[EN] Heilkenstraße - Vogelsanger Straße (B234)

📍
69, Grundschötteler Straße, Grundschöttel, Wetter (Ruhr), Ennepe-Ruhr-Kreis, North Rhine – Westphalia, 58300, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for [EN] Heilkenstraße - Vogelsanger Straße (B234)...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of [EN] Heilkenstraße - Vogelsanger Straße (B234).

180 m195 m205 m220 m0.0% from 0 m to 5 m0.0% from 5 m to 9 m0.0% from 9 m to 14 m4.3% from 14 m to 19 m0.0% from 19 m to 23 m0.0% from 23 m to 28 m4.2% from 28 m to 33 m0.0% from 33 m to 38 m0.0% from 38 m to 43 m4.1% from 43 m to 48 m0.0% from 48 m to 52 m0.0% from 52 m to 57 m0.0% from 57 m to 62 m4.1% from 62 m to 67 m0.0% from 67 m to 72 m0.0% from 72 m to 77 m0.0% from 77 m to 82 m4.3% from 82 m to 86 m4.1% from 86 m to 91 m3.8% from 91 m to 97 m0.0% from 97 m to 101 m0.0% from 101 m to 106 m4.3% from 106 m to 111 m4.4% from 111 m to 115 m4.8% from 115 m to 119 m4.7% from 119 m to 124 m5.1% from 124 m to 127 m5.4% from 127 m to 131 m10.8% from 131 m to 135 m5.1% from 135 m to 139 m5.4% from 139 m to 142 m5.6% from 142 m to 146 m5.7% from 146 m to 150 m5.9% from 150 m to 153 m12.9% from 153 m to 156 m6.7% from 156 m to 159 m6.7% from 159 m to 162 m13.3% from 162 m to 165 m6.1% from 165 m to 168 m6.7% from 168 m to 171 m12.9% from 171 m to 174 m6.2% from 174 m to 178 m6.5% from 178 m to 181 m6.3% from 181 m to 184 m6.5% from 184 m to 187 m6.7% from 187 m to 190 m13.3% from 190 m to 193 m6.5% from 193 m to 196 m6.5% from 196 m to 199 m6.5% from 199 m to 202 m6.7% from 202 m to 205 m13.3% from 205 m to 208 m6.3% from 208 m to 212 m6.7% from 212 m to 215 m6.7% from 215 m to 218 m14.8% from 218 m to 220 m6.7% from 220 m to 223 m6.5% from 223 m to 226 m13.3% from 226 m to 229 m6.7% from 229 m to 232 m6.5% from 232 m to 235 m12.9% from 235 m to 239 m6.5% from 239 m to 242 m6.3% from 242 m to 245 m6.1% from 245 m to 248 m6.5% from 248 m to 251 m6.7% from 251 m to 254 m6.5% from 254 m to 257 m0.0% from 257 m to 260 m12.9% from 260 m to 263 m6.7% from 263 m to 266 m6.5% from 266 m to 270 m6.7% from 270 m to 273 m6.1% from 273 m to 276 m6.5% from 276 m to 279 m14.3% from 279 m to 282 m13.3% from 282 m to 285 m7.1% from 285 m to 288 m6.7% from 288 m to 291 m6.9% from 291 m to 293 m6.9% from 293 m to 296 m8.0% from 296 m to 299 m5.4% from 299 m to 303 m6.7% from 303 m to 306 m6.5% from 306 m to 309 m6.5% from 309 m to 312 m6.9% from 312 m to 315 m13.8% from 315 m to 318 m6.5% from 318 m to 321 m13.8% from 321 m to 324 m6.7% from 324 m to 327 m6.5% from 327 m to 330 m0.0% from 330 m to 333 m12.9% from 333 m to 336 m6.5% from 336 m to 339 m13.3% from 339 m to 342 m6.5% from 342 m to 345 m6.9% from 345 m to 348 m13.3% from 348 m to 351 m6.9% from 351 m to 354 m12.9% from 354 m to 357 m6.7% from 357 m to 360 m6.7% from 360 m to 363 m6.9% from 363 m to 366 m6.3% from 366 m to 369 m6.7% from 369 m to 372 m7.1% from 372 m to 375 m6.7% from 375 m to 378 m6.9% from 378 m to 381 m6.7% from 381 m to 384 m6.7% from 384 m to 387 m7.7% from 387 m to 389 m5.9% from 389 m to 393 m13.8% from 393 m to 396 m6.9% from 396 m to 398 m6.9% from 398 m to 401 m0.0% from 401 m to 405 m0.0% from 405 m to 407 m6.9% from 407 m to 410 m6.7% from 410 m to 413 m7.1% from 413 m to 416 m13.8% from 416 m to 419 m6.1% from 419 m to 422 m6.7% from 422 m to 425 m6.5% from 425 m to 428 m6.7% from 428 m to 431 m13.3% from 431 m to 434 m6.7% from 434 m to 437 m0.0% from 437 m to 441 m6.7% from 441 m to 444 m6.9% from 444 m to 447 m6.9% from 447 m to 450 m6.7% from 450 m to 453 m6.9% from 453 m to 455 m6.5% from 455 m to 459 m7.1% from 459 m to 461 m6.7% from 461 m to 464 m6.9% from 464 m to 467 m7.1% from 467 m to 470 m6.7% from 470 m to 473 m0.0% from 473 m to 476 m7.7% from 476 m to 479 m5.7% from 479 m to 482 m6.5% from 482 m to 485 m6.5% from 485 m to 488 m6.7% from 488 m to 491 m6.5% from 491 m to 494 m6.5% from 494 m to 498 m6.9% from 498 m to 500 m6.1% from 500 m to 504 m6.9% from 504 m to 507 m6.5% from 507 m to 510 m0.0% from 510 m to 513 m6.5% from 513 m to 516 m6.5% from 516 m to 519 m6.7% from 519 m to 522 m6.5% from 522 m to 525 m6.3% from 525 m to 528 m0.0% from 528 m to 531 m6.5% from 531 m to 534 m6.5% from 534 m to 538 m6.5% from 538 m to 541 m6.5% from 541 m to 544 m6.5% from 544 m to 547 m0.0% from 547 m to 550 m6.3% from 550 m to 553 m7.1% from 553 m to 556 m7.4% from 556 m to 559 m7.1% from 559 m to 562 m0.0% from 562 m to 564 m6.9% from 564 m to 567 m0.0% from 567 m to 570 m6.9% from 570 m to 573 m0.0% from 573 m to 576 m6.7% from 576 m to 579 m6.7% from 579 m to 582 m13.3% from 582 m to 585 m0.0% from 585 m to 588 m7.4% from 588 m to 591 m6.5% from 591 m to 594 m6.9% from 594 m to 597 m6.9% from 597 m to 600 m6.1% from 600 m to 603 m0.0% from 603 m to 606 m6.5% from 606 m to 609 m0.0% from 609 m to 612 m6.9% from 612 m to 615 m0.0% from 615 m to 618 m6.1% from 618 m to 621 m0.0% from 621 m to 624 m0.0% from 624 m to 628 m5.7% from 628 m to 631 m5.6% from 631 m to 635 m0.0% from 635 m to 639 m5.9% from 639 m to 642 m0.0% from 642 m to 646 m5.7% from 646 m to 649 m5.7% from 649 m to 653 m0.0% from 653 m to 656 m5.3% from 656 m to 660 m0.0% from 660 m to 663 m0.0% from 663 m to 667 m0.0% from 667 m to 670 m5.6% from 670 m to 674 m0.0% from 674 m to 677 m0.0% from 677 m to 681 m0.0% from 681 m to 686 m4.9% from 686 m to 690 m0.0% from 690 m to 693 m5.7% from 693 m to 697 m5.9% from 697 m to 700 m0.0% from 700 m to 704 m0.0% from 704 m to 707 m0.0% from 707 m to 711 m5.7% from 711 m to 714 m0.0% from 714 m to 718 m0.0% from 718 m to 721 m5.3% from 721 m to 725 m0.0% from 725 m to 729 m0.0% from 729 m to 734 m0.0% from 734 m to 740 m0.0% from 740 m to 744 m0.0% from 744 m to 750 m0.0% from 750 m to 755 m0.0% from 755 m to 760 m0.0% from 760 m to 766 m-3.5% from 766 m to 772 m0.0% from 772 m to 777 m0.0% from 777 m to 782 m0.0% from 782 m to 787 m-3.8% from 787 m to 792 m0.0% from 792 m to 797 m0.0% from 797 m to 803 m0.0% from 803 m to 809 m-3.3% from 809 m to 815 m0.0% from 815 m to 821 m-3.3% from 821 m to 827 m0.0% from 827 m to 833 m0.0% from 833 m to 839 m0.0% from 839 m to 845 m0.0% from 845 m to 851 m0.0% from 851 m to 858 m-3.0% from 858 m to 864 m0.0% from 864 m to 870 m-3.2% from 870 m to 876 m3.0% from 876 m to 883 m-3.2% from 883 m to 889 m-3.3% from 889 m to 895 m0.0% from 895 m to 903 m0.0% from 903 m to 912 m-2.4% from 912 m to 920 m0.0% from 920 m to 929 m-2.4% from 929 m to 937 m0.0% from 937 m to 944 m-2.1% from 944 m to 954 m-2.6% from 954 m to 961 m0.0% from 961 m to 969 m-2.7% from 969 m to 977 m0.0% from 977 m to 985 m0.0% from 985 m to 993 m-2.2% from 993 m to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.7% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km-2.8% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-2.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-2.6% from 1.1 km to 1.1 km-2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-2.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-3.0% from 1.1 km to 1.1 km-3.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.2 km5%7%3%-1%-1%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.15 km / 0.72 miles
Elevation gain34.8 m / 114 ft
Average gradient3%
Maximum gradient10.3%
Elevation high218.4 m / 717 ft
Elevation low180 m / 591 ft
Climb difficulty score3,475.72

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Am Hasenkamp Climb 1
Wetter (Ruhr), Ennepe-Ruhr-Kreis
0.92 km4%37 m
Wetterberg
Wetter (Ruhr), Ennepe-Ruhr-Kreis
0.83 km3.8%35 m
[EN] Am Overbeck - Am Zippe (Altenhains Berg)
Wetter (Ruhr), Ennepe-Ruhr-Kreis
1.25 km4.4%54 m
Zum Elberg hoch
Wetter (Ruhr), Ennepe-Ruhr-Kreis
0.84 km4.2%35 m
Rauf auf die Egge
Wetter (Ruhr), Ennepe-Ruhr-Kreis
0.83 km4%33 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,406,505th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 107,090th most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 13,919th out of 27,322 cycling climbs in North Rhine – Westphalia.

Ranks 723rd out of 1,067 cycling climbs in Ennepe-Ruhr-Kreis.

Ranking 89th out of 126 cycling climbs in Wetter (Ruhr).

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb