Smooth climb before the broken road.
📍 Jalan Raya Umabali, Petiga, Tabanan, Bali, Lesser Sunda Islands, 82191, Indonesia
Useful Links
View this climb on other sites.
Google Street View |
Strava |
Climb Stats
The most common and useful climbing metrics.
Climb (Meters) | 89 m |
Distance (Kilometers) | 3.4 km |
Average Gradient | 2.6% |
Climb Category | Category 4 |
Detailed Climb Stats
Stuff for climbing nerds.
Distance (Miles) | 2.11 miles |
Distance (Raw) | 3,403.2 m |
Elevation High | 414.4 m |
Elevation Low | 325.4 m |
Maximum Gradient | 9% |
Climb Difficulty Score | 8,916.38 |
Social Climbing
All the important climbing popularity information.
💪 There are 83 recorded attempts by 53 individual cyclists. |
📈 That's an average of 1.57 attempts per cyclist. |
😞 No one has favourited this climb. |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 658,491st out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 4,512th most difficult cycling climb of all 13,649 climbs in Indonesia. |
📉 Places 253rd out of 826 cycling climbs in Bali. |
⚖ Ranks 54th out of 111 cycling climbs in Tabanan. |
🙈 This is the easiest cycling climb in Petiga. |