Parallel zur B75

📍
5, Kesselhofskamp, Rotenburg, Landkreis Rotenburg (Wümme), Lower Saxony, 27356, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Parallel zur B75...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Parallel zur B75.

20 m25 m35 m40 m1.3% from 0 m to 8 m0.0% from 8 m to 15 m1.4% from 15 m to 22 m1.4% from 22 m to 29 m1.4% from 29 m to 36 m1.5% from 36 m to 43 m1.4% from 43 m to 50 m0.0% from 50 m to 57 m0.0% from 57 m to 64 m0.0% from 64 m to 71 m0.0% from 71 m to 79 m0.0% from 79 m to 86 m0.0% from 86 m to 94 m0.0% from 94 m to 101 m0.0% from 101 m to 107 m1.4% from 107 m to 114 m3.2% from 114 m to 120 m1.4% from 120 m to 128 m2.9% from 128 m to 134 m1.5% from 134 m to 141 m2.9% from 141 m to 148 m2.6% from 148 m to 156 m1.4% from 156 m to 163 m2.9% from 163 m to 170 m1.4% from 170 m to 177 m1.4% from 177 m to 183 m1.4% from 183 m to 190 m1.5% from 190 m to 197 m1.4% from 197 m to 204 m2.9% from 204 m to 211 m1.6% from 211 m to 217 m2.8% from 217 m to 224 m5.7% from 224 m to 231 m4.6% from 231 m to 247 m5.7% from 247 m to 254 m4.3% from 254 m to 261 m5.5% from 261 m to 268 m5.6% from 268 m to 273 m3.3% from 273 m to 279 m3.4% from 279 m to 285 m4.7% from 285 m to 292 m3.0% from 292 m to 298 m3.1% from 298 m to 305 m3.6% from 305 m to 310 m3.3% from 310 m to 316 m3.5% from 316 m to 322 m3.8% from 322 m to 330 m-1.6% from 330 m to 336 m-4.5% from 336 m to 343 m-6.1% from 343 m to 349 m-4.7% from 349 m to 356 m-4.9% from 356 m to 362 m-5.9% from 362 m to 370 m-5.3% from 370 m to 378 m-4.6% from 378 m to 384 m-4.3% from 384 m to 391 m-2.8% from 391 m to 398 m-4.4% from 398 m to 405 m-4.0% from 405 m to 413 m-3.0% from 413 m to 419 m-4.1% from 419 m to 427 m-2.9% from 427 m to 434 m-3.1% from 434 m to 440 m-3.8% from 440 m to 448 m-3.1% from 448 m to 454 m-3.0% from 454 m to 461 m-2.4% from 461 m to 469 m-3.9% from 469 m to 477 m-1.5% from 477 m to 484 m0.0% from 484 m to 491 m0.0% from 491 m to 498 m0.0% from 498 m to 504 m0.0% from 504 m to 510 m0.0% from 510 m to 516 m-1.1% from 516 m to 525 m0.0% from 525 m to 530 m0.0% from 530 m to 536 m0.0% from 536 m to 544 m1.3% from 544 m to 551 m0.0% from 551 m to 558 m0.0% from 558 m to 565 m0.0% from 565 m to 572 m0.0% from 572 m to 579 m0.0% from 579 m to 587 m0.0% from 587 m to 593 m0.0% from 593 m to 600 m0.0% from 600 m to 605 m0.0% from 605 m to 611 m1.6% from 611 m to 617 m3.2% from 617 m to 623 m3.4% from 623 m to 629 m3.2% from 629 m to 635 m4.8% from 635 m to 641 m2.9% from 641 m to 648 m4.0% from 648 m to 653 m3.7% from 653 m to 659 m3.7% from 659 m to 664 m4.0% from 664 m to 669 m1.9% from 669 m to 675 m3.8% from 675 m to 680 m1.8% from 680 m to 685 m3.8% from 685 m to 691 m2.1% from 691 m to 695 m2.1% from 695 m to 700 m3.4% from 700 m to 706 m2.2% from 706 m to 711 m3.7% from 711 m to 716 m3.4% from 716 m to 722 m1.9% from 722 m to 727 m4.8% from 727 m to 731 m3.2% from 731 m to 738 m3.8% from 738 m to 743 m3.6% from 743 m to 748 m3.2% from 748 m to 755 m3.6% from 755 m to 760 m1.7% from 760 m to 766 m3.5% from 766 m to 772 m3.4% from 772 m to 778 m3.6% from 778 m to 783 m1.7% from 783 m to 789 m0.0% from 789 m to 795 m1.9% from 795 m to 800 m1.8% from 800 m to 806 m1.8% from 806 m to 811 m0.0% from 811 m to 817 m1.8% from 817 m to 823 m1.9% from 823 m to 828 m1.9% from 828 m to 834 m0.0% from 834 m to 839 m1.9% from 839 m to 845 m3.8% from 845 m to 850 m3.0% from 850 m to 856 m1.8% from 856 m to 862 m2.6% from 862 m to 866 m5.4% from 866 m to 870 m2.3% from 870 m to 874 m2.1% from 874 m to 879 m3.6% from 879 m to 884 m4.1% from 884 m to 889 m2.1% from 889 m to 894 m4.4% from 894 m to 899 m2.1% from 899 m to 903 m0.0% from 903 m to 908 m2.2% from 908 m to 913 m2.3% from 913 m to 917 m2.3% from 917 m to 921 m0.0% from 921 m to 926 m2.2% from 926 m to 930 m2.3% from 930 m to 935 m2.3% from 935 m to 939 m0.0% from 939 m to 943 m2.3% from 943 m to 948 m2.4% from 948 m to 956 m0.0% from 956 m to 961 m2.3% from 961 m to 965 m2.2% from 965 m to 970 m2.3% from 970 m to 974 m0.0% from 974 m to 979 m2.3% from 979 m to 983 m2.2% from 983 m to 988 m2.2% from 988 m to 992 m2.2% from 992 m to 997 m0.0% from 997 m to 1.0 km2.4% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.3% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km4.0% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km3.9% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km4.2% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.2 km4.2% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.2 km3.9% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km2.3% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km2.3% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km-1.8% from 1.2 km to 1.3 km0.0% from 1.3 km to 1.3 km-1.5% from 1.3 km to 1.3 km-1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-1.7% from 1.3 km to 1.3 km-1.9% from 1.3 km to 1.3 km-1.8% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-1.6% from 1.3 km to 1.3 km-1.7% from 1.3 km to 1.3 km-1.4% from 1.3 km to 1.3 km-1.5% from 1.3 km to 1.3 km2%-1%2%2%2%-1%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.33 km / 0.82 miles
Elevation gain15.6 m / 51 ft
Average gradient1.2%
Maximum gradient3.8%
Elevation high40 m / 131 ft
Elevation low23.4 m / 77 ft
Climb difficulty score1,566.57

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Stellmoor Forst
Rotenburg, Landkreis Rotenburg (Wümme)
1.43 km1.5%40 m
Waffensen uphill
Rotenburg, Landkreis Rotenburg (Wümme)
0.81 km2%16 m
Durch den Luhner Forst
Rotenburg, Landkreis Rotenburg (Wümme)
2.12 km1.5%34 m
Zum Kesselhof Climb
Rotenburg, Landkreis Rotenburg (Wümme)
1.19 km0.5%6 m
Von Obi bis zur Brücke
Rotenburg, Landkreis Rotenburg (Wümme)
0.84 km0.6%5 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,064,643rd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 156,901st most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 6,875th out of 11,061 cycling climbs in Lower Saxony.

Ranks 39th out of 125 cycling climbs in Landkreis Rotenburg (Wümme).

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 8 climbs) in Rotenburg.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb