1,724th out of 3,389 cycling climbs in West Java.

Ranks 218th out of 338 cycling climbs in Bandung.

🥈️

This is the second most difficult cycling climb in Kampung Cibuluh.

The Latest Cycling News