500m Nanjak Gn. Pembangunan
📍 Lapangan Sepakbola Vorfoo, Jalan Cempedak, Sidodadi, Samarinda Ulu, Samarinda, East Kalimantan, Kalimantan, 75124, Indonesia
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 23.3 m |
Distance (Kilometers) | 0.5 km |
Average Gradient | 4.7% |
Climb Category | Uncategorised |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 0.31 miles |
Distance (Raw) | 500.9 m |
Elevation High | 29 m |
Elevation Low | 5 m |
Maximum Gradient | 20.9% |
Climb Difficulty Score | 2,329.18 |
Social Climbing
All the important climbing popularity information.
💪 There are 12,602 recorded attempts by 1,537 individual cyclists. |
📈 That's an average of 8.20 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 1,752,009th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 9,164th most difficult cycling climb of all 13,649 climbs in Indonesia. |
📉 Places 120th out of 251 cycling climbs in East Kalimantan. |
🏵️ Get your legs ready, this is the 7th most difficult cycling climb (out of 19 climbs) in Samarinda. |
🥉 This is the third most difficult cycling climb in Samarinda Ulu. |