AFTER RAILWAYS

📍
Jalan Perusahaan, Sekargadung, anjararum, Kabupaten Malang, East Java, Java, 65153, Indonesia

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)153.9 m
Distance (Kilometers)6.7 km
Average Gradient2.2%
Climb CategoryCategory 4

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)4.17 miles
Distance (Raw)6,703.1 m
Elevation High620.4 m
Elevation Low472.4 m
Maximum Gradient8%
Climb Difficulty Score14,746.82

Social Climbing

All the important climbing popularity information.

💪

There are 10,888 recorded attempts by 2,368 individual cyclists.

📈

That's an average of 4.60 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 346,989th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 2,828th most difficult cycling climb of all 13,649 climbs in Indonesia.

📉

Places 654th out of 2,133 cycling climbs in East Java.

Ranks 102nd out of 300 cycling climbs in Kabupaten Malang.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 15 climbs) in anjararum.

The Latest Cycling News