AFTER RAILWAYS
📍 Jalan Perusahaan, Sekargadung, anjararum, Kabupaten Malang, East Java, Java, 65153, Indonesia
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 153.9 m |
Distance (Kilometers) | 6.7 km |
Average Gradient | 2.2% |
Climb Category | Category 4 |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 4.17 miles |
Distance (Raw) | 6,703.1 m |
Elevation High | 620.4 m |
Elevation Low | 472.4 m |
Maximum Gradient | 8% |
Climb Difficulty Score | 14,746.82 |
Social Climbing
All the important climbing popularity information.
💪 There are 10,888 recorded attempts by 2,368 individual cyclists. |
📈 That's an average of 4.60 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 346,989th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 2,828th most difficult cycling climb of all 13,649 climbs in Indonesia. |
📉 Places 654th out of 2,133 cycling climbs in East Java. |
⚖ Ranks 102nd out of 300 cycling climbs in Kabupaten Malang. |
🏵️ A local climb of note, this is the 5th most difficult cycling climb (out of 15 climbs) in anjararum. |