Punch von Horrenberg nach Tairnbach

📍
A 6, Am Hohberg, Horrenberg, Dielheim, Verwaltungsgemeinschaft Wiesloch, Rhein-Neckar-Kreis, Baden-Württemberg, 69234, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Punch von Horrenberg nach Tairnbach...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Punch von Horrenberg nach Tairnbach.

175 m190 m210 m225 m0.0% from 0 m to 3 m5.9% from 3 m to 7 m7.4% from 7 m to 10 m14.3% from 10 m to 12 m9.1% from 12 m to 15 m6.3% from 15 m to 18 m7.4% from 18 m to 20 m13.8% from 20 m to 23 m4.3% from 23 m to 28 m8.3% from 28 m to 30 m16.7% from 30 m to 33 m7.7% from 33 m to 35 m9.1% from 35 m to 38 m7.7% from 38 m to 40 m12.5% from 40 m to 42 m6.1% from 42 m to 45 m7.1% from 45 m to 48 m0.0% from 48 m to 51 m6.5% from 51 m to 54 m0.0% from 54 m to 57 m0.0% from 57 m to 61 m0.0% from 61 m to 65 m0.0% from 65 m to 68 m-4.1% from 68 m to 72 m-3.9% from 72 m to 78 m-9.5% from 78 m to 82 m-3.4% from 82 m to 88 m-5.8% from 88 m to 94 m-3.7% from 94 m to 100 m-3.2% from 100 m to 106 m-2.8% from 106 m to 113 m-3.3% from 113 m to 119 m-2.7% from 119 m to 126 m0.0% from 126 m to 134 m0.0% from 134 m to 137 m0.0% from 137 m to 143 m0.0% from 143 m to 145 m9.5% from 145 m to 147 m0.0% from 147 m to 150 m0.0% from 150 m to 153 m0.0% from 153 m to 156 m0.0% from 156 m to 160 m5.3% from 160 m to 164 m0.0% from 164 m to 168 m0.0% from 168 m to 172 m5.4% from 172 m to 176 m0.0% from 176 m to 180 m0.0% from 180 m to 184 m4.9% from 184 m to 188 m0.0% from 188 m to 192 m0.0% from 192 m to 195 m5.7% from 195 m to 199 m0.0% from 199 m to 203 m0.0% from 203 m to 207 m4.9% from 207 m to 211 m0.0% from 211 m to 214 m4.9% from 214 m to 218 m0.0% from 218 m to 222 m7.1% from 222 m to 225 m0.0% from 225 m to 229 m4.3% from 229 m to 234 m0.0% from 234 m to 237 m5.7% from 237 m to 241 m0.0% from 241 m to 244 m5.9% from 244 m to 247 m5.6% from 247 m to 251 m0.0% from 251 m to 254 m4.9% from 254 m to 258 m0.0% from 258 m to 262 m6.5% from 262 m to 265 m0.0% from 265 m to 269 m5.3% from 269 m to 273 m0.0% from 273 m to 277 m5.0% from 277 m to 281 m0.0% from 281 m to 285 m6.1% from 285 m to 288 m0.0% from 288 m to 292 m4.9% from 292 m to 296 m0.0% from 296 m to 299 m0.0% from 299 m to 303 m4.9% from 303 m to 307 m5.9% from 307 m to 311 m0.0% from 311 m to 314 m5.4% from 314 m to 318 m0.0% from 318 m to 322 m5.0% from 322 m to 326 m5.9% from 326 m to 329 m0.0% from 329 m to 333 m5.7% from 333 m to 336 m4.1% from 336 m to 341 m0.0% from 341 m to 343 m3.7% from 343 m to 349 m5.7% from 349 m to 352 m0.0% from 352 m to 356 m6.2% from 356 m to 360 m0.0% from 360 m to 364 m6.5% from 364 m to 367 m0.0% from 367 m to 370 m8.3% from 370 m to 373 m0.0% from 373 m to 376 m3.3% from 376 m to 382 m5.7% from 382 m to 385 m5.4% from 385 m to 389 m6.5% from 389 m to 392 m6.7% from 392 m to 395 m0.0% from 395 m to 399 m5.9% from 399 m to 402 m5.9% from 402 m to 406 m7.4% from 406 m to 409 m4.9% from 409 m to 413 m11.8% from 413 m to 416 m5.9% from 416 m to 419 m7.4% from 419 m to 422 m5.3% from 422 m to 426 m6.7% from 426 m to 429 m7.4% from 429 m to 432 m11.1% from 432 m to 435 m6.2% from 435 m to 438 m6.9% from 438 m to 441 m12.1% from 441 m to 445 m6.9% from 445 m to 448 m4.9% from 448 m to 452 m6.3% from 452 m to 455 m11.8% from 455 m to 458 m7.4% from 458 m to 461 m4.9% from 461 m to 465 m6.5% from 465 m to 468 m5.6% from 468 m to 472 m6.1% from 472 m to 475 m4.2% from 475 m to 480 m5.6% from 480 m to 483 m6.2% from 483 m to 487 m9.5% from 487 m to 489 m7.1% from 489 m to 492 m11.8% from 492 m to 495 m4.9% from 495 m to 499 m5.9% from 499 m to 502 m14.8% from 502 m to 505 m7.4% from 505 m to 508 m5.7% from 508 m to 511 m9.1% from 511 m to 514 m10.3% from 514 m to 517 m4.3% from 517 m to 522 m7.7% from 522 m to 525 m5.6% from 525 m to 528 m7.4% from 528 m to 531 m5.9% from 531 m to 534 m12.1% from 534 m to 538 m6.9% from 538 m to 541 m8.3% from 541 m to 543 m5.4% from 543 m to 547 m7.4% from 547 m to 549 m5.9% from 549 m to 553 m6.1% from 553 m to 556 m7.1% from 556 m to 559 m5.9% from 559 m to 562 m7.7% from 562 m to 565 m0.0% from 565 m to 567 m5.9% from 567 m to 571 m6.5% from 571 m to 574 m0.0% from 574 m to 577 m5.9% from 577 m to 581 m5.9% from 581 m to 584 m0.0% from 584 m to 588 m6.5% from 588 m to 591 m5.0% from 591 m to 595 m0.0% from 595 m to 598 m6.7% from 598 m to 601 m5.0% from 601 m to 605 m0.0% from 605 m to 608 m5.9% from 608 m to 612 m5.6% from 612 m to 615 m0.0% from 615 m to 619 m4.1% from 619 m to 624 m5.9% from 624 m to 628 m6.2% from 628 m to 631 m6.5% from 631 m to 634 m7.1% from 634 m to 637 m10.5% from 637 m to 641 m8.7% from 641 m to 643 m6.7% from 643 m to 646 m6.2% from 646 m to 649 m6.5% from 649 m to 652 m7.4% from 652 m to 655 m14.8% from 655 m to 658 m7.4% from 658 m to 660 m10.0% from 660 m to 664 m6.5% from 664 m to 667 m16.0% from 667 m to 670 m7.4% from 670 m to 673 m16.7% from 673 m to 675 m16.7% from 675 m to 677 m9.1% from 677 m to 680 m15.4% from 680 m to 682 m10.0% from 682 m to 684 m16.7% from 684 m to 687 m22.2% from 687 m to 688 m6.9% from 688 m to 691 m16.0% from 691 m to 694 m9.5% from 694 m to 696 m15.4% from 696 m to 699 m9.5% from 699 m to 701 m16.0% from 701 m to 703 m8.7% from 703 m to 705 m14.8% from 705 m to 708 m11.8% from 708 m to 710 m13.3% from 710 m to 713 m9.5% from 713 m to 715 m17.4% from 715 m to 717 m9.5% from 717 m to 719 m14.8% from 719 m to 722 m8.0% from 722 m to 725 m9.5% from 725 m to 727 m20.0% from 727 m to 729 m7.7% from 729 m to 731 m18.2% from 731 m to 733 m9.5% from 733 m to 736 m8.7% from 736 m to 738 m7.7% from 738 m to 740 m16.0% from 740 m to 743 m9.5% from 743 m to 745 m8.0% from 745 m to 748 m8.7% from 748 m to 750 m14.8% from 750 m to 753 m11.1% from 753 m to 754 m6.9% from 754 m to 757 m9.5% from 757 m to 759 m16.0% from 759 m to 762 m8.7% from 762 m to 764 m8.7% from 764 m to 766 m8.0% from 766 m to 769 m9.5% from 769 m to 771 m20.0% from 771 m to 773 m9.5% from 773 m to 775 m10.0% from 775 m to 777 m14.8% from 777 m to 780 m9.1% from 780 m to 782 m10.5% from 782 m to 784 m5.0% from 784 m to 788 m13.3% from 788 m to 791 m14.3% from 791 m to 792 m16.7% from 792 m to 794 m10.0% from 794 m to 796 m16.0% from 796 m to 798 m9.1% from 798 m to 800 m5.9% from 800 m to 804 m12.9% from 804 m to 807 m9.5% from 807 m to 809 m10.0% from 809 m to 811 m16.7% from 811 m to 813 m9.1% from 813 m to 815 m7.7% from 815 m to 818 m10.5% from 818 m to 820 m14.3% from 820 m to 821 m9.1% from 821 m to 824 m2%5%8%11%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.82 km / 0.51 miles
Elevation gain44.2 m / 145 ft
Average gradient5.4%
Maximum gradient14.5%
Elevation high222.8 m / 731 ft
Elevation low178.6 m / 586 ft
Climb difficulty score4,422.2

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Oberhof-Meckesheim-Hill
Horrenberg, Rhein-Neckar-Kreis
0.91 km4.6%42 m
Eichholz uphill
Horrenberg, Rhein-Neckar-Kreis
0.74 km4.7%35 m
Oberhof Waldrand uphill
Horrenberg, Rhein-Neckar-Kreis
0.72 km4.4%32 m
Tairnbach Terror
Horrenberg, Rhein-Neckar-Kreis
1.22 km4.8%58 m
Horrenberg Climb 50/50
Horrenberg, Rhein-Neckar-Kreis
1.2 km5.7%69 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,200,045th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 89,881st most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 20,912th out of 40,169 cycling climbs in Baden-Württemberg.

Ranks 795th out of 1,375 cycling climbs in Rhein-Neckar-Kreis.

🏵️

A local climb of note, this is the 6th most difficult cycling climb (out of 15 climbs) in Horrenberg.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb