UP Alte Sinsheimer Straße

📍
1, Pfarrstraße, Bleichwiesen, Waibstadt, Verwaltungsverband Waibstadt, Rhein-Neckar-Kreis, Baden-Württemberg, 74915, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for UP Alte Sinsheimer Straße...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of UP Alte Sinsheimer Straße.

170 m190 m215 m235 m4.8% from 0 m to 4 m4.3% from 4 m to 9 m5.1% from 9 m to 15 m7.3% from 15 m to 19 m4.8% from 19 m to 23 m15.6% from 23 m to 26 m7.5% from 26 m to 32 m5.6% from 32 m to 37 m8.9% from 37 m to 42 m6.4% from 42 m to 46 m7.3% from 46 m to 50 m5.9% from 50 m to 54 m8.5% from 54 m to 58 m5.6% from 58 m to 62 m8.6% from 62 m to 66 m5.0% from 66 m to 70 m8.7% from 70 m to 74 m5.7% from 74 m to 79 m8.3% from 79 m to 83 m7.7% from 83 m to 87 m6.3% from 87 m to 90 m7.1% from 90 m to 94 m6.4% from 94 m to 99 m7.3% from 99 m to 103 m7.3% from 103 m to 107 m8.0% from 107 m to 110 m3.8% from 110 m to 112 m7.1% from 112 m to 117 m7.5% from 117 m to 122 m7.7% from 122 m to 126 m3.8% from 126 m to 131 m2.5% from 131 m to 135 m4.8% from 135 m to 139 m2.9% from 139 m to 146 m2.6% from 146 m to 150 m2.4% from 150 m to 154 m2.4% from 154 m to 158 m1.8% from 158 m to 164 m1.7% from 164 m to 170 m2.0% from 170 m to 175 m0.0% from 175 m to 179 m1.1% from 179 m to 189 m1.5% from 189 m to 195 m1.9% from 195 m to 201 m0.0% from 201 m to 206 m1.4% from 206 m to 214 m0.0% from 214 m to 218 m2.1% from 218 m to 223 m0.0% from 223 m to 228 m2.7% from 228 m to 231 m1.5% from 231 m to 238 m1.8% from 238 m to 244 m1.9% from 244 m to 249 m0.0% from 249 m to 254 m2.0% from 254 m to 259 m1.9% from 259 m to 264 m3.8% from 264 m to 270 m2.6% from 270 m to 274 m1.7% from 274 m to 279 m2.0% from 279 m to 285 m1.9% from 285 m to 290 m3.8% from 290 m to 295 m2.0% from 295 m to 300 m2.0% from 300 m to 305 m2.1% from 305 m to 315 m1.4% from 315 m to 322 m1.5% from 322 m to 328 m1.7% from 328 m to 334 m2.0% from 334 m to 339 m1.9% from 339 m to 345 m1.6% from 345 m to 351 m2.4% from 351 m to 359 m1.7% from 359 m to 365 m4.1% from 365 m to 370 m2.6% from 370 m to 374 m2.9% from 374 m to 381 m1.8% from 381 m to 386 m3.7% from 386 m to 394 m5.3% from 394 m to 398 m0.0% from 398 m to 402 m4.1% from 402 m to 409 m0.0% from 409 m to 413 m0.0% from 413 m to 416 m1.3% from 416 m to 424 m1.5% from 424 m to 431 m3.1% from 431 m to 437 m1.5% from 437 m to 444 m2.1% from 444 m to 449 m1.6% from 449 m to 455 m2.0% from 455 m to 460 m3.8% from 460 m to 468 m2.0% from 468 m to 473 m3.9% from 473 m to 478 m3.7% from 478 m to 483 m3.7% from 483 m to 491 m2.0% from 491 m to 496 m3.6% from 496 m to 505 m4.7% from 505 m to 511 m3.7% from 511 m to 519 m3.4% from 519 m to 525 m5.4% from 525 m to 530 m4.5% from 530 m to 535 m4.4% from 535 m to 539 m4.0% from 539 m to 544 m4.3% from 544 m to 551 m6.3% from 551 m to 558 m3.8% from 558 m to 563 m6.4% from 563 m to 568 m2.9% from 568 m to 574 m5.3% from 574 m to 580 m5.3% from 580 m to 586 m4.7% from 586 m to 590 m4.8% from 590 m to 596 m5.7% from 596 m to 602 m5.0% from 602 m to 608 m3.5% from 608 m to 613 m6.1% from 613 m to 617 m5.3% from 617 m to 626 m5.4% from 626 m to 630 m4.2% from 630 m to 635 m4.7% from 635 m to 641 m4.9% from 641 m to 645 m4.7% from 645 m to 649 m5.4% from 649 m to 653 m9.1% from 653 m to 656 m3.1% from 656 m to 660 m3.8% from 660 m to 665 m5.7% from 665 m to 670 m4.0% from 670 m to 675 m4.9% from 675 m to 683 m4.0% from 683 m to 688 m4.3% from 688 m to 693 m3.9% from 693 m to 698 m6.8% from 698 m to 705 m6.1% from 705 m to 710 m8.9% from 710 m to 716 m6.4% from 716 m to 721 m8.2% from 721 m to 725 m10.0% from 725 m to 729 m7.3% from 729 m to 734 m9.1% from 734 m to 738 m10.8% from 738 m to 742 m8.7% from 742 m to 746 m8.5% from 746 m to 752 m10.6% from 752 m to 757 m9.7% from 757 m to 760 m8.6% from 760 m to 763 m14.8% from 763 m to 766 m3.7% from 766 m to 769 m12.9% from 769 m to 772 m3.2% from 772 m to 775 m9.4% from 775 m to 778 m3.1% from 778 m to 781 m11.1% from 781 m to 784 m3.8% from 784 m to 787 m5.6% from 787 m to 792 m9.7% from 792 m to 795 m3.2% from 795 m to 798 m10.7% from 798 m to 801 m3.6% from 801 m to 804 m9.1% from 804 m to 807 m3.1% from 807 m to 810 m5.8% from 810 m to 816 m5.4% from 816 m to 821 m6.1% from 821 m to 826 m4.5% from 826 m to 831 m8.1% from 831 m to 834 m5.3% from 834 m to 838 m5.2% from 838 m to 844 m5.4% from 844 m to 848 m5.1% from 848 m to 851 m5.6% from 851 m to 855 m6.1% from 855 m to 858 m7.5% from 858 m to 862 m5.1% from 862 m to 866 m5.7% from 866 m to 872 m4.9% from 872 m to 876 m6.8% from 876 m to 880 m4.9% from 880 m to 884 m4.3% from 884 m to 889 m1.9% from 889 m to 894 m4.7% from 894 m to 898 m2.5% from 898 m to 902 m2.6% from 902 m to 906 m2.5% from 906 m to 910 m5.1% from 910 m to 914 m1.9% from 914 m to 919 m1.9% from 919 m to 925 m2.9% from 925 m to 932 m2.3% from 932 m to 936 m4.8% from 936 m to 940 m0.0% from 940 m to 944 m2.4% from 944 m to 948 m2.5% from 948 m to 952 m3.1% from 952 m to 961 m1.9% from 961 m to 967 m2.4% from 967 m to 971 m3.4% from 971 m to 977 m1.8% from 977 m to 982 m2.0% from 982 m to 987 m3.2% from 987 m to 993 m2.4% from 993 m to 998 m2.1% from 998 m to 1.0 km3.8% from 1.0 km to 1.0 km1.7% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km3.6% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km3.5% from 1.0 km to 1.0 km1.6% from 1.0 km to 1.0 km3.7% from 1.0 km to 1.0 km3.6% from 1.0 km to 1.1 km2.9% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km4.6% from 1.1 km to 1.1 km4.0% from 1.1 km to 1.1 km6.7% from 1.1 km to 1.1 km5.7% from 1.1 km to 1.1 km6.3% from 1.1 km to 1.1 km7.8% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km8.1% from 1.1 km to 1.1 km7.8% from 1.1 km to 1.1 km7.3% from 1.1 km to 1.1 km9.3% from 1.1 km to 1.1 km8.3% from 1.1 km to 1.1 km7.5% from 1.1 km to 1.1 km9.5% from 1.1 km to 1.2 km8.3% from 1.2 km to 1.2 km10.3% from 1.2 km to 1.2 km9.4% from 1.2 km to 1.2 km8.3% from 1.2 km to 1.2 km15.4% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.2 km7.7% from 1.2 km to 1.2 km9.5% from 1.2 km to 1.2 km9.5% from 1.2 km to 1.2 km13.8% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km9.1% from 1.2 km to 1.2 km16.7% from 1.2 km to 1.2 km4.3% from 1.2 km to 1.2 km10.0% from 1.2 km to 1.2 km6.9% from 1.2 km to 1.2 km6.3% from 1.2 km to 1.2 km8.8% from 1.2 km to 1.2 km8.0% from 1.2 km to 1.2 km7.1% from 1.2 km to 1.2 km9.4% from 1.2 km to 1.2 km8.3% from 1.2 km to 1.2 km7.7% from 1.2 km to 1.2 km13.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km13.8% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km6.3% from 1.2 km to 1.2 km5.9% from 1.2 km to 1.3 km11.1% from 1.3 km to 1.3 km3.6% from 1.3 km to 1.3 km6.3% from 1.3 km to 1.3 km5.9% from 1.3 km to 1.3 km9.1% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km2.9% from 1.3 km to 1.3 km5.8% from 1.3 km to 1.3 km5.1% from 1.3 km to 1.3 km5.0% from 1.3 km to 1.3 km5.7% from 1.3 km to 1.3 km3.5% from 1.3 km to 1.3 km4.3% from 1.3 km to 1.3 km4.2% from 1.3 km to 1.3 km3.5% from 1.3 km to 1.3 km1.4% from 1.3 km to 1.3 km1.8% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-7.0% from 1.3 km to 1.3 km4%2%5%5%6%3%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.35 km / 0.84 miles
Elevation gain61.1 m / 200 ft
Average gradient4.5%
Maximum gradient10.7%
Elevation high231.9 m / 761 ft
Elevation low170.2 m / 558 ft
Climb difficulty score6,105.99

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Daisbach Sprint
Waibstadt, Rhein-Neckar-Kreis
1.28 km3.8%49 m
Waibstadt - Epfenbach No 1
Waibstadt, Rhein-Neckar-Kreis
0.73 km6.6%48 m
Radweg Waibstadt -> Daisbach
Waibstadt, Rhein-Neckar-Kreis
2.52 km2.6%66 m
Rohrbach - Adersbach
Waibstadt, Rhein-Neckar-Kreis
2.4 km2.2%82 m
UP Hoffenheimer Weg
Waibstadt, Rhein-Neckar-Kreis
0.53 km7%37 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 943,954th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 67,814th most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 16,279th out of 40,169 cycling climbs in Baden-Württemberg.

Ranks 629th out of 1,375 cycling climbs in Rhein-Neckar-Kreis.

🥈️

This is the second most difficult cycling climb in Waibstadt.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb