Kaiserberg - Von Schnabelhuck

📍
Gottfried-Kinkel-Straße, Duissern, Duisburg-Mitte, Duisburg, North Rhine – Westphalia, 47058, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Kaiserberg - Von Schnabelhuck...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Kaiserberg - Von Schnabelhuck.

45 m55 m70 m80 m15.4% from 0 m to 4 m10.3% from 4 m to 8 m10.5% from 8 m to 12 m10.5% from 12 m to 15 m10.8% from 15 m to 19 m10.0% from 19 m to 24 m11.6% from 24 m to 28 m10.9% from 28 m to 33 m10.2% from 33 m to 38 m20.0% from 38 m to 42 m10.0% from 42 m to 46 m11.4% from 46 m to 51 m8.9% from 51 m to 55 m8.9% from 55 m to 60 m10.6% from 60 m to 65 m10.0% from 65 m to 70 m9.8% from 70 m to 75 m8.2% from 75 m to 80 m31.8% from 80 m to 84 m15.0% from 84 m to 88 m12.5% from 88 m to 92 m12.2% from 92 m to 96 m12.8% from 96 m to 100 m13.2% from 100 m to 104 m10.0% from 104 m to 108 m11.1% from 108 m to 111 m10.3% from 111 m to 115 m12.2% from 115 m to 119 m9.3% from 119 m to 124 m10.3% from 124 m to 128 m7.5% from 128 m to 132 m9.4% from 132 m to 135 m8.8% from 135 m to 138 m8.6% from 138 m to 142 m8.3% from 142 m to 145 m9.1% from 145 m to 149 m8.8% from 149 m to 152 m10.0% from 152 m to 155 m9.4% from 155 m to 158 m10.8% from 158 m to 162 m12.5% from 162 m to 165 m10.0% from 165 m to 168 m12.5% from 168 m to 171 m10.3% from 171 m to 174 m9.7% from 174 m to 177 m12.9% from 177 m to 180 m11.5% from 180 m to 183 m8.7% from 183 m to 185 m13.0% from 185 m to 188 m10.5% from 188 m to 189 m8.7% from 189 m to 192 m12.5% from 192 m to 194 m7.1% from 194 m to 197 m11.5% from 197 m to 200 m11.1% from 200 m to 202 m8.0% from 202 m to 205 m5.3% from 205 m to 207 m11.8% from 207 m to 208 m8.3% from 208 m to 210 m0.0% from 210 m to 210 m16.7% from 210 m to 211 m9.2% from 211 m to 223 m8.7% from 223 m to 225 m7.7% from 225 m to 228 m6.1% from 228 m to 231 m6.5% from 231 m to 234 m8.0% from 234 m to 237 m4.8% from 237 m to 239 m4.8% from 239 m to 241 m7.7% from 241 m to 243 m4.5% from 243 m to 246 m4.5% from 246 m to 248 m4.3% from 248 m to 250 m4.2% from 250 m to 253 m3.7% from 253 m to 255 m3.7% from 255 m to 258 m4.2% from 258 m to 260 m3.4% from 260 m to 263 m3.3% from 263 m to 266 m3.1% from 266 m to 269 m3.3% from 269 m to 272 m3.3% from 272 m to 275 m6.3% from 275 m to 279 m3.6% from 279 m to 281 m3.3% from 281 m to 284 m4.0% from 284 m to 287 m4.2% from 287 m to 289 m4.5% from 289 m to 292 m6.7% from 292 m to 293 m4.5% from 293 m to 295 m0.0% from 295 m to 298 m3.3% from 298 m to 301 m6.7% from 301 m to 304 m3.7% from 304 m to 306 m3.1% from 306 m to 309 m0.0% from 309 m to 313 m0.0% from 313 m to 316 m0.0% from 316 m to 320 m2.8% from 320 m to 323 m0.0% from 323 m to 327 m0.0% from 327 m to 331 m0.0% from 331 m to 335 m0.0% from 335 m to 339 m0.0% from 339 m to 343 m0.0% from 343 m to 347 m0.0% from 347 m to 351 m0.0% from 351 m to 355 m0.0% from 355 m to 358 m-2.6% from 358 m to 362 m0.0% from 362 m to 366 m0.0% from 366 m to 369 m0.0% from 369 m to 373 m0.0% from 373 m to 376 m0.0% from 376 m to 379 m0.0% from 379 m to 383 m0.0% from 383 m to 387 m0.0% from 387 m to 390 m0.0% from 390 m to 394 m0.0% from 394 m to 397 m0.0% from 397 m to 401 m0.0% from 401 m to 405 m0.0% from 405 m to 409 m0.0% from 409 m to 414 m0.0% from 414 m to 418 m0.0% from 418 m to 421 m2.7% from 421 m to 425 m0.0% from 425 m to 429 m0.0% from 429 m to 432 m2.7% from 432 m to 436 m0.0% from 436 m to 440 m0.0% from 440 m to 444 m2.6% from 444 m to 448 m0.0% from 448 m to 451 m0.0% from 451 m to 454 m2.9% from 454 m to 458 m0.0% from 458 m to 461 m0.0% from 461 m to 465 m3.1% from 465 m to 468 m2.9% from 468 m to 471 m0.0% from 471 m to 474 m3.3% from 474 m to 477 m3.2% from 477 m to 480 m0.0% from 480 m to 483 m4.0% from 483 m to 486 m4.3% from 486 m to 488 m0.0% from 488 m to 490 m4.0% from 490 m to 493 m18.5% from 493 m to 495 m0.0% from 495 m to 498 m3.8% from 498 m to 501 m0.0% from 501 m to 504 m3.3% from 504 m to 507 m0.0% from 507 m to 510 m6.1% from 510 m to 513 m0.0% from 513 m to 517 m2.7% from 517 m to 520 m0.0% from 520 m to 525 m2.2% from 525 m to 529 m0.0% from 529 m to 534 m1.8% from 534 m to 539 m0.0% from 539 m to 545 m1.9% from 545 m to 550 m1.8% from 550 m to 556 m0.0% from 556 m to 562 m0.0% from 562 m to 568 m0.0% from 568 m to 575 m1.5% from 575 m to 581 m0.0% from 581 m to 588 m2.9% from 588 m to 595 m1.6% from 595 m to 602 m0.0% from 602 m to 609 m-2.9% from 609 m to 616 m0.0% from 616 m to 623 m-3.9% from 623 m to 631 m0.0% from 631 m to 638 m0.0% from 638 m to 646 m0.0% from 646 m to 653 m-1.3% from 653 m to 661 m-1.3% from 661 m to 669 m-1.2% from 669 m to 677 m0.0% from 677 m to 685 m-1.1% from 685 m to 694 m-1.1% from 694 m to 703 m-1.1% from 703 m to 712 m-1.1% from 712 m to 721 m-2.2% from 721 m to 730 m-1.1% from 730 m to 739 m-2.1% from 739 m to 749 m-4.4% from 749 m to 758 m-8.2% from 758 m to 767 m-5.1% from 767 m to 777 m-4.0% from 777 m to 787 m-3.0% from 787 m to 797 m-4.6% from 797 m to 808 m-4.6% from 808 m to 819 m-4.5% from 819 m to 830 m-4.5% from 830 m to 841 m-6.0% from 841 m to 853 m-5.5% from 853 m to 864 m-6.3% from 864 m to 875 m-4.5% from 875 m to 886 m-4.3% from 886 m to 898 m-6.0% from 898 m to 909 m-4.2% from 909 m to 921 m-3.4% from 921 m to 933 m-6.1% from 933 m to 944 m-4.3% from 944 m to 956 m-5.0% from 956 m to 968 m-6.7% from 968 m to 980 m-6.7% from 980 m to 992 m-4.0% from 992 m to 1.0 km-4.8% from 1.0 km to 1.0 km-4.8% from 1.0 km to 1.0 km-4.1% from 1.0 km to 1.0 km-3.2% from 1.0 km to 1.1 km-1.8% from 1.1 km to 1.1 km-2.0% from 1.1 km to 1.1 km-2.0% from 1.1 km to 1.1 km-1.0% from 1.1 km to 1.1 km-2.0% from 1.1 km to 1.1 km-3.9% from 1.1 km to 1.1 km-5.9% from 1.1 km to 1.1 km-7.0% from 1.1 km to 1.1 km-6.9% from 1.1 km to 1.1 km-5.1% from 1.1 km to 1.2 km-6.1% from 1.2 km to 1.2 km-7.2% from 1.2 km to 1.2 km-5.4% from 1.2 km to 1.2 km-6.2% from 1.2 km to 1.2 km-7.1% from 1.2 km to 1.2 km-6.3% from 1.2 km to 1.2 km10%2%-0%-5%-5%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.21 km / 0.75 miles
Elevation gain7.7 m / 25 ft
Average gradient0.6%
Maximum gradient18.2%
Elevation high78.5 m / 258 ft
Elevation low47.1 m / 155 ft
Climb difficulty score771.39

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
auf nach Mülheim
Duisburg-Mitte, Duisburg
1.06 km0.7%8 m
Nach Hause 2
Duisburg-Mitte, Duisburg
1.09 km0.5%5 m
Ab zu Uschi
Duisburg-Mitte, Duisburg
1.75 km0.5%8 m
Waldfriedhof (Nord/Süd)
Duisburg-Mitte, Duisburg
0.72 km0.9%7 m
Berg und Tal W-O
Duisburg-Mitte, Duisburg
1.07 km1.5%16 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,487,622nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 188,811th most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 24,934th out of 27,322 cycling climbs in North Rhine – Westphalia.

Ranks 52nd out of 76 cycling climbs in Duisburg.

Ranking 24th out of 31 cycling climbs in Duisburg-Mitte.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb